Information
-
Document No.
-
Project Name
-
Conducted on
-
Prepared by
-
Location
-
Supervisor
Jobsite Inspection
General Safety/Housekeeping
-
General housekeeping is neat and orderly?
-
Health and Safety Plan available and reviewed with worker?
-
Concrete work? Silica dust training documented for all? Respirators?
-
Rebar cabs used for protruding bars?
-
Toolbox Talks-JSA's conducted and documented?
-
Signs/signals/barricades in place?
Ladder/Stair Safety
-
Ladders are safe and inspected as appropriate?
-
Stair rails- for 30" change in elevation or 4 riser?
-
Stairs or ladder provided or access points > 19" high?
-
Extension & straight ladders extend 3' beyond landing?
-
Stepladders are only used in open position?
Emergency First Aid Equipment
-
Emergency phone numbers posted and known by all?
-
Emergency eyewash and/or shower units accessible?
-
First aid kit available at worksite?
-
Fire extinguishers readily available (not blocked)?
-
Fire extinguishers inspected?
Confined Space Entry
-
Confined space entry work? Posted?
-
Permit for PRCS spaces?
-
Fire/Rescue notified for PRCS permitted spaces?
-
Air monitoring?
-
Training in place?
Personal Protective Equipment
-
-
Safety glasses and/or goggles available & being used .
-
Hand protection used/worn as required?
-
Foot protection worn as required .
-
Hearing protection worn where required?
-
Hard hats worn on construction site?
-
Fall protection, full body harness & lanyard used at > 6ft?
Hazard Communication
-
MSDS openly available to all employees?
-
Flammable liquids are in approved safety cans?
-
All hazardous containers labeled appropriately?
Material Handling
-
Hooks used for lifting have safety latch in place?
Electrical Safety
-
GFCI's used for all portable electrical hand tools?
-
Light bulbs for illumination protected from breakage?
-
For extension cords: hard usage cord includes three-wire cords marked S, ST, SO, STO, SJ, SJO, SJT, or SJTO.
-
Electrical cords inspected & have all prongs intact?
-
Electrical power tools are double insulated or grounded?
Scaffolding
-
Scaffolding-guard rails used?
-
Competent person on site?
-
Scaffold design by qualified person?
-
Platforms fully planked or decked?
-
-
Documented inspections by competent person .
Excavations
-
Excavation-ladders if > 4ft deep? Extend 3ft? 50ft apart?
-
Excavation-protection from cave-ins for > 5ft?
-
Slipping, shoring evaluated?
-
Daily inspection?
Field Office
-
Entrance/Exits/Steps?
-
Fire Exits/Extinguishers?
-
Electrical?
-
Flammable Liquids?
Sign Off
-
Supervisor's Signature
-
Auditor's Signature