Title Page
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
Safety cables at openings and leading edge
-
Reinforcement steel size and spacing
-
Reinforcement steel properly chaired
-
Post Tension cables properly installed
-
Required embeds properly placed
-
MEP rough in complete
-
Required block outs/sleeving are installed
-
Formed area is clean and clear of debris
-
Area is safe to pour
-
Photos
-
AP Representative
-
Sub Contractor Representative