Title Page
-
Centre
-
Tenancy Number
-
Tenancy Name
-
Completed By
-
Date Completed
Pre Construction Checklist
Shopfitter Insurance
-
Public Liability Insurance (min $20m)
-
Workers Compensation
-
Professional Indemnity
Drawings & Approvals
-
Final Design Approval has been granted by the Tenancy Coordinator
-
Authority Approvals have been received
-
Shopfitter has provided Construction Program
-
Agreed Waste Management Plan in place
-
Agreed bin location
Site Induction & WHS
-
Shopfitter has been provided Contractor Site HSE Induction Handbook (WHS-MAN-001)
-
Contractor Site Specific Induction Record (WHS-F-003) has been completed and returned
-
Shopfitter has provided site specific WHS document pack relevant to the scope of works
Tenancy Condition at Handover
General
-
Agreed Tenancy Condition at Handover
Condition of Base Building (include minimum of 2 photos of each)
-
Floor
- Smooth Concrete -Ready for new floor finish
- Existing Flooring
- Other (comment)
-
Ceiling
-
Walls
Services (include photos of each)
-
Mechanical / Air Conditioning
-
Mechanical / Exhaust
-
Fire Sprinklers
-
Fire Detection
-
Fire EWIS
-
Communication / Phone
-
Panel Capacity
-
Electrical
-
Switchboard capacity
-
Gas
-
Tenancy shut off valve sighted
Other
-
Hoarding Installed to tenancy
-
Hoarding installed by
-
Hoarding Certification Received (photo required)
-
Tenancy is clean & tidy
-
Other General Comments
Below to be signed by all parties in attendance at the Handover / Prestart Meeting
-
Signed for by Lessor
-
Signed for by Tenant
-
Name
-
Date