Title Page

  • Site conducted

  • Conducted on

  • Prepared by

  • Location
  • Staff member on site

Site info

  • Is there onsite parking?

  • Opening times

  • Are there gates, fixed bollards, line marking, approximate size of area, and fencing.

  • Are any permits for work required?

  • What is required?

  • Is there any stock stored onsite?

  • What is stored where (just for a rough idea)?

  • Is there anywhere for engineers to keep access equipment or spares onsite?

  • Locations

Assets on site

  • Auto Doors on site

  • Number of auto doors on site

  • Locations of auto doors

  • Dry Risers on site

  • Please advise how many floors does this serve

  • Air conditioning (Condensers and Cassette unit)

  • List equipment details (including locations)

  • Photos of equipment (including data plates, working environment)

  • Access issues?

  • What is required to gain access?

  • Fresh air supply (Air Handling Units)

  • Location of unit

  • Size of filters

  • Access issues?

  • What is required to gain access?

  • Extraction

  • Type of Extraction on site (toilet/kitchen)

  • location

  • Access issues?

  • What is required to gain access?

  • Distribution boards. Please take 3 photos of each DB (1 x to show location and space around DB, 1 x to show Circuit list, and 1 x with the cover off to see internal space of DB)

  • Number of distribution Boards

  • Approximate number of circuits across all boards

  • Make and model of boards

  • Lightning Protection system present

  • Emergency lighting

  • Can testing be conducted in hours via keyswitches

  • Are the emergency light plans (drawings) on site?

  • Access issues?

  • What is required to gain access?

  • Evacuation Chairs present

  • Please advise number of Evacuation chairs on site

  • Please advise locations of Evacuation chairs

  • Fire alarm

  • Make

  • Model

  • Location

  • Addressable

  • Date on Batteries

  • Connected to Remote Monitoring station

  • Number of call points?

  • Number of smoke detectors?

  • Number of heat detectors?

  • Number of optical detectors?

  • Access issues?

  • What is required to gain access?

  • Fire Doors on site

  • Number of fire doors on site

  • Intumescent strips all in tact

  • Fire extinguishers

  • Number of CO2

  • Number of Foam

  • Number of Water

  • Number of Dry Powder

  • Number of Wet Chemical

  • Number of Fire Blankets

  • Smoke vents present

  • Please advise number of smoke vents present

  • Sprinklers installed on site

  • is the sprinkler system connected to a landlord?

  • are all sprinkler heads clear of obstructions

  • Are there sprinkler pumps onsite?

  • Gas

  • Gas Meter location

  • Gas appliances

  • Gas Boiler

  • Number of boilers

  • Make

  • Model

  • Location

  • Photo of appliance

  • Gas Catering Equipment

  • Number of appliances

  • Type of appliances

  • Locations

  • Photo of appliances

  • Hot water supply (electric)

  • Number of electric water heaters

  • Locations of equipment

  • Types of equipment

  • Photos of equipment

  • Lifts on site

  • Number of Goods lifts

  • Number of passenger lifts

  • Roof Safety Equipment present

  • Mansafe (horizontal wire system) present

  • Fixed access ladder present

  • Eye bolts present

  • fixed gantries or walkways present

  • Shutters present

  • Number of shutters

  • number of window shutters

  • Are there any other additional assets?

  • What, how many and locations?

  • CCTV System Present

  • Make

  • Model

Documentation review

  • Asbestos survey on site

  • Is asbestos present?

  • Were there any actions other than Monitor or manage?

  • Please take a photo of the actions page

  • Date of last survey

  • Survey undertaken by (name of company)

  • Fire risk assessment on site

  • Date of last assessment

  • Assessment undertaken by (name of company)

  • Emergency lighting certificate present

  • Date of last test

  • Please take a photo of the certificate

  • Is there evidence of a 3 hour test within the last 12 months

  • Were there any failures noted

  • is there evidence that any remedial works have been undertaken

  • Fire alarm certificate present

  • Date of last test

  • Were there any remedial works identified as per the certification

  • is there evidence that 100% of the system has been tested over the last year

  • Please take a photo of the certificate

  • Fire extinguishers certificate present

  • Date of last inspection

  • Any failures/replacements identified

  • Please take a photo of the certificate

  • Fixed wire test certificate present

  • Date of last inspection

  • Was 100% of the installation inspected in the last 5 years

  • Satisfactory/unsatisfactory

  • Number of C1 observations

  • Number of C2 observations

  • Number of C3 observations

  • Number of FI observations

  • Please take a photo of the observations page

  • Gas certificate present

  • Date of last test

  • Name of contractor who completed inspection

  • Were all appliances Safe to Use

  • Was a warning notice issued

  • Please take a picture of the warning notice

  • Please take a photo of the certificate

  • Sprinkler certificate present

  • Date of last inspection

  • name of contractor who completed inspection

  • Please take a photo of the certificate

  • Auto Doors certificate present

  • Date of last inspection

  • name of contractor who completed inspection

  • Were any failures mentioned

  • Please take a photo of the certificate

  • Dry riser certification present

  • Date of last inspection

  • name of contractor who completed inspection

  • Please take a photo of the certificate

  • Lightning Protection certificate present

  • Date of last inspection

  • name of contractor who completed inspection

  • please take a photo of the certificate

  • Evacuation chair certificate present

  • Date of last inspection

  • name of contractor who completed inspection

  • please take a photo of the certificate

  • Fire doors certificate present

  • Date of last inspection

  • name of contractor who completed inspection

  • were any remedial works identified

  • please take a photo of the certificate

  • Smoke Vents certificate present

  • Date of last inspection

  • name of contractor who completed inspection

  • please take a photo of the certificate

  • Lift Insurance certification available

  • Date of last inspection

  • name of company who undertook insurance inspection

  • please take a photo of the certificate

  • Roof safety certificate present

  • Date of last inspection

  • name of contractor who completed inspection

  • please take a photo of the certificate

  • Shutters certification

  • Date of last inspection

  • name of contractor who completed inspection

  • please take a photo of the certificate

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.