Title Page

  • Site conducted

  • Date & Time

  • Task

  • Work Area

  • Prepared by

LIFTING OPERATIONS

Mechanical Integrity of Crane

  • Have I completed the pre operational inspection specific to the crane, confirming it is safe for use? (including crane certification)<br>

Mechanical Integrity of Lifting Equipment

  • Are the lifting equipment and lifting points safe for use? i.e. inspected with no defects<br>

Lifting Plan Execution

  • Is the weight of the load within the capacity of the current crane configuration and lifting equipment arrangement?

  • Do weather and ground conditions allow for a safe lift?

  • Is the lift area free from overhead power lines and other obstructions?

  • Does the work team have agreed communication methods? E.g. radio, spotter, hand signals.

  • Has the load been rigged as per the lift plan?<br>

Barriers and Segregation

  • Are controls in place to prevent unauthorised access?<br>

  • Is the exclusion area large enough to protect people from the lifting operation? E.g. falling load, crane movement

  • Is there a method to ensure authorised personnel maintain a safe distance from the suspended load? E.g. tag lines<br>

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.