Information
-
Jobsite
-
Area
-
Room
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Plumbing/HVAC Piping
-
Pipes fit inside of the wall
-
Pipes are stubbed out above the ceiling
-
Pipes are insulated
-
Pipe sleeves are inside of the wall
-
Copper water pipe is isolated from dissimilar metals
-
Pipe are properly supported in the wall
-
Pipes are sealed through floors and walls
-
Rough-in meets TAS requirements for height and clearance
-
Shower valves are roughed-in to allow for finishes
-
Medical gas piping is isolated from dissimilar metals
-
Carriers and backing are installed properly
-
Framing is installed for access doors
-
Shock arresters are installed
-
Riser clamps for copper are copper clad
-
Wall clean outs are installed where required and properly marked
-
Brass plugs are installed on in test tees
-
Test tees that can be covered are properly marked
-
Valves are accessible
-
All piping systems have been tested
-
All piping systems have been inspected
-
Nail plates are installed where required
-
Riser clamps are installed parallel with the wall
Sheetmetal
-
Fire - Fire/Smoke Dampers are installed correctly and framing has been checked
-
Framing will allow duct to be insulated