Information

  • CIS Assessment No.

  • Address

  • Conducted on

  • Prepared by

  • Personnel

General

  • Test instruments operation verified.

  • Type of installation

  • Is the installation energised.

  • Are there alternate sources of energy connected. E.g. Solar, UPS, standby generator.

  • Take action to isolate, lockout and tag alternate sources of energy.

Main Switchboard

  • Visual inspection conducted. Note earthing, cable entry points, markings and labels, location of main earth rod.

  • MEN connection intact

  • Position of main switch(s) and CPD,s noted

Consumers Mains

  • Are the consumer mains being tested/verified.

  • Size of consumer mains.

  • Number of Phases.

  • Insulation resistance.

  • Polarity

  • Neutral integrity

  • *****TAKE ACTION TO MAKE SAFE****

  • If the installation has been initially energised, it is assumed that the consumer mains have been inspected, tested and verified by the distribution entity,

Main and equipotential earthing

  • Location

  • Main earthing conductor continuity. (.5 Ohm max.)

  • Bonding conductor continuity. (.5 Ohm max.)

  • Earthing of metallic switchboard surrounds. (.5 Ohm max)

Circuit Testing

  • Circuit(s) to be tested have been isolated, locked out and tagged.

  • Circuit
  • Circuit Description

  • Details.

  • Sub-main is supplying.

  • Circuit Protection Details

  • RCD trip current

  • Is an RCD fitted to the circuit

  • RCD trip current

  • Is an RCD required to be fitted.

  • Circuit protection size.

  • Active conductor size.

  • Earth conductor size.

  • Visual inspection.

  • Earth continuity

  • Insulation resistance to earth.

  • Short circuit A to N

  • Polarity test Active(s).

  • Polarity test Neutral.

  • Interconnection between circuits.

  • Fault Loop Impedance Test

  • Ohms

  • Short Circuit Current: Amps

  • Fault loop impedence

  • Ohms

  • Short Circuit Current: Amps

  • RCD operation.

  • Test 1: 0° x ½ in mS

  • Test 2: 180° x ½ in mS

  • Test 3: 0° x 1 in mS

  • Test 4: 180° x 1 in mS

  • Test 5: 0° x 5 in mS

  • Test 6: 180° x 5 in mS

Exit Checks.

  • Switchboard secure

  • MEN connection intact

  • Main switch and circuit protection devices returned to original state. Lockouts removed.

  • Alternate sources of energy returned to service.

  • Walk through visual undertaken

  • Covers, access panels, manhole etc. replaced.

  • Tools and equipment returned to the vehicle.

  • Person in control advised of departure

DISCLAIMER

  • Only the circuits or part of the circuits described in this report have been verified. This report does not provide assurance that all electrical equipment in the installation has been verified.

  • Inspector

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.