Information
-
Document No.
-
Site conducted
-
Client / Site
-
Client number
-
Conducted on
-
Prepared by
-
Location
-
PV Sol/ SolarEdge design attached
-
Type of survey conducted
-
Property type
- Detached
- Mid-Terrace
- End-Terrace
- Detached
- Bungalow
- Chalet Bungalow
-
How many Floors
System to be fitted
-
Energy provider
-
MPAN number
-
Supply meter serial number, make and model
-
Primary heating fuel type
Any renewables on site
-
what is installed
- Solar inverter
- Hybrid inverter
- AC Charger
- Tesla powerwall
- wind turbine
- other system
-
Pictures
-
Serial numbers
Roof type and construction
-
Select roof type
-
Select roof tile
- Wave tile
- Plain tile
- Pan tile
- Slate
- Trapezoid
- Flat
- Other
-
Number of roof's to be used ?
-
Can the install be completed with standard fixings
-
Roof orientation ( approximate )
- North
- South
- East
- West
- East / West combo
- South East
- South West
-
Draw or upload a sketch of roof
-
Upload google earth roof plan
-
Photo of roof to be installed
-
Structural been done
Roof structural
-
Roof Joist center to center
-
Rafter width
-
Rafter Depth
-
Rafter length
-
Attach BMG Survey
Module type and layout
-
Can standard modules be used without restriction
-
Is the roof clear of obstructions
-
Photo of roof obstructions
-
Are there any obvious shading issues
-
Describe level of shading
-
Will the installation meet the requirements given under central planning and building control regulations
Access equipment locations and issues
-
Type of access equipment required
-
Select additional access equipment required
-
Can all scaffold be erected easily
-
Photos of area scaffold will sit on the ground
Electrical
-
Picture of meter point including supply head
-
Earthing System
- TNCS (earth come out of the service head top or side)
- TNS (Eaarth is attached to the incoming cable to service head)
- TT ( earth electrode Rod/Tap fitted)
-
If TNCS is there soft ground nearby to install an earth electrode/ Spike
-
Photo of main AC connection point
-
Make of consumer unit
-
Is there space for a MCB/RCBO ?
-
Is the space RCD protected ?
-
Is a garage unit required ?
Materials required
-
undefined
Broadband
-
Does the client have broadband ?
-
I so can you see it on your phone at the install location
-
Is there a spare electrical socket that is not on an extension lead ?
AC cable route and containment
-
Describe AC cable route, containment requirement and length of run
-
Type of AC cable required
PV cable route and containment
-
Describe DC cable route, containment requirement and length of run
Sign off and management review
-
Surveyor
-
Director / Chief Engineer