Information
-
Operator Certification Check List, Date Issued : 22 November 2010
-
Name, clock Number
-
Stamp Number
-
Operator's Department
-
1. Certification holder's approval card available?
Tap to enter information
-
Take photo :
-
Details (if required)
Tap to enter information
-
Details :
-
Compare last printed date on Approval Card to database.
-
2. Certification stamp(s) accounted for?
Tap to enter information
-
Details :
-
Compare the stamp(s) the person has to what the database states has been issued.
-
3. Certification stamp(s) are in good condition & legible?
Tap to enter information
-
Insert held certification Stamp(s) impression(s) here:-
-
Details (if required)
-
Record details of Manufacturing job card / paperwork being assessed?
-
Include page and element number if applicable.
-
Photo
-
Details
-
Record 'Drawing detail' below of element being assessed (if applicable ):-
-
From element / task being worked on, sample a drawing. If necessary go backwards to previous elements / tasks completed by person to obtain one.
-
Photo
-
Details
-
Record Process Specification / procedure in relation to job card / paperwork being assessed :-
-
From element / task being worked on, sample a process specification / procedure . If necessary go backwards to previous elements / tasks completed by person to obtain one.
-
Photo
-
Details
-
4. Certification holder has good knowledge to ensure that the correct Drawing / paperwork revision is being used (if applicable)?
Tap to enter information
-
In job cards, the last few pages (BOM) show revisions of drawings / documents.
-
Other paperwork may need to be checked against a system eg BMS , Smarter, etc
-
5. Certification holder has good knowledge to ensure that the correct job card / paperwork is being used and where any changes to the issue/revision status are recorded (if applicable)?
Tap to enter information
-
In job cards, two to three pages in should have any changes recorded.
-
In BMS documents, footer should state what revision document is at and be compared to system.
-
Customer documentation should be checked against customer interface system and/or via Project Engineer.
-
6. Does the certification holder have the necessary approvals for all tasks to be undertaken iaw job card / customer requirements?
Tap to enter information
-
Details :
-
Review task being conducted and compare to approvals held and in system to ensure person has correct one.
-
Review previous one or two elements stamped for correct approval.
-
7. Elements/ information within the job card/ paperwork has been stamped/ dated correctly (or signed as applicable)
-
8. Does the certification holder understand their responsibilities when applying their stamp alongside a probationary stamp or double stamping on aircraft documentation?
-
9. Knowledge of concessions / deviation / tag?
-
10. Does the certification holder have a good knowledge of the MRB / NC1 procedure / quarantined items?
-
11. Does the certification holder have a good knowledge on how to access the required process specifications, procedures and drawing information in relation to the job card element?
-
12. Does the certification holder demonstrate they have an understanding of the section of work they are undertaking?
Tap to enter information
-
Take photo (if required) :
-
Details:
-
13. Is calibration equipment being used?
Tap to enter information
-
Sample calibration equipment being used :
Calibration Equipment
-
Serial number
-
Type
-
Next calibration date
-
14. Is equipment listed above within time scales?
-
15. Is the person's work area tidy, clear of FOD, paint, sealant and ags within date?
Summary
-
Details
Tap to enter information
-
Details
Tap to enter information
-
Details
-
Date
-
Certification holder's signature
-
Auditor's signature