Information

  • Jobsite

  • Area

  • Room

  • Conducted on

  • Prepared by

  • Location
  • Personnel

Plumbing/HVAC Piping

  • Pipes fit inside of the wall

  • Pipes are stubbed out above the ceiling

  • Pipes are insulated

  • Pipe sleeves are inside of the wall

  • Copper water pipe is isolated from dissimilar metals

  • Pipe are properly supported in the wall

  • Pipes are sealed through floors and walls

  • Rough-in meets TAS requirements for height and clearance

  • Shower valves are roughed-in to allow for finishes

  • Medical gas piping is isolated from dissimilar metals

  • Carriers and backing are installed properly

  • Framing is installed for access doors

  • Shock arresters are installed

  • Riser clamps for copper are copper clad

  • Wall clean outs are installed where required and properly marked

  • Brass plugs are installed on in test tees

  • Test tees that can be covered are properly marked

  • Valves are accessible

  • All piping systems have been tested

  • All piping systems have been inspected

  • Nail plates are installed where required

  • Riser clamps are installed parallel with the wall

Sheetmetal

  • Fire - Fire/Smoke Dampers are installed correctly and framing has been checked

  • Framing will allow duct to be insulated

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.