Bass Pro Anchorage #1309
-
Site Location: Alaska
-
Time and Date: April 30, 2014
-
Project: Bass Pro
-
Superintendent: Bob Broeker
-
Project Manager: Tim Roland
-
Subcontractor Hours for Thursday - Wednesday: 2745 man hours
-
Number of Subcontractor Companies onsite: 12
Safety Meetings
-
Safety is discussed during weekly progress meetings?
-
Are Meeting Minutes documented?
-
Does every subcontractor supervisor attend safety meetings?
-
Is the SDS Binder location discussed during each weekly job site progress meeting?
Administrative Actions
-
Was the Monday morning toolbox talk turned in to Safety Department by 9am?
-
Was the Weekly Job Site Safety Evaluation turned in on Wednesday with sub hours filled out before 5pm?
-
Are the Federal / State posters posted up on job office wall?
-
Is the First Aid Cabinet stocked?
-
Is all visitor PPE fully stocked (5 hard hats, 5 vests, 5 safety glasses)?
5SP
-
Is the 5SP handed out in the Safe Start Meeting at least 2 weeks prior to subcontractor starting work?
-
Is all paperwork for subcontractor completed and turned in prior to start of work?
-
Has a Job Hazard Analysis been turned in by each subcontractor and updated if their scope of work changes?
-
Has the subcontractor submitted the competent person contact list?
-
Has the subcontractor submitted the Subcontractor Safe Start Submittal Checklist?
-
Are OSHA 10 cards collected and posted for each subcontractors competent person?
Haz Comm and SDS
-
Has each subcontractor submitted their company Haz Comm program?
-
Are all SDS Binders readily available on site for each subcontractor?
Housekeeping & Sanitation
-
Is the project clean, orderly, and free of excess trash and debris?
-
Are trash receptacles / dumpsters provided and maintained?
-
Are materials and equipment clean, properly stored, and orderly?
-
Are materials from upper floors secured and not a risk for being a "struck-by" hazard?
-
Is there an appropriate number of temporary toilets for the manpower on site?
Fall Protection and Perimeter Protection
-
Are fall protection plans documented (steel erection / decking / roofing)?
-
Do guard rails include a Toe-board, Mid-rail, Top-rail with the Top-rail being 38-42" in height and withstand 200lbs of force?
-
Are personal fall arrest systems in use when there are no guardrails at 6ft or higher?
-
Is fall protection being worn at all times while using a boom lift?
-
Is wire cable flagged every 6ft?
-
Are controlled access zones established with physical barriers and signs?
-
Are fall arrest systems inspected prior to each use by a competent person?
Ladders
-
Are ladders properly being used and maintained / inspected?
-
Are extension ladders / stairs properly extended 3ft above landing surface?
-
Are extension ladders properly tied off?
-
Are there two means of access / egress provided to upper / lower working levels?
-
Are all access / egress points of ladders and stairs clean and free of debris?
Scaffolds
-
Are scaffold tags in place & inspected daily by a competent person (Green Tag / Red Tag)?
-
Are scaffolds erected properly and maintained?
-
Are scaffolds erected on a firm surface with a baseplate and / or mud sill?
-
Are there Toe-boards, Mid-rails, and Top-rails in place?
-
Is the scaffold tied off every 25ft in height?
-
Is there proper access and egress for the scaffold?
-
Are there swing gates provided for vertical ladders?
-
Is the competent person signature sheet filled out daily?
-
Are daily inspections conducted by the competent person?
Floor and Wall Openings
-
Are hole covers inspected and maintained on a daily basis?
-
Are all holes greater than 2" in diameter covered, marked "HOLE", and secured?
-
Are workers protected from falling objects?
-
Do all covers support at least twice the maximum intended load?
-
Are windows that are lower than 38" secure?
Excavations
-
Is a competent person present during all excavation work?
-
Has underground utilities been reviewed / identified prior to excavating?
-
Are ladders provided for access / egress within 25ft of any worker?
-
Has proper sloping / benching / shoring / boxing taken place for any excavations greater than 5ft in depth?
-
Is there a physical barrier provided at the top edge of excavation work?
-
Are all spoils placed at a minimum of 2ft from the edge?
-
Is all heavy equipment at a safe distance from the edge?
-
Are daily inspections being conducted by the competent person?
-
Is the competent person sign off sheet filled out daily?
Temporary Lighting
-
Are lights provided throughout the project for access / egress routes?
-
Is there adequate task lighting provided for each employee? (5cf)
-
Is the temporary lighting inspected on a regular basis?
-
Is the temporary lighting properly protected? (Bulbs guarded by cages)
-
Are there lights provided for access / egress points around the perimeter of the project?
Electrical
-
Are electrical cords being inspected on a daily basis?
-
Do all electrical cords have this weeks color code taped on the male end?
-
Are electrical cords being elevated or ran along the wall to prevent damage and / or tripping hazards?
-
Are all 120v power supplies connected to a GFCI?
-
Are all electrical splices properly protected?
-
Are all panels, disconnects, and breakers properly protected and labeled?
Fire Protection
-
Are fire extinguishers provided for every 3,000 sq/ft of building space?
-
Are all fire extinguishers inspected frequently, in good working order, and serviced annually?
-
Are the inspection tags attached to all fire extinguishers on site?
-
Are fire extinguishers located in areas that welding or cutting is active?
-
Are evacuation routes posted and all workers are informed of a designated gathering point?
Cranes and Rigging
-
Are cranes inspected on a daily basis and all documentation is filed?
-
Has all certifications for cranes and rigging been turned into Timberlake before start of work?
-
Has rigging equipment been inspected before each use and stored properly?
-
Are proper rigging tags secured to all rigging devices?
Personal Protective Equipment
-
Is eye protection being worn at all times by everyone on site?
-
Are hard hats being worn at all times by everyone on site?
-
Are Hi-Viz Reflective vests / shirts being worn at all times by everyone on site?
-
Is hearing protection being used around high noise sources producing 85dBA and above?
-
Are gloves being worn at all times while handling sharp materials / tools / objects?
Pedestrian Protection
-
Is the job site fence installed, inspected, and maintained around the perimeter of the project daily?
-
Are all visitors checking in to field office and signing visitors form with a Timberlake employee present?
-
Are traffic control procedures in place and maintained?
-
Are flaggers being used for work around the road?
Hand and Power Tools
-
Are all hand and power tools inspected and maintained on a daily basis?
-
Are all proper guards in place and maintained on a daily basis?
-
Are power tools grounded (3 prong plug) and / or double insulated?
-
Are all cords in good working condition?
-
Are all documented certifications turned into Timberlake before start of work?
Flammable and Combustible Liquids
-
Are Flammable / Combustible liquids being stored and handled properly?
-
Are all containers properly labeled?
-
Is there a proper fire extinguisher provided within 50ft of any area being used for storage?
-
Is there no smoking / open flame signs secured near all storage areas?
-
Are all flammable / combustible liquids stored at least 10ft from stairwells / elevators / exits?
Signage
-
Are signs adequate to protect the public from job hazards?
-
Are exit signs provided and secured throughout the site?
-
Is safety signage posted on perimeter of the fence near gates?
-
Is the provided Timberlake Construction Signage Package for that site posted?
Implement Protection
-
Is all reinforcing steel less than 54" above working surfaces protected?
-
Are all protruding rods, conduit, or similar devices protected?
-
Are all caps / covers maintained throughout the site on a daily basis?
-
Is all scrap material free of protruding nails or any other puncture hazard?
Acknowledgement
-
Superintendent Signature: