Information

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

Page 1

Site Audit Information

  • Name of Technician

  • Name of TechSafe Auditor

  • Activity

  • Add location
  • Select date

Equipment Audit

  • Is the NST Tester Calibration current and up to date?

  • Serial Number

  • Calibration Date

  • Is the Multimeter Calibration current and up to date?

  • Serial Number

  • Calibration Date

  • Is the Insulation meter (Ohm Meter) Calibration current and up to date?

  • Serial Number

  • Calibration Date

Job Safety Analysis

  • Is the completed JSA available on site?

  • Is the Installer familiar with hazards associated with each task and work site?

  • Is the JSA signed and dated?

Traffic Management

  • Has pedestrian safety been taken into account?

  • Are there sufficient controls in place?

  • Is the forward warning appropriate? Eg Signage

  • Can vehicles / pedestrians pass the site safely?

  • Is all signage in a suitable condition for use?

  • Is the traffic management adequate?

Personal Protective Equipment

  • Is wrist to ankle coverage maintained as per the workforce management plan?

  • Are approved overalls / work clothing worn?

  • Is rubber soled, fully enclosed safety footwear in use by all personnel?

  • Are high visible vests in use by all personnel?

  • Are all the appropriate gloves worn?

  • Is the issue date on the LV gloves less than 6 mths from today's date?

  • Are Technicians wearing leather gloves over the top of the rubber LV Gloves?

  • Is the safety apparel all in good condition?

  • Is there any additional safety apparel required?

Page 2

Work Practices

  • Has the Installer notified the householder?

  • Is the worksite well protected?

  • Has the Installer followed the correct work instructions for the meter type?

  • Have all the testing requirements been carried out correctly?

  • Has the Installer used the correct PPE for the job?

  • Is the condition of the meter board / panel acceptable?

  • Does it need to be identified as a Defect?

  • Is the condition of the customer meter enclosure acceptable?

  • Is it identified as a customer Defect?

  • Has Asbestos been identified and steps, procedures followed?

  • Has all unused metering cables been removed or terminated?

  • Was the customer / occupier notified of the meter exchange?

  • Was an Information card left on site for the customer? Enter ESV Crd #

  • Has the work site been left tidy?

Technical Compliance Testing

  • Has the work area been tested to ensure it is de-energised?

  • Is the "Installation Under Test" signage available? And clearly Displayed?

  • Has all metering conductors been identified prior to isolation (Polarity Test)

  • Has existing phase sequence been established? (3 phase only)

  • Is the unhindered access to the meter isolation? (FOLCB, SPD, SDD)

  • Has metering equipment been tested for de-energised?

  • Has the NITP been confirmed?

  • Has the Check test been completed? (Including switched circuits)

  • Has the NST been completed?

  • Has existing phase sequence been completed (3 phase only)

  • Has the load test been completed?

  • Has control load test been completed (31.5 amp & 2 amp)

Metering

  • Is the correct meter installed at the correct address?

  • Is the correct meter installed for the installation?

  • Meter Type

  • Is the meter installed at correct level and height?

  • Is the metering equipment firmly secured to the board?

  • Are the correct fasteners used to secure metering equipment?

  • Is the metering equipment in good working order? Eg links, fuses, panel.

  • Are all tamper seals installed on metering equipment? (Meters, links, fuses)

  • Has antenna been installed correctly, where required?

  • Is the IP Rating of the meter cabinet maintained? (When antenna installed)

  • Has meter commissioning requirements been completed?

  • Is the Date and Time on the meter within +- 30 minutes of local time?

Mobile Equipment / Machinery / Vehicles / Plant

  • Are all vehicles on site registered?

  • What is the condition of the vehicle / plant on site? (Cleanliness)

  • Is all equipment adequately secured?

  • Does the vehicle have signage clearly displayed? (Jemena authorised contractor)

  • Is the vehicle in presentable condition?

  • Are stock levels including new and abolished stock handled in a safe and secure manner?

  • Does the vehicle contain appropriate PPE including installer equipment, witches hats, etc for the role performed?

Page 3

Task Skills

  • Does the installer have current training and refresher levels?

  • First Aid Due Date

  • NST Due Date

  • Asbestos Training Due Date?

  • Does the installer have their ID's?

  • Is the driver carrying their vehicle licence?

  • Is the licence appropriate for the class of vehicle?

Manual Handling

  • Have specific manual handling hazards been identified on the Job Safety Analysis?

  • Are personnel aware of manual handling hazards?

Tools Equipment / Electrical Test

  • Is all test equipment tested and tagged in test date range?

  • Does installer have the correct equipment to perform the work?

  • Has all field equipment been kept secure, safe and in good working order?

  • Is there a stocked first aid kit available on site?

  • Is the first aid kit in an adequate condition?

  • Is the installer carrying PDA car charger?

  • Can the install demonstrate how to send receive work?

  • Is the PDA in good physical condition and working order?

Forms / Documentation / Paperwork

  • Does installer have all documented procedures and with instructions to follow for work to be performed?

  • Does installer have documentation for the stock carried?

  • Does the installer have documentation to handle defects for escalations?

  • Does installer have documentation for handling customer complaints?

  • Does installer have documentation for potential emergency scenarios?

  • Does installer have a list of emergency numbers of who to call?

  • Has installer left Customer Advice Card at site & documented serial number in PDA?

  • Customer Advice Card Number

Communications

  • Is there a least one form of reliable communication on-site? Eg mobile, phone, radio etc.

  • Have Safety Alerts, Safety Grams been made available to the work crew?

  • Are the work crew aware and understand the incident reporting process?

General Comments

  • Enter comments

Vehicle Details

  • Registration of Vehicle

  • Registration Expiry Date

  • Vehicle Make, Model, Type

  • Condition / Comments

Signatures

  • Technician

  • Supervisor

  • TechSafe Auditor

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.