Information

  • Audit Title

  • Document No.

  • Conducted on

  • Location
  • Property Address

  • Inspected by

External Fabric Condition

  • Is the roof in satisfactory condition?

  • Are the gutters and drain pipes in satisfactory condition?

  • Are the windows and doors in satisfactory condition?

  • Is the cladding in satisfactory condition?

Internal Fabric Condition

  • Are the ceilings in a satisfactory condition?

  • Are the walls in a satisfactory condition?

  • Are the floors in a satisfactory condition?

  • Are the fixtures and fittings in a satisfactory condition?

Insurance Requirements

  • Is the property secure?

  • Is the property clear of rubbish?

  • Is the asbestos register available?

Statutory compliance_Minimum

  • What is the compliance score at time of audit?

Asbestos

  • Has an asbestos survey been undertaken?

  • Is a management plan in place and operational?

Electrical

  • Has a fixed wiring inspection been completed in the past 5 years or 20% in past 12 months?

  • Has PAT testing been completed in the past 12 months?

  • Has the emergency lighting been 1/2 hr tested on a monthly basis?

  • Has the emergency lighting been tested 3 hr in the past 12 months?

  • Has the lightning protection been tested in the past 48 weeks?

Fire

  • Has the fire alarm panel been maintained in the past 12 months?

  • Has the call points been tested weekly?

  • Has the smoke extract system been maintained in the past 12 months?

  • Has the dry riser been maintained in the past 12 months?

  • Has the fire extinguishers been maintained in the past 12 months?

  • Has there been a fire drill in the past 6 months?

Gas

  • Has all gas appliances been tested in the past 12 months?

Water Management

  • Has a water risk assessment been undertaken in the past 2 years?

  • Has all actions been resolved from the WRA?

  • Unless directed otherwise by your WRA has sampling been undertaken and any remeadials undertaken?

  • Unless directed otherwise by your WRA has monthly temperature testing been undertaken +55 (hot), below -20 (cold)?

  • Has weekly flushing been undertaken on all little used outlets?

Lifting & Insurance Inspections

  • Has all lifts been maintained qtly?

  • Has all LOLER reports been completed in the past 6 months?

  • Has all fixed ladders been inspected in the past 6 months?

  • Has all pressure vessels been insurance inspected in the past 6 months?

  • Has all lifting tracks (shutters) been inspected in the past 6 months?

Mansafe

  • Has all mansafe systems been inspected in the past 12 months?

Risk assessments

  • Has a Fire Risk Assessment been undertaken/reviewed in the past 12 months (formal assessment must happen at a min every 5 years)

  • Has all actions been closed?

  • Has a H&S Risk Assessment been undertake/reviewed in the past 12 months (formal assessment must happen at a min every 5 years)

  • Has all actions been closed?

DDA

  • Has a DDA been completed (if required)

EPC

  • Has an EPC survey been undertaken in the past 8 years?

General H&S concerns

  • Risks

  • Risks

  • Risks

  • Risks

  • Risks

  • Risks

  • Risks

  • Risks

  • Risks

  • Risks

General Observations

  • Comment

  • Comment

  • Comment

  • Comment

  • Comment

  • Comment

  • Comment

  • Comment

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.