Title Page

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

  • MEP install complete and inspected

  • MEP installed in correct locations

  • In wall blocking complete and in correct location

  • Required openings are framed and verified

  • No dissimilar metals

  • Structural steel fireproofed where required

  • Penetrations through slab are properly fire caulked/sealed

  • Studs properly secured to deep leg slip track where required

  • Properly insulated

  • All required inspections complete

  • Stud bays clean and clear of debris

  • Photos

  • Add signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.