Pre Start Checks

  • Are permits in place, correct activities identified and are for the date of attendance?

  • Has site provider been notified of presence on site?

  • Has Site provider induction been performed (where required)?

  • Have you notified the Telecoms Operator of attendance on site?

  • Is an RF outage in place, for each technology (where required?

  • Is a copy of the site specific H&S Plan - Construction Phase Health & Safety Plan (CPHSP) and all Contractor Risk Assessment and Method Statement (RAMS) on site?

  • Have you assessed the CPHSP and RAMS to ensure they cover the work activities for the day?

  • Have you performed and on-site Dynamic Risk Assessment relating to your works to ensure that any new hazards are captured and mitigated? Copy to be sent to H&S team. Use Daily risk assessment document on I-Auditor.

  • Are all issues highlighted in the client site specific safety data relevant and mitigated?

  • Is on-site safety equipment, latch way, fixed ladders within inspection date (less than 12 months on tag)?

  • Have any modified work arrangements from the above questions been agreed with the PC’s Project Engineer before continuing?

  • Are other contractors, not under the appointing contractors’ control, present on site? If so, it must be identified in writing who is to be PC for the site

  • Have you delivered, verbally, a site induction including a summary of the contents of the CPHSP and Dynamic RAMS findings (including the welfare facilities and emergency arrangements – nearest hospital)?

  • Have all qualified first-aiders been identified during the induction?

  • Have all in attendance on site signed the CPHSP induction sheet to confirm they have read and understood the document and have the appropriate PPE for the works?

  • Are all attendees in possession of, in date, training and equipment certification for the works they are to perform?

  • Is there in-date certification, and have pre-use checks been performed, for all PPE equipment, lifting equipment and plant?

  • Is the site properly secured (barrier protection where public have nearby access)?

  • Are Principal Contractor Site Rules displayed? Refer to CPP.

  • Is a first aid kit (rescue kit and fire extinguisher as appropriate) close to the works area?

  • Has Traffic Management been set out completely before any works commence and do the public know (using signage) what is expected of them? If marshals are used or “Stop-Go” boards, good communication must be maintained between TM and workforce at all times

  • For Groundworks. Have stats plans been reviewed, CAT detectors been used, ground marked up with identified services and HSG 47 guidance being followed?

  • Are lift/berthing plans and TM plans present on site and adhered with?

  • Is the Eton (Symology) notice displayed on street works sites?

  • Where relevant, is the building Asbestos Register available and has it been checked to identify where it may affect works?

  • Are COSHH substances to be used, the hazards understood and COSHH sheets on site?

  • Are weather dependant works taking place – has the weather forecast been reviewed?

  • Is Covid-19 cleaning station in place at entry to site?

Post Start Checks

  • Are you controlling access to the site – ensuring that all who attends are inducted and have the appropriate certification? Be point of contact for visitors and auditors putting them through these checks

  • Are you ensuring the site is being kept clean and tidy?

  • Manual handling minimised and lifting accessories used where possible?

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.