Information

  • Document No.

  • Site Location
  • Conducted on

  • Prepared by

  • Accompanied by

Your Own Safety

  • Have you read and are you able to comply with your Site Visit SWMS?

  • Do you know what PPE you need? and do you have it available for your visit?

  • Did you participate in a relevant Site Induction and Pre Work Brief (PWB) when you reached the Contractor's site?

  • Do you have the local site contract persons contact details? Have they been informed?

Site Safety

All Work Places including Offices

  • Knowledge of & access to PSMP (or relevant Contractors SSSMP)

  • Risk Level

  • Actions to close out

  • Closed (on=closed, off=open)

  • Emergency Evacuation Procedure posted and legible

  • Risk Level

  • Actions to close out

  • Closed (on=closed, off=open)

  • Fire Equipment available, signposted, good condition, tagged

  • Risk Level

  • Actions to close out

  • Closed (on=closed, off=open)

  • Emergency Egress clear

  • Risk Level

  • Actions to close out

  • Closed (on=closed, off=open)

  • Wardens appointed/ signposted

  • Risk Level

  • Actions to close out

  • Closed (on=closed, off=open)

  • Electrical leads checked/tagged (every 3 months on construction sites)

  • Risk Level

  • Actions to close out

  • Closed (on=closed, off=open)

  • Waste segregated

  • Risk Level

  • Actions to close out

  • Closed (on=closed, off=open)

  • Lighting adequate

  • Risk Level

  • Actions to close out

  • Closed (on=closed, off=open)

  • Amenities clean and hygienic (Toilets, lunchrooms etc)

  • Risk Level

  • Actions to close out

  • Closed (on=closed, off=open)

  • Hazardous substance register and MSDSs

  • Risk Level

  • Actions to close out

  • Closed (on=closed, off=open)

  • Safe Stacking and Storage

  • Risk Level

  • Actions to close out

  • Closed (on=closed, off=open)

  • Walkways, floors and aisles clear

  • Risk Level

  • Actions to close out

  • Closed (on=closed, off=open)

  • General housekeeping and cleanliness

  • Risk Level

  • Actions to close out

  • Closed (on=closed, off=open)

  • First Aid facilities available & First Aid officer signposted

  • Risk Level

  • Actions to close out

  • Closed (on=closed, off=open)

  • If Manual handling - SWMS available and followed

  • Risk Level

  • Actions to close out

  • Closed (on=closed, off=open)

  • Fencing & Security adequate, good condition.

  • Risk Level

  • Actions to close out

  • Closed (on=closed, off=open)

  • Community contact/ helpline available

  • Risk Level

  • Actions to close out

  • Closed (on=closed, off=open)

Additional Checklist for Construction Sites

  • Pre Work Brief recorded and signed by all workers.

  • Risk Level

  • Actions to close out

  • Closed (on=closed, off=open)

  • Construction work SWMS available and being followed.

  • Risk Level

  • Actions to close out

  • Closed (on=closed, off=open)

  • PPE requirements signposted, and PPE compliance, PPE branded

  • Risk Level

  • Actions to close out

  • Closed (on=closed, off=open)

  • Plant movement on site safe and controlled

  • Risk Level

  • Actions to close out

  • Closed (on=closed, off=open)

  • Work Permits in use for Construction Speace, Hotwork, Excavation, Work at Height.

  • Risk Level

  • Actions to close out

  • Closed (on=closed, off=open)

  • Plant operations. Licenses. Pre use checks recorded. Condition of plant.

  • Risk Level

  • Actions to close out

  • Closed (on=closed, off=open)

  • Lifting equipment. Up to date Tagging; in good condition.

  • Risk Level

  • Actions to close out

  • Closed (on=closed, off=open)

  • Scaffolding Inspected and Tagged. Condition, toe boards, mesh etc.

  • Risk Level

  • Actions to close out

  • Closed (on=closed, off=open)

  • Ladders in good condition. Non metallic for electrical work.

  • Risk Level

  • Actions to close out

  • Closed (on=closed, off=open)

  • Work at Height SWMS, PPE harness appropriately attached.

  • Closed (on=closed, off=open)

  • Risk Level

  • Actions to close out

  • Traffic Management Plan in place and working.

  • Risk Level

  • Actions to close out

  • Closed (on=closed, off=open)

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.