Information
-
Jobsite
-
Area
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
Excavation plan complete and turned in to the GC
-
Benching of excavation per safety plan
-
Grease/Oil/Sand Trap installed per plan and submittal
-
Proper materials being used per submittals
-
Proper slope on system
-
System installed per plan
-
Cleanouts installed as required by code
-
Pipe bedded properly with approved material
-
Risers and drains match what is drawn on contract drawings
-
Piping has been tested and inspected
-
Sleeve installed per spec, all risers through slab
-
Backfill material per submittals
-
Underground identification ribbon installed 12" below finished grade
-
Rough-in checked by Trimble after backfill before concrete pour
-
Riser ends protected from debris and trash entering the system