Welcome
-
Audit Title
-
Document No.
-
Conducted on
-
Client / Site
-
Personnel
-
Location
-
Prepared by
Sections
Work area
-
Site access and egress
-
Storage, site free from materials likely to fall
-
Suitable access equipment supplied, base lift scaffold, full scaffold, aluminium access system
-
Work in confined space, ventilated area
-
Asbestos survey present
-
Survey type
-
Details of survey made available to operatives
-
Asbestos training of operatives<br>
-
Date of survey
-
Weather permits the task to be undertaken
-
Operatives aware of the accident, incident, near miss reporting procedure
-
Operatives aware of risk assessments for specific tasks
Task being undertaken
-
Dry lining and plastering
-
Use of eye protection
-
Use of gloves
-
Use of overalls
-
Effective skin protection e.g. Barrier cream
-
Use of RPE
-
COSHH assessment sheets available
-
Correct manual handling procedures
-
Ventilated work area
-
Segregation of electricity and water
-
Painting
-
Use of relevant PPE
-
Use of RPE
-
Effective skin protection e.g. Barrier cream
Smart Fields
Dynamic Fields
Last Section
-
Add signature
New Items
-
Add media