Information
-
Audit Title
-
Client
-
Location
-
Conducted on
-
Prepared By
-
Traffic Control Crew Leader
-
Traffic Controller(s)
Compulsory Requirements
-
Traffic Management Plan - Provided / Selected & Relevant
-
Where Any Changes To The TMP Documented
-
Attach Photo As Evidence
-
Approved MOA - Times, Location & Company Details Correct
-
Attach Photo As Evidence
-
Safe Work Method Statement - Present & Relevant
-
Attach Photo As Evidence
-
Job Safety Analysis - Present & Relevant
-
Attach Photo As Evidence
-
Traffic Controller(s) have Training Certificates
-
Attach Photo As Evidence
-
High Visibility PPE Worn By All Traffic Controllers Onsite
Worksite Setup
-
Does The Traffic Management Setup Comply With The Code Of Practice And AS1742.3
-
Is The Signage Spacing Adequate & Allows Good Visibility
-
Is Pedestrian Care Provided For (signed, no trip hazards)
-
Is The Clearance From Works To Traffic Maintained And The Speed Limit Applicable
-
Are The Required Sign / Devices / Equipment Available On Site
-
Worksite Setup
Audit Conclusion
-
Was The Traffic Management Setup Rectified Before The Auditor Left Site?
-
Is There Any Development / Additional Training Required
-
Crew Leader Signature
-
Auditors Signature