Title Page

  • Document number

  • The Eleven. 1055 11 Street SW Calgary, AB. T2R 1G8
  • Building Operations. Todd Chalmers

Regal security services reports.

  • Monday. Security reports

  • Tuesday. Security reports

  • Wednesday. Security reports

  • Thursday. Security reports

  • Friday. Security reports

  • Disclaimer The assessors believe the information contained within this risk assessment report to be correct at the time of printing. The assessors do not accept responsibility for any consequences arising from the use of the information herein. The report is based on matters which were observed or came to the attention of the assessors during the day of the assessment and should not be relied upon as an exhaustive record of all possible risks or hazards that may exist or potential improvements that can be made.

☎️CACF Fire panel

  • Monday. Fire panel. 🚨Alarm Status____________________. 🚨Alarm History____________________.

  • Tuesday. Fire panel. 🚨Alarm Status____________________. 🚨Alarm History____________________.

  • Wednesday. Fire panel. 🚨Alarm Status____________________. 🚨Alarm History____________________.

  • Thursday. Fire panel. 🚨Alarm Status____________________. 🚨Alarm History____________________.

  • Friday. Fire panel. 🚨Alarm Status____________________. 🚨Alarm History____________________.

  • Disclaimer The assessors believe the information contained within this risk assessment report to be correct at the time of printing. The assessors do not accept responsibility for any consequences arising from the use of the information herein. The report is based on matters which were observed or came to the attention of the assessors during the day of the assessment and should not be relied upon as an exhaustive record of all possible risks or hazards that may exist or potential improvements that can be made.

✏️Building checks

Building checks

  • Parkade 1A commercial/handicap

  • Parkade 1B

  • Parkade 2

  • Parkade 3

  • Parkade 4

  • Parkade 5

  • 🛠Garbage Room

  • 🛠Mail room

  • 🛠Dog Wash

  • 🛠Residence Lounge

  • 🛠Floor 2

  • 🛠Floor 2 Communication Room

  • 🛠Floor 2 Main Electrical Room and Genarator Room

  • 🛠 Floor 2 Residence Meeting Room

  • 🛠Floor 3

  • 🛠Floor 3 Gym

  • 🛠Floor 3 Yoga Studio

  • 🛠Floor 3 Residence Lounge

  • 🛠Floor 3 Residence Meeting Room

  • 🛠Floor 3 BBQ’s Stations. 1. __________. 2. __________. 3. __________.

  • 🛠Floor 4

  • 🛠Floor 5

  • 🛠Floor 6

  • 🛠Floor 7

  • 🛠Floor 8. PRV-0__________. PRV-0__________. PRV-0__________.

  • 🛠Floor 9. PRV-0__________. PRV-0__________. PRV-0__________.

  • 🛠Floor 10

  • 🛠Floor 11

  • 🛠Floor 12

  • 🛠Floor 13

  • 🛠Floor 14

  • 🛠Floor 15

  • 🛠Floor 16. PRV-0__________PRV-0__________PRV-0__________.

  • 🛠Floor 17

  • 🛠Floor 18

  • 🛠Floor 19 mop-sink

  • 🛠Floor 20

  • 🛠Floor 21

  • 🛠Floor 22. PRV-0__________. PRV-0__________. PRV-0__________.

  • 🛠Floor 23

  • 🛠Floor 24

  • 🛠Floor 25

  • 🛠Floor 26

  • 🛠Floor 27

  • 🛠Floor 28

  • 🛠Floor 29

  • 🛠Floor 30

  • 🛠Floor 31

  • 🛠Floor 32

  • 🛠Floor 33

  • 🛠Floor 34

  • 🛠Floor 35

  • 🛠Floor 36

  • 🛠Floor 37

  • 🛠Floor 38

  • 🛠Floor 39

  • 🛠Floor 40

  • 🛠Floor 41

  • 🛠Floor 42

  • 🛠Floor 43

  • 🛠Floor 44 Machanical

  • 🛠Floor 45 Roof top #1

  • 🛠Floor 46 Roof top #2

  • Disclaimer The assessors believe the information contained within this risk assessment report to be correct at the time of printing. The assessors do not accept responsibility for any consequences arising from the use of the information herein. The report is based on matters which were observed or came to the attention of the assessors during the day of the assessment and should not be relied upon as an exhaustive record of all possible risks or hazards that may exist or potential improvements that can be made.

🚨B.M.S Alarms

  • B.M.S Alarms

    IMG_2058.jpeg.jpg
  • Monday. B.M.S 🚨Alarm._____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

  • Tuesday. B.M.S 🚨Alarm._____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

  • Wednesday. B.M.S 🚨Alarm._____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

  • Thursday. B.M.S 🚨Alarm._____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

  • Friday. B.M.S 🚨Alarm._____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

  • Disclaimer The assessors believe the information contained within this risk assessment report to be correct at the time of printing. The assessors do not accept responsibility for any consequences arising from the use of the information herein. The report is based on matters which were observed or came to the attention of the assessors during the day of the assessment and should not be relied upon as an exhaustive record of all possible risks or hazards that may exist or potential improvements that can be made.

PRV Floor Stations

Floor 8

  • Monday. PRV 1️⃣__________psi. PRV 2️⃣__________psi. PRV 3️⃣ - 4️⃣ __________psi.

  • Tuesday. PRV PRV 1️⃣__________psi. PRV 2️⃣__________psi. PRV 3️⃣ - 4️⃣ __________psi.

  • Wednesday. PRV 1️⃣__________psi. PRV 2️⃣__________psi. PRV 3️⃣ - 4️⃣ __________psi.

  • Thursday. PRV 1️⃣__________psi. PRV 2️⃣__________psi. PRV 3️⃣ - 4️⃣ __________psi.

  • Friday. PRV PRV 1️⃣__________psi. PRV 2️⃣__________psi. PRV 3️⃣ - 4️⃣ __________psi.

Floor 9

  • Monday. PRV 1️⃣__________psi. PRV 2__________psi. PRV 3️⃣ - 4️⃣__________psi. Pump 9_1__________psi. ET 9_1__________psi. HX 9_1__________psi.

  • Tuesday. PRV 1️⃣__________psi. PRV 2️⃣__________psi. PRV 3️⃣ - 4️⃣__________psi. Pump 9_1__________psi. ET 9_1__________psi. HX 9_1__________psi.

  • Wednesday. PRV 1️⃣__________psi. PRV 2️⃣__________psi. PRV 3️⃣ - 4️⃣__________psi. Pump 9_1__________psi. ET 9_1__________psi. HX 9_1__________psi.

  • Thursday. PRV 1️⃣__________psi. PRV 2️⃣__________psi. PRV 3️⃣ - 4️⃣__________psi. Pump 9_1__________psi. ET 9_1__________psi. HX 9_1__________psi.

  • Friday. PRV 1️⃣__________psi. PRV 2️⃣__________psi. PRV 3️⃣ - 4️⃣__________psi. Pump 9_1__________psi. ET 9_1__________psi. HX 9_1__________psi.

Floor 16

  • Monday. PRV 1️⃣__________psi. PRV 2️⃣__________psi. PRV 3️⃣ - 4️⃣__________psi. Pump 17_1__________psi. ET 17_1__________psi. HX 17_1__________psi.

  • Tuesday. PRV 1️⃣__________psi. PRV 2️⃣__________psi. PRV 3️⃣ - 4️⃣__________psi. Pump 17_1__________psi. ET 17_1__________psi. HX 17_1__________psi.

  • Wednesday. PRV 1️⃣__________psi. PRV 2️⃣__________psi. PRV 3️⃣ - 4️⃣__________psi. Pump 17_1__________psi. ET 17_1__________psi. HX 17_1__________psi.

  • Thursday. PRV 1️⃣__________psi. PRV 2️⃣__________psi. PRV 3️⃣ - 4️⃣__________psi. Pump 17_1__________psi. ET 17_1__________psi. HX 17_1__________psi.

  • Friday. PRV 1️⃣__________psi. PRV 2️⃣__________psi. PRV 3️⃣ - 4️⃣__________psi. Pump 17_1__________psi. ET 17_1__________psi. HX 17_1__________psi.

Floor 19 Mop-sink

  • _____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Floor 22

  • Monday. PRV 1️⃣__________psi. PRV 2️⃣__________psi. PRV 3️⃣ - 4️⃣__________psi. Pump 23_1__________psi. ET 23_1__________psi. HX 23_1__________psi.

  • Tuesday. PRV 1️⃣__________psi. PRV 2️⃣__________psi. PRV 3️⃣ - 4️⃣__________psi. Pump 17_1__________psi. ET 17_1__________psi. HX 17_1__________psi.

  • Wednesday. PRV 1️⃣__________psi. PRV 2️⃣__________psi. PRV 3️⃣ - 4️⃣__________psi. Pump 17_1__________psi. ET 17_1__________psi. HX 17_1__________psi.

  • Thursday. PRV 1️⃣__________psi. PRV 2️⃣__________psi. PRV 3️⃣ - 4️⃣__________psi. Pump 17_1__________psi. ET 17_1__________psi. HX 17_1__________psi.

  • Friday. PRV 1️⃣__________psi. PRV 2️⃣__________psi. PRV 3️⃣ - 4️⃣__________psi. Pump 17_1__________psi. ET 17_1__________psi. HX 17_1__________psi.

Disclaimer

  • Disclaimer The assessors believe the information contained within this risk assessment report to be correct at the time of printing. The assessors do not accept responsibility for any consequences arising from the use of the information herein. The report is based on matters which were observed or came to the attention of the assessors during the day of the assessment and should not be relied upon as an exhaustive record of all possible risks or hazards that may exist or potential improvements that can be made.

Boiler 1-⚠️(Hydronic System) Primary Heating System. Water Meter. 00153211

  • Hydronic System. Lockinvar 5309

    IMG_1803.jpeg.jpg

Lockinvar Boiler 1️⃣.

  • Monday. Boiler 1️⃣. Outdoor Air🌦__________℃. System Supply⤵️__________℃. System Return⤴️__________℃. Inlet Water➡️__________. Delta T__________. Outlet Water➡️__________. Flue🌡___________. Flame🔥__________. Status. ON - Stand-by - OFF. Primary pump. Inlet➡️__________psi. Outlet➡️__________psi.

  • Tuesday. Boiler 1️⃣. Outdoor Air🌦__________℃. System Supply⤵️__________℃. System Return⤴️__________℃. Inlet Water➡️__________. Delta T__________. Outlet Water➡️__________. Flue🌡___________. Flame🔥__________. Status. ON - Stand-by - OFF. Primary pump. Inlet➡️__________psi. Outlet➡️__________psi

  • Wednesday. Boiler 1️⃣. Outdoor Air🌦__________℃. System Supply⤵️__________℃. System Return⤴️__________℃. Inlet Water➡️__________. Delta T__________. Outlet Water➡️__________. Flue🌡___________. Flame🔥__________. Status. ON - Stand-by - OFF. Primary pump. Inlet➡️__________psi. Outlet➡️__________psi

  • Thursday. Boiler 1️⃣. Outdoor Air🌦__________℃. System Supply⤵️__________℃. System Return⤴️__________℃. Inlet Water➡️__________. Delta T__________. Outlet Water➡️__________. Flue🌡___________. Flame🔥__________. Status. ON - Stand-by - OFF. Primary pump. Inlet➡️__________psi. Outlet➡️__________psi

  • Friday. Boiler 1️⃣. Outdoor Air🌦__________℃. System Supply⤵️__________℃. System Return⤴️__________℃. Inlet Water➡️__________. Delta T__________. Outlet Water➡️__________. Flue🌡___________. Flame🔥__________. Status. ON - Stand-by - OFF. Primary pump. Inlet➡️__________psi. Outlet➡️__________psi.

Pumps

  • Monday. P-45-HWP 1️⃣ - 2️⃣. Supply⤵️__________PSI. Return⤴️__________PSI. Flow➡️__________GPM. Speed🔄__________RPM. Power__________kw. Voltage__________V. Current__________A.

  • Tuesday. P-45-HWP 1️⃣ - 2️⃣. Supply⤵️__________PSI. Return⤴️__________PSI. Flow➡️__________GPM. Speed🔄__________RPM. Power__________kw. Voltage__________V. Current__________A.

  • Wednesday. P-45-HWP 1️⃣ - 2️⃣. Supply⤵️__________PSI. Return⤴️__________PSI. Flow➡️__________GPM. Speed🔄__________RPM. Power__________kw. Voltage__________V. Current__________A.

  • Thursday. P-45-HWP 1️⃣ - 2️⃣. Supply⤵️__________PSI. Return⤴️__________PSI. Flow➡️__________GPM. Speed🔄__________RPM. Power__________kw. Voltage__________V. Current__________A.

  • Friday. P-45-HWP 1️⃣ - 2️⃣. Supply⤵️__________PSI. Return⤴️__________PSI. Flow➡️__________GPM. Speed🔄__________RPM. Power__________kw. Voltage__________V. Current__________A.

Disclaimer

  • Disclaimer The assessors believe the information contained within this risk assessment report to be correct at the time of printing. The assessors do not accept responsibility for any consequences arising from the use of the information herein. The report is based on matters which were observed or came to the attention of the assessors during the day of the assessment and should not be relied upon as an exhaustive record of all possible risks or hazards that may exist or potential improvements that can be made.

Boiler 2-⚠️(Hydronic System) Primary Heating System. Water Meter. 00153211

Lockinvar Boiler 2️⃣.

  • Monday. Boiler 2️⃣. Outdoor Air🌦__________℃. System Supply⤵️__________℃. System Return⤴️__________℃. Inlet Water➡️__________. Delta T__________. Outlet Water➡️__________. Flue🌡___________. Flame🔥__________. Status. ON - Stand-by - OFF. Primary pump. Inlet➡️__________psi. Outlet➡️__________psi.

  • Tuesday. Boiler 2️⃣. Outdoor Air🌦__________℃. System Supply⤵️__________℃. System Return⤴️__________℃. Inlet Water➡️__________. Delta T__________. Outlet Water➡️__________. Flue🌡___________. Flame🔥__________. Status. ON - Stand-by - OFF. Primary pump. Inlet➡️__________psi. Outlet➡️__________psi

  • Wednesday. Boiler 2️⃣. Outdoor Air🌦__________℃. System Supply⤵️__________℃. System Return⤴️__________℃. Inlet Water➡️__________. Delta T__________. Outlet Water➡️__________. Flue🌡___________. Flame🔥__________. Status. ON - Stand-by - OFF. Primary pump. Inlet➡️__________psi. Outlet➡️__________psi

  • Thursday. Boiler 2️⃣. Outdoor Air🌦__________℃. System Supply⤵️__________℃. System Return⤴️__________℃. Inlet Water➡️__________. Delta T__________. Outlet Water➡️__________. Flue🌡___________. Flame🔥__________. Status. ON - Stand-by - OFF. Primary pump. Inlet➡️__________psi. Outlet➡️__________psi

  • Friday. Boiler 2️⃣. Outdoor Air🌦__________℃. System Supply⤵️__________℃. System Return⤴️__________℃. Inlet Water➡️__________. Delta T__________. Outlet Water➡️__________. Flue🌡___________. Flame🔥__________. Status. ON - Stand-by - OFF. Primary pump. Inlet➡️__________psi. Outlet➡️__________psi.

Disclaimer

  • Disclaimer The assessors believe the information contained within this risk assessment report to be correct at the time of printing. The assessors do not accept responsibility for any consequences arising from the use of the information herein. The report is based on matters which were observed or came to the attention of the assessors during the day of the assessment and should not be relied upon as an exhaustive record of all possible risks or hazards that may exist or potential improvements that can be made.

Boiler 3-⚠️(Hydronic System) Primary Heating System. Water Meter. 00153211

Lockinvar Boiler 3️⃣.

  • Monday. Boiler 3️⃣. Outdoor Air🌦__________℃. System Supply⤵️__________℃. System Return⤴️__________℃. Inlet Water➡️__________. Delta T__________. Outlet Water➡️__________. Flue🌡___________. Flame🔥__________. Status. ON - Stand-by - OFF. Primary pump. Inlet➡️__________psi. Outlet➡️__________psi.

  • Tuesday. Boiler 3️⃣. Outdoor Air🌦__________℃. System Supply⤵️__________℃. System Return⤴️__________℃. Inlet Water➡️__________. Delta T__________. Outlet Water➡️__________. Flue🌡___________. Flame🔥__________. Status. ON - Stand-by - OFF. Primary pump. Inlet➡️__________psi. Outlet➡️__________psi

  • Wednesday. Boiler 3️⃣. Outdoor Air🌦__________℃. System Supply⤵️__________℃. System Return⤴️__________℃. Inlet Water➡️__________. Delta T__________. Outlet Water➡️__________. Flue🌡___________. Flame🔥__________. Status. ON - Stand-by - OFF. Primary pump. Inlet➡️__________psi. Outlet➡️__________psi

  • Thursday. Boiler 3️⃣. Outdoor Air🌦__________℃. System Supply⤵️__________℃. System Return⤴️__________℃. Inlet Water➡️__________. Delta T__________. Outlet Water➡️__________. Flue🌡___________. Flame🔥__________. Status. ON - Stand-by - OFF. Primary pump. Inlet➡️__________psi. Outlet➡️__________psi

  • Friday. Boiler 3️⃣. Outdoor Air🌦__________℃. System Supply⤵️__________℃. System Return⤴️__________℃. Inlet Water➡️__________. Delta T__________. Outlet Water➡️__________. Flue🌡___________. Flame🔥__________. Status. ON - Stand-by - OFF. Primary pump. Inlet➡️__________psi. Outlet➡️__________psi.

Disclaimer

  • Disclaimer The assessors believe the information contained within this risk assessment report to be correct at the time of printing. The assessors do not accept responsibility for any consequences arising from the use of the information herein. The report is based on matters which were observed or came to the attention of the assessors during the day of the assessment and should not be relied upon as an exhaustive record of all possible risks or hazards that may exist or potential improvements that can be made.

2-⚠️(Hydronic System) Secondary Glycol Heating System

  • Hydronic System

    IMG_1804.jpeg.jpg

Monday (Hydronic System) Secondary Glycol Hearting System

  • Monday. P2 HWP 1️⃣ - 2️⃣. Supply⤵️__________PSI. Return⤴️__________PSI. Flow➡️__________GPM. Speed🔄__________RPM. Power__________kw. Voltage__________V. Current__________A. ON - Stand-by

  • Monday. P2 HWP 3️⃣ - 4️⃣. Supply⤵️__________PSI. Return⤴️__________PSI. Flow➡️__________GPM. Speed🔄__________RPM. Power__________kw. Voltage__________V. Current__________A. ON - Stand-by

  • Monday. P2 HWP 5️⃣ - 6️⃣. Supply⤵️__________PSI. Return⤴️__________PSI. Flow➡️__________GPM. Speed🔄__________RPM. Power__________kw. Voltage__________V. Current__________A. ON - Stand-by

Tuesday (Hydronic System) Secondary Glycol Heating System

  • Tuesday. P2 HWP 1️⃣ - 2️⃣. Supply⤵️__________PSI. Return⤴️__________PSI. Flow➡️__________GPM. Speed🔄__________RPM. Power__________kw. Voltage__________V. Current__________A. ON - Stand-by

  • Tuesday. P2 HWP 3️⃣ - 4️⃣. Supply⤵️__________PSI. Return⤴️__________PSI. Flow➡️__________GPM. Speed🔄__________RPM. Power__________kw. Voltage__________V. Current__________A. ON - Stand-by

  • Tuesday. P2 HWP 5️⃣ - 6️⃣. Supply⤵️__________PSI. Return⤴️__________PSI. Flow➡️__________GPM. Speed🔄__________RPM. Power__________kw. Voltage__________V. Current__________A. ON - Stand-by

Wednesday (Hydronic System) Secondary Glycol Heating System

  • Wednesday. P2 HWP 1️⃣ - 2️⃣. Supply⤵️__________PSI. Return⤴️__________PSI. Flow➡️__________GPM. Speed🔄__________RPM. Power__________kw. Voltage__________V. Current__________A. ON - Stand-by

  • Wednesday. P2 HWP 3️⃣ - 4️⃣. Supply⤵️__________PSI. Return⤴️__________PSI. Flow➡️__________GPM. Speed🔄__________RPM. Power__________kw. Voltage__________V. Current__________A. ON - Stand-by

  • Wednesday. P2 HWP 5️⃣ - 6️⃣. Supply⤵️__________PSI. Return⤴️__________PSI. Flow➡️__________GPM. Speed🔄__________RPM. Power__________kw. Voltage__________V. Current__________A. ON - Stand-by

Thursday (Hydronic System) Secondary Glycol Heating System

  • Thursday. P2 HWP 1️⃣ - 2️⃣. Supply⤵️__________PSI. Return⤴️__________PSI. Flow➡️__________GPM. Speed🔄__________RPM. Power__________kw. Voltage__________V. Current__________A. ON - Stand-by

  • Thursday. P2 HWP 3️⃣ - 4️⃣. Supply⤵️__________PSI. Return⤴️__________PSI. Flow➡️__________GPM. Speed🔄__________RPM. Power__________kw. Voltage__________V. Current__________A. ON - Stand-by

  • Thursday. P2 HWP 5️⃣ - 6️⃣. Supply⤵️__________PSI. Return⤴️__________PSI. Flow➡️__________GPM. Speed🔄__________RPM. Power__________kw. Voltage__________V. Current__________A. ON - Stand-by

Friday (Hydronic System) Secondary Glycol Heating System

  • Friday. P2 HWP 1️⃣ - 2️⃣. Supply⤵️__________PSI. Return⤴️__________PSI. Flow➡️__________GPM. Speed🔄__________RPM. Power__________kw. Voltage__________V. Current__________A. ON - Stand-by

  • Friday. P2 HWP 3️⃣ - 4️⃣. Supply⤵️__________PSI. Return⤴️__________PSI. Flow➡️__________GPM. Speed🔄__________RPM. Power__________kw. Voltage__________V. Current__________A. ON - Stand-by

  • Friday. P2 HWP 5️⃣ - 6️⃣. Supply⤵️__________PSI. Return⤴️__________PSI. Flow➡️__________GPM. Speed🔄__________RPM. Power__________kw. Voltage__________V. Current__________A. ON - Stand-by

Disclaimer

  • Disclaimer The assessors believe the information contained within this risk assessment report to be correct at the time of printing. The assessors do not accept responsibility for any consequences arising from the use of the information herein. The report is based on matters which were observed or came to the attention of the assessors during the day of the assessment and should not be relied upon as an exhaustive record of all possible risks or hazards that may exist or potential improvements that can be made.

3-⚠️(Hydronic System) Heat Pump System

  • Hydronic System Heat Pump System

    IMG_1805.jpeg.jpg
  • Heat pump system

    IMG_2902.jpeg.jpg

Monday (Hydronic System) Heat Pump System

  • Monday. HP 1️⃣ - 2️⃣. Supply⤵️__________PSI. Return⤴️__________PSI. Flow➡️__________GPM. Speed🔄__________RPM. Power__________kw. Voltage__________V. Current__________A. ON - Stand-by

  • Monday. A/C 1️⃣ - 2️⃣. Supply⤵️__________PSI. Return⤴️__________PSI. Flow➡️__________GPM. Speed🔄__________RPM. Power__________kw. Voltage__________V. Current__________A. ON - Stand-by

Tuesday (Hydronic System) Heat Pump System

  • Tuesday. HP 1️⃣ - 2️⃣. Supply⤵️__________PSI. Return⤴️__________PSI. Flow➡️__________GPM. Speed🔄__________RPM. Power__________kw. Voltage__________V. Current__________A. ON - Stand-by

  • Tuesday. A/C 1️⃣ - 2️⃣. Supply⤵️__________PSI. Return⤴️__________PSI. Flow➡️__________GPM. Speed🔄__________RPM. Power__________kw. Voltage__________V. Current__________A. ON - Stand-by

Wednesday (Hydronic System) Heat Pump System

  • Wednesday. HP 1️⃣ - 2️⃣. Supply⤵️__________PSI. Return⤴️__________PSI. Flow➡️__________GPM. Speed🔄__________RPM. Power__________kw. Voltage__________V. Current__________A. ON - Stand-by

  • Wednesday. A/C 1️⃣ - 2️⃣. Supply⤵️__________PSI. Return⤴️__________PSI. Flow➡️__________GPM. Speed🔄__________RPM. Power__________kw. Voltage__________V. Current__________A. ON - Stand-by

Thursday (Hydronic System) Heat Pump System

  • Thursday. HP 1️⃣ - 2️⃣. Supply⤵️__________PSI. Return⤴️__________PSI. Flow➡️__________GPM. Speed🔄__________RPM. Power__________kw. Voltage__________V. Current__________A. ON - Stand-by

  • Thursday A/C 1️⃣ - 2️⃣. Supply⤵️__________PSI. Return⤴️__________PSI. Flow➡️__________GPM. Speed🔄__________RPM. Power__________kw. Voltage__________V. Current__________A. ON - Stand-by

Friday (Hydronic System) Heat Pump System

  • Friday. HP 1️⃣ - 2️⃣. Supply⤵️__________PSI. Return⤴️__________PSI. Flow➡️__________GPM. Speed🔄__________RPM. Power__________kw. Voltage__________V. Current__________A. ON - Stand-by

  • Friday. A/C 1️⃣ - 2️⃣. Supply⤵️__________PSI. Return⤴️__________PSI. Flow➡️__________GPM. Speed🔄__________RPM. Power__________kw. Voltage__________V. Current__________A. ON - Stand-by

Disclaimer

  • Disclaimer The assessors believe the information contained within this risk assessment report to be correct at the time of printing. The assessors do not accept responsibility for any consequences arising from the use of the information herein. The report is based on matters which were observed or came to the attention of the assessors during the day of the assessment and should not be relied upon as an exhaustive record of all possible risks or hazards that may exist or potential improvements that can be made.

4-⚠️(Hydronic System) Domestic Hot Water System

  • Hydronic System Domestic Hot Water System b

    IMG_1806.jpeg.jpg

Monday

  • DWT 1️⃣. __________℃. 🔛 - S/B. DWT 2️⃣. __________℃. 🔛 - S/B. DWT 3️⃣. __________℃. ON - S/B. DWT 4️⃣. __________℃ 🔛 - S/B. DWT 5️⃣. __________℃ 🔛 - S/B. Supply⤵️__________℃. Return⤴️__________℃. DHWST🌡__________℃

  • P-45-HWP 1️⃣ - 2️⃣. Supply⤵️__________PSI. Return⤴️__________PSI. Flow➡️__________GPM. Speed🔄__________RPM. Power__________kw. Voltage__________V. Current__________A.

Tuesday

  • DWT 1️⃣. __________℃. 🔛 - S/B. DWT 2️⃣. __________℃. 🔛 - S/B. DWT 3️⃣. __________℃. ON - S/B. DWT 4️⃣. __________℃ 🔛 - S/B. DWT 5️⃣. __________℃ 🔛 - S/B. Supply⤵️__________℃. Return⤴️__________℃. DHWST🌡__________℃

  • P-45-HWP 1️⃣ - 2️⃣. Supply⤵️__________PSI. Return⤴️__________PSI. Flow➡️__________GPM. Speed🔄__________RPM. Power__________kw. Voltage__________V. Current__________A.

Wednesday

  • DWT 1️⃣. __________℃. 🔛 - S/B. DWT 2️⃣. __________℃. 🔛 - S/B. DWT 3️⃣. __________℃. ON - S/B. DWT 4️⃣. __________℃ 🔛 - S/B. DWT 5️⃣. __________℃ 🔛 - S/B. Supply⤵️__________℃. Return⤴️__________℃. DHWST🌡__________℃

  • P-45-HWP 1️⃣ - 2️⃣. Supply⤵️__________PSI. Return⤴️__________PSI. Flow➡️__________GPM. Speed🔄__________RPM. Power__________kw. Voltage__________V. Current__________A.

Thursday

  • DWT 1️⃣. __________℃. 🔛 - S/B. DWT 2️⃣. __________℃. 🔛 - S/B. DWT 3️⃣. __________℃. ON - S/B. DWT 4️⃣. __________℃ 🔛 - S/B. DWT 5️⃣. __________℃ 🔛 - S/B. Supply⤵️__________℃. Return⤴️__________℃. DHWST🌡__________℃

  • P-45-HWP 1️⃣ - 2️⃣. Supply⤵️__________PSI. Return⤴️__________PSI. Flow➡️__________GPM. Speed🔄__________RPM. Power__________kw. Voltage__________V. Current__________A.

Friday

  • DWT 1️⃣. __________℃. 🔛 - S/B. DWT 2️⃣. __________℃. 🔛 - S/B. DWT 3️⃣. __________℃. ON - S/B. DWT 4️⃣. __________℃ 🔛 - S/B. DWT 5️⃣. __________℃ 🔛 - S/B. Supply⤵️__________℃. Return⤴️__________℃. DHWST🌡__________℃

  • P-45-HWP 1️⃣ - 2️⃣. Supply⤵️__________PSI. Return⤴️__________PSI. Flow➡️__________GPM. Speed🔄__________RPM. Power__________kw. Voltage__________V. Current__________A.

Disclaimer

  • Disclaimer The assessors believe the information contained within this risk assessment report to be correct at the time of printing. The assessors do not accept responsibility for any consequences arising from the use of the information herein. The report is based on matters which were observed or came to the attention of the assessors during the day of the assessment and should not be relied upon as an exhaustive record of all possible risks or hazards that may exist or potential improvements that can be made.

5-⚠️Booster - Jockey pump. Tornatech controller.

  • Hydronic System

    IMG_1808.jpeg.jpg
  • Monday. Tornatech controller__________psi. Jockey pump controller__________psi. Main riser⤴️__________psi.

  • Tuesday. Tornatech controller__________psi. Jockey pump controller__________psi. Main riser⤴️__________psi.

  • Wednesday. Tornatech controller__________psi. Jockey pump controller__________psi. Main riser⤴️__________psi.

  • Thursday. Tornatech controller__________psi. Jockey pump controller__________psi. Main riser⤴️__________psi.

  • Friday. Tornatech controller__________psi. Jockey pump controller__________psi. Main riser⤴️__________psi.

Disclaimer

  • Disclaimer The assessors believe the information contained within this risk assessment report to be correct at the time of printing. The assessors do not accept responsibility for any consequences arising from the use of the information herein. The report is based on matters which were observed or came to the attention of the assessors during the day of the assessment and should not be relied upon as an exhaustive record of all possible risks or hazards that may exist or potential improvements that can be made.

6-⚠️(Hydronic System) Adiabatic Chiller / Heat Pumps

  • Hydronic System

    IMG_2039.jpeg.jpg
  • Monday. Chiller VI

  • Tuesday. Chiller VI

  • Wednesday. Chiller VI

  • Thursday. Chiller VI

  • Friday. Chiller VI

Disclaimer

  • Disclaimer The assessors believe the information contained within this risk assessment report to be correct at the time of printing. The assessors do not accept responsibility for any consequences arising from the use of the information herein. The report is based on matters which were observed or came to the attention of the assessors during the day of the assessment and should not be relied upon as an exhaustive record of all possible risks or hazards that may exist or potential improvements that can be made.

7-(Hydronic System) HX_44 Hallway MUA

  • Hydronic System

    IMG_1807.jpeg.jpg
  • Monday. MUA Glycol pump 1️⃣ - 2️⃣. Supply⤵️__________PSI. Return⤴️__________PSI. Flow➡️__________GPM. Speed🔄__________RPM. Power__________kw. Voltage__________V. Current__________A. ON - Stand-by

  • Tuesday. MUA Glycol pump 1️⃣ - 2️⃣. Supply⤵️__________PSI. Return⤴️__________PSI. Flow➡️__________GPM. Speed🔄__________RPM. Power__________kw. Voltage__________V. Current__________A. ON - Stand-by

  • Wednesday. MUA Glycol pump 1️⃣ - 2️⃣. Supply⤵️__________PSI. Return⤴️__________PSI. Flow➡️__________GPM. Speed🔄__________RPM. Power__________kw. Voltage__________V. Current__________A. ON - Stand-by

  • Thursday. MUA Glycol pump 1️⃣ - 2️⃣. Supply⤵️__________PSI. Return⤴️__________PSI. Flow➡️__________GPM. Speed🔄__________RPM. Power__________kw. Voltage__________V. Current__________A. ON - Stand-by

  • Friday. MUA Glycol pump 1️⃣ - 2️⃣. Supply⤵️__________PSI. Return⤴️__________PSI. Flow➡️__________GPM. Speed🔄__________RPM. Power__________kw. Voltage__________V. Current__________A. ON - Stand-by

Disclaimer

  • Disclaimer The assessors believe the information contained within this risk assessment report to be correct at the time of printing. The assessors do not accept responsibility for any consequences arising from the use of the information herein. The report is based on matters which were observed or came to the attention of the assessors during the day of the assessment and should not be relied upon as an exhaustive record of all possible risks or hazards that may exist or potential improvements that can be made.

1-(Stairwell Pressurization) Overview

  • Stairwell Pressurization Overview

    IMG_2071.png
  • Monday.

  • Tuesday.

  • Wednesday.

  • Thursday.

  • Friday.

Disclaimer

  • Disclaimer The assessors believe the information contained within this risk assessment report to be correct at the time of printing. The assessors do not accept responsibility for any consequences arising from the use of the information herein. The report is based on matters which were observed or came to the attention of the assessors during the day of the assessment and should not be relied upon as an exhaustive record of all possible risks or hazards that may exist or potential improvements that can be made.

2-(Stairwell Pressurization) Stair 1 MUA-P1-1

  • MUA P1_1

    IMG_2693.jpeg.jpg
  • Stairwell Pressurization

    IMG_2036.jpeg.jpg
  • Monday. MUA P1_1. Fan status. ON - OFF. Supply air temp_______________℃

  • Tuesday. MUA P1_1. Fan status. ON - OFF. Supply air temp_______________℃

  • Wednesday. MUA P1_1. Fan status. ON - OFF. Supply air temp_______________℃

  • Thursday. MUA P1_1. Fan status. ON - OFF. Supply air temp_______________℃

  • Friday. MUA P1_1. Fan status. ON- OFF. Supply air temp_______________℃

Disclaimer

  • Disclaimer The assessors believe the information contained within this risk assessment report to be correct at the time of printing. The assessors do not accept responsibility for any consequences arising from the use of the information herein. The report is based on matters which were observed or came to the attention of the assessors during the day of the assessment and should not be relied upon as an exhaustive record of all possible risks or hazards that may exist or potential improvements that can be made.

3-(Stairwell Pressurization) Stair 1 MUA P1_2

  • MUA P1_2

    IMG_2693.jpeg.jpg
  • Stairwell Pressurization

    IMG_2037.jpeg.jpg
  • Monday. MUA P1_2. Fan status. ON - OFF. Supply air temp_______________℃

  • Tuesday. MUA P1_2. Fan status. ON - OFF. Supply air temp_______________℃

  • Wednesday. MUA P1_2. Fan status. ON - OFF. Supply air temp_______________℃

  • Thursday. MUA P1_2. Fan status. ON - OFF. Supply air temp_______________℃

  • Friday. MUA P1_2. Fan status. ON - OFF. Supply air temp_______________℃

Disclaimer

  • Disclaimer The assessors believe the information contained within this risk assessment report to be correct at the time of printing. The assessors do not accept responsibility for any consequences arising from the use of the information herein. The report is based on matters which were observed or came to the attention of the assessors during the day of the assessment and should not be relied upon as an exhaustive record of all possible risks or hazards that may exist or potential improvements that can be made.

4-(Stairwell Pressurization) Stair 1 MUA P1_3

  • MUA P1_3

    IMG_2694.jpeg.jpg
  • Stairwell Pressurization t5 xx. bbvbbbbbvbvv

    IMG_2040.jpeg.jpg
  • Monday. MUA P1_3. Fan status. ON - OFF. Supply air temp_______________℃

  • Tuesday. MUA P1_3. Fan status. ON - OFF. Supply air temp_______________℃

  • Wednesday. MUA P1_3. Fan status. ON - OFF. Supply air temp_______________℃

  • Thursday. MUA P1_3. Fan status. ON - OFF. Supply air temp_______________℃

  • Friday. MUA P1_3. Fan status. ON - OFF. Supply air temp_______________℃

  • Disclaimer The assessors believe the information contained within this risk assessment report to be correct at the time of printing. The assessors do not accept responsibility for any consequences arising from the use of the information herein. The report is based on matters which were observed or came to the attention of the assessors during the day of the assessment and should not be relied upon as an exhaustive record of all possible risks or hazards that may exist or potential improvements that can be made.

Disclaimer

5-(Stairwell Pressurizations) SF1/HC1

  • Stairwell Pressurization

    IMG_2041.jpeg.jpg
  • Monday. SF1/HC1. Fan status. ON - OFF. Supply air temp_______________℃

  • Tuesday. SF1/HC1. Fan status. ON - OFF. Supply air temp_______________℃

  • Wednesday. SF1/HC1. Fan status. ON - OFF. Supply air temp_______________℃

  • Thursday. SF1/HC1. Fan status. ON - OFF Supply air temp_______________℃

  • Friday. SF1/HC1. Fan status. ON - OFF. Supply air temp_______________℃

Disclaimer

  • Disclaimer The assessors believe the information contained within this risk assessment report to be correct at the time of printing. The assessors do not accept responsibility for any consequences arising from the use of the information herein. The report is based on matters which were observed or came to the attention of the assessors during the day of the assessment and should not be relied upon as an exhaustive record of all possible risks or hazards that may exist or potential improvements that can be made.

6-(Stairwell Pressurizations) SF2/HC2

  • Stairwell Pressurization

    IMG_2042.jpeg.jpg
  • Monday. SF2/HC2. Fan status. ON - OFF. Supply air temp_______________℃

  • Tuesday. SF2/HC2. Fan status. ON - OFF. Supply air temp_______________℃

  • Wednesday. SF2/HC2. Fan status. ON - OFF. Supply air temp_______________℃

  • Thursday. SF2/HC2. Fan status. ON - OFF. Supply air temp_______________℃

  • Friday. SF2/HC2. Fan status. ON - OFF. Supply air temp_______________℃

Disclaimer

  • Disclaimer The assessors believe the information contained within this risk assessment report to be correct at the time of printing. The assessors do not accept responsibility for any consequences arising from the use of the information herein. The report is based on matters which were observed or came to the attention of the assessors during the day of the assessment and should not be relied upon as an exhaustive record of all possible risks or hazards that may exist or potential improvements that can be made.

7-(Stairwell Pressurization) Stair 3 MUA 4_1

  • MUA 4_1

    IMG_2820.jpeg.jpg
  • Stairwell Pressurization

    IMG_2043.jpeg.jpg
  • Monday. MUA 4_1. Fan status. ON - OFF. Supply air temp_______________℃

  • Tuesday. MUA 4_1. Fan status. ON - OFF. Supply air temp_______________℃

  • Wednesday. MUA 4_1. Fan status. ON - OFF. Supply air temp_______________℃

  • Thursday. MUA 4_1. Fan status. ON - OFF. Supply air temp_______________℃

  • Friday. MUA 4_1. Fan status. ON - OFF. Supply air temp_______________℃

Disclaimer

  • Disclaimer The assessors believe the information contained within this risk assessment report to be correct at the time of printing. The assessors do not accept responsibility for any consequences arising from the use of the information herein. The report is based on matters which were observed or came to the attention of the assessors during the day of the assessment and should not be relied upon as an exhaustive record of all possible risks or hazards that may exist or potential improvements that can be made.

8-(Stairwell Pressurization) Stair 3 MUA 4_2

  • MUA 4_2

    IMG_2822.jpeg.jpg
  • Stairwell Pressurization

    IMG_2044.jpeg.jpg
  • Monday. MUA 4_2. Fan status. ON - OFF. Supply air temp_______________℃

  • Tuesday. MUA 4_2. Fan status. ON - OFF. Supply air temp_______________℃

  • Wednesday. MUA 4_2. Fan status. ON - OFF. Supply air temp_______________℃

  • Thursday. MUA 4_2. Fan status. ON - OFF. Supply air temp_______________℃

  • Friday. MUA 4_2. Fan status. ON - OFF. Supply air temp_______________℃

Disclaimer

  • Disclaimer The assessors believe the information contained within this risk assessment report to be correct at the time of printing. The assessors do not accept responsibility for any consequences arising from the use of the information herein. The report is based on matters which were observed or came to the attention of the assessors during the day of the assessment and should not be relied upon as an exhaustive record of all possible risks or hazards that may exist or potential improvements that can be made.

9-(Stairwell Pressurization) Stair 1 MUA 46_1

  • MUA 46_1 & 2

    IMG_2776.jpeg.jpg
  • Stairwell Pressurization

    IMG_2045.jpeg.jpg
  • Monday. MUA 45_1. Fan status. ON - OFF. Supply air temp_______________℃

  • Tuesday. MUA 45_1. Fan status. ON - OFF. Supply air temp_______________℃

  • Wednesday. MUA 45_1. Fan status. ON - OFF. Supply air temp_______________℃

  • Thursday. MUA 45_1. Fan status. ON - OFF. Supply air temp_______________℃

  • Friday. MUA 45_1. Fan status. ON - OFF. Supply air temp_______________℃

Disclaimer

  • Disclaimer The assessors believe the information contained within this risk assessment report to be correct at the time of printing. The assessors do not accept responsibility for any consequences arising from the use of the information herein. The report is based on matters which were observed or came to the attention of the assessors during the day of the assessment and should not be relied upon as an exhaustive record of all possible risks or hazards that may exist or potential improvements that can be made.

10-(Stairwell Pressurization) Stair 1 MUA 46_2

  • MUA 46_1 & 2

    IMG_2776.jpeg.jpg
  • Stairwell Pressurization

    IMG_2046.jpeg.jpg
  • Monday. MUA 45_2. Fan status. ON - OFF. Supply air temp_______________℃

  • Tuesday. MUA 45_2. Fan status. ON - OFF. Supply air temp_______________℃

  • Wednesday. MUA_2. Fan status. ON - OFF. Supply air temp_______________℃

  • Thursday. MUA 45_2. Fan status. ON - OFF. Supply air temp_______________℃

  • Friday. MUA 45_2. Fan status. ON - OFF. Supply air temp_______________℃

Disclaimer

  • Disclaimer The assessors believe the information contained within this risk assessment report to be correct at the time of printing. The assessors do not accept responsibility for any consequences arising from the use of the information herein. The report is based on matters which were observed or came to the attention of the assessors during the day of the assessment and should not be relied upon as an exhaustive record of all possible risks or hazards that may exist or potential improvements that can be made.

1-(Ventilation) Enmax Vault

  • Ventilation

    IMG_2695.jpeg.jpg
  • Monday. Emmax. Status. ON - OFF. Speed_______________⁒

  • Tuesday. Enmax. Status. ON - OFF. Speed_______________⁒

  • Wednesday. Enmax. Status. ON - OFF. Speed_______________⁒

  • Thursday. Enmax. Status. ON - OFF. Speed_______________⁒

  • Friday. Enmax. Status. ON - OFF. Speed_______________⁒

Disclaimer

  • Disclaimer The assessors believe the information contained within this risk assessment report to be correct at the time of printing. The assessors do not accept responsibility for any consequences arising from the use of the information herein. The report is based on matters which were observed or came to the attention of the assessors during the day of the assessment and should not be relied upon as an exhaustive record of all possible risks or hazards that may exist or potential improvements that can be made.

2-(Ventilation) BG Vestibules MUA 2_1

  • Ventilation

    IMG_2048.jpeg.jpg
  • Monday. MUA 2_1. Fan status. ON - OFF. Supply air temp_______________℃

  • Tuesday. MUA 2_1. Fan status. ON - OFF. Supply air temp_______________℃

  • Wednesday. MUA 2_1. Fan status. ON - OFF. Supply air temp_______________℃

  • Thursday. MUA 2_1. Fan status. ON - OFF. Supply air temp_______________℃

  • Friday. MUA 2_1. Fan status. ON - OFF. Supply air temp_______________℃

Disclaimer

  • Disclaimer The assessors believe the information contained within this risk assessment report to be correct at the time of printing. The assessors do not accept responsibility for any consequences arising from the use of the information herein. The report is based on matters which were observed or came to the attention of the assessors during the day of the assessment and should not be relied upon as an exhaustive record of all possible risks or hazards that may exist or potential improvements that can be made.

3-(Ventilation) CACF Vestibules MUA 2_2

  • Ventilation

    IMG_2049.jpeg.jpg
  • Monday. MUA 2_2. Fan status. ON - OFF. Supply air temp_______________℃

  • Tuesday. MUA 2_2. Fan status. Fan status. ON - OFF. Supply air temp_______________℃

  • Wednesday. MUA 2_2. Fan status. ON - OFF. Supply air temp_______________℃

  • Thursday. MUA 2_2. Fan status. Fan status. ON - OFF. Supply air temp_______________℃

  • Friday. MUA 2_2. Fan status. ON - OFF. Supply air temp_______________℃

Disclaimer

  • Disclaimer The assessors believe the information contained within this risk assessment report to be correct at the time of printing. The assessors do not accept responsibility for any consequences arising from the use of the information herein. The report is based on matters which were observed or came to the attention of the assessors during the day of the assessment and should not be relied upon as an exhaustive record of all possible risks or hazards that may exist or potential improvements that can be made.

4-(Ventilation) Residential Lobby MUA 2_3

  • Ventilation

    IMG_2050.jpeg.jpg
  • Monday. MUA 2_3. Fan status. ON - OFF. Supply air temp_______________℃

  • Tuesday. MUA 2_3. Fan status. Fan status. ON - OFF. Supply air temp_______________℃

  • Wednesday. MUA 2_3. Fan status. ON - OFF. Supply air temp_______________℃

  • Thursday. MUA 2_3. Fan status. ON - OFF. Supply air temp_______________℃

  • Friday. MUA 2_3. Fan status. ON - OFF. Supply air temp_______________℃

Disclaimer

  • Disclaimer The assessors believe the information contained within this risk assessment report to be correct at the time of printing. The assessors do not accept responsibility for any consequences arising from the use of the information herein. The report is based on matters which were observed or came to the attention of the assessors during the day of the assessment and should not be relied upon as an exhaustive record of all possible risks or hazards that may exist or potential improvements that can be made.

5-(Ventilation) Parkade MUA 1_1

  • Ventilation

    IMG_2051.jpeg.jpg
  • EF-P1

    IMG_2696.jpeg.jpg
  • EF-P2

  • EF-P3

  • EF-P4

  • EF-P5

    IMG_2697.jpeg.jpg
  • Monday. MUA 2_3. Fan status. ON - OFF. Supply air temp_______________℃

  • Tuesday. MUA 2_3. Fan status. ON - OFF. Supply air temp_______________℃

  • Wednesday. MUA 2_3. Fan status. ON - OFF. Supply air temp_______________℃

  • Thursday. MUA 2_3. Fan status. ON - OFF. Supply air temp_______________℃

  • Friday. MUA 2_3. Fan status. ON - OFF. Supply air temp_______________℃

Disclaimer

  • Disclaimer The assessors believe the information contained within this risk assessment report to be correct at the time of printing. The assessors do not accept responsibility for any consequences arising from the use of the information herein. The report is based on matters which were observed or came to the attention of the assessors during the day of the assessment and should not be relied upon as an exhaustive record of all possible risks or hazards that may exist or potential improvements that can be made.

6-⚠️(Ventilation) Ammenities MUA 4_3

  • Ventilation

    IMG_2819.jpeg.jpg
  • Ventilation

    IMG_2052.jpeg.jpg
  • Monday. MUA 4_3. Fan status. ON - OFF. Supply air temp_______________℃

  • Tuesday. MUA 4_3. Fan status. ON - OFF. Supply air temp_______________℃

  • Wednesday. MUA 4_3. Fan status. ON - OFF. Supply air temp_______________℃

  • Thursday. MUA 4_3. Fan status. ON - OFF. Supply air temp_______________℃

  • Friday. MUA 4_3. Fan status. ON - OFF. Supply air temp_______________℃

Disclaimer

  • Disclaimer The assessors believe the information contained within this risk assessment report to be correct at the time of printing. The assessors do not accept responsibility for any consequences arising from the use of the information herein. The report is based on matters which were observed or came to the attention of the assessors during the day of the assessment and should not be relied upon as an exhaustive record of all possible risks or hazards that may exist or potential improvements that can be made.

7-(Ventilation) Hallway Ventilation MUA 45_1

  • Ventilation

    IMG_2823.jpeg.jpg
  • Ventilation

    IMG_2053.jpeg.jpg
  • Monday. MUA Glycol pump 1️⃣ - 2️⃣. Supply➡️__________PSI. Return➡️__________PSI. Flow➡️__________GPM. Speed🔄__________RPM. Power__________kw. Voltage__________V. Current__________A. Supply⤵️__________℃. Return⤴️__________℃. H2O Inlet__________. H2O Outlet.__________. △T__________.🔥__________. Status. ON - S/B. Supply Fan. ON - OFF.

  • Tuesday. MUA Glycol pump 1️⃣ - 2️⃣. Supply➡️__________PSI. Return➡️__________PSI. Flow➡️__________GPM. Speed🔄__________RPM. Power__________kw. Voltage__________V. Current__________A. Supply⤵️__________℃. Return⤴️__________℃. H2O Inlet__________. H2O Outlet.__________. △T__________.🔥__________. Status. ON - S/B. Supply Fan. ON - OFF

  • Wednesday. MUA Glycol pump 1️⃣ - 2️⃣. Supply➡️__________PSI. Return➡️__________PSI. Flow➡️__________GPM. Speed🔄__________RPM. Power__________kw. Voltage__________V. Current__________A. Supply⤵️__________℃. Return⤴️__________℃. H2O Inlet__________. H2O Outlet.__________. △T__________.🔥__________. Status. ON - S/B. Supply Fan. ON - OFF

  • Thursday. MUA Glycol pump 1️⃣ - 2️⃣. Supply➡️__________PSI. Return➡️__________PSI. Flow➡️__________GPM. Speed🔄__________RPM. Power__________kw. Voltage__________V. Current__________A. Supply⤵️__________℃. Return⤴️__________℃. H2O Inlet__________. H2O Outlet.__________. △T__________.🔥__________. Status. ON - S/B. Supply Fan. ON - OFF

  • Friday. MUA Glycol pump 1️⃣ - 2️⃣. Supply➡️__________PSI. Return➡️__________PSI. Flow➡️__________GPM. Speed🔄__________RPM. Power__________kw. Voltage__________V. Current__________A. Supply⤵️__________℃. Return⤴️__________℃. H2O Inlet__________. H2O Outlet.__________. △T__________.🔥__________. Status. ON - S/B. Supply Fan. ON - OFF

Disclaimer

  • Disclaimer The assessors believe the information contained within this risk assessment report to be correct at the time of printing. The assessors do not accept responsibility for any consequences arising from the use of the information herein. The report is based on matters which were observed or came to the attention of the assessors during the day of the assessment and should not be relied upon as an exhaustive record of all possible risks or hazards that may exist or potential improvements that can be made.

8-⚠️(Ventilation) Gas Sensors

  • Ventilation

    IMG_2054.jpeg.jpg
  • Monday. Gas sensors VI

  • Tuesday. Gas sensors VI

  • Wednesday. Gas sensors VI

  • Thursday. Gas sensors VI

  • Friday. Gas sensors VI

Disclaimer

  • Disclaimer The assessors believe the information contained within this risk assessment report to be correct at the time of printing. The assessors do not accept responsibility for any consequences arising from the use of the information herein. The report is based on matters which were observed or came to the attention of the assessors during the day of the assessment and should not be relied upon as an exhaustive record of all possible risks or hazards that may exist or potential improvements that can be made.

1-(Mechanical) Generator

  • Mechanical Maintenance (weekly inspection)
    - Inspect for proper operation of all auxiliary equipment
    - Inspect battery cells for correct electrolyte fill level
    - Inspect battery charging system
    - Inspect all electrical connections
    - Inspect all belts and hoses for cracks or leaks
    - Record all inspections, tests and corrective actions in log book
    - Leave unit in “auto” position
    -Fuel level.
    -Monthly operational run test. (60 minutes)
    -IR

    IMG_2055.jpeg.jpg
  • IMG_2901.jpeg.jpg
  • Monday. Generator. Intake_______________⁒. Exhast_______________⁒. Space temp_______________℃

  • Tuesday. Generator. Intake_______________⁒. Exhast_______________⁒. Space temp_______________℃

  • Wednesday. Generator. Intake_______________⁒. Exhast_______________⁒. Space temp_______________℃

  • Thursday. Generator. Intake_______________⁒. Exhast_______________⁒. Space temp_______________℃

  • Friday. Generator. Intake_______________⁒. Exhast_______________⁒. Space temp_______________℃

Disclaimer

  • Disclaimer The assessors believe the information contained within this risk assessment report to be correct at the time of printing. The assessors do not accept responsibility for any consequences arising from the use of the information herein. The report is based on matters which were observed or came to the attention of the assessors during the day of the assessment and should not be relied upon as an exhaustive record of all possible risks or hazards that may exist or potential improvements that can be made.

2-⚠️(Mechanical) Sump Pumps

  • Mechanical

    IMG_2038.jpeg.jpg
  • Monday. Sump pumps run test: 1/2🔲 - 3/4🔲 - 5A/B🔲 - 6/7🔲 - 8A/B🔲 - 9🔲 - 10🔲

  • Tuesday. Sump pumps run test: 1/2🔲 - 3/4🔲 - 5A/B🔲 - 6/7🔲 - 8A/B🔲 - 9🔲 - 10🔲

  • Wednesday. Sump pumps run test: 1/2🔲 - 3/4🔲 - 5A/B🔲 - 6/7🔲 - 8A/B🔲 - 9🔲 - 10🔲

  • Thursday. Sump pumps run test: 1/2🔲 - 3/4🔲 - 5A/B🔲 - 6/7🔲 - 8A/B🔲 - 9🔲 - 10🔲

  • Friday. Sump pumps run test: 1/2🔲 - 3/4🔲 - 5A/B🔲 - 6/7🔲 - 8A/B🔲 - 9🔲 - 10🔲

Disclaimer

  • Disclaimer The assessors believe the information contained within this risk assessment report to be correct at the time of printing. The assessors do not accept responsibility for any consequences arising from the use of the information herein. The report is based on matters which were observed or came to the attention of the assessors during the day of the assessment and should not be relied upon as an exhaustive record of all possible risks or hazards that may exist or potential improvements that can be made.

3-(Mechanical) Snowmelt

  • Mechanical

    IMG_2056.jpeg.jpg
  • Monday. SM_P 1️⃣ - 2️⃣. Supply➡️__________PSI. Return➡️__________PSI. Flow__________GPM. Speed🔄__________RPM. Power__________kw. Voltage__________V. Current__________A. Supply⤵️__________℃. Return⤴️__________℃. H2O Inlet➡️__________. H2O Outlet➡️__________. △T__________.🔥__________. Status. ON - Stand by🔄 - OFF. SGT inlet_______________℃. RGT outlet_______________℃

  • Tuesday. SM_P 1️⃣ - 2️⃣. Supply➡️__________PSI. Return➡️__________PSI. Flow__________GPM. Speed__________RPM. Power__________kw. Voltage__________V. Current__________A. Supply⤵️__________℃. Return⤴️__________℃. H2O Inlet➡️__________. H2O Outlet➡️__________. △T__________.🔥__________. Status. ON - Stand by🔄 - OFF. SGT inlet_______________℃. RGT outlet_______________℃

  • Wednesday. SM_P 1️⃣ - 2️⃣. Supply➡️__________PSI. Return➡️__________PSI. Flow__________GPM. Speed🔄__________RPM. Power__________kw. Voltage__________V. Current__________A. Supply⤵️__________℃. Return⤴️__________℃. H2O Inlet➡️__________. H2O Outlet➡️__________. △T__________.🔥__________. Status. ON - Stand by🔄 - OFF. SGT inlet_______________℃. RGT outlet_______________℃

  • Thursday. SM_P 1️⃣ - 2️⃣. Supply➡️__________PSI. Return➡️__________PSI. Flow__________GPM. Speed🔄__________RPM. Power__________kw. Voltage__________V. Current__________A. Supply⤵️__________℃. Return⤴️__________℃. H2O Inlet➡️__________. H2O Outlet➡️__________. △T__________.🔥__________. Status. ON - Stand by🔄 - OFF. SGT inlet_______________℃. RGT outlet_______________℃

  • Friday. SM_P 1️⃣ - 2️⃣. Supply➡️__________PSI. Return➡️__________PSI. Flow__________GPM. Speed🔄__________RPM. Power__________kw. Voltage__________V. Current__________A. Supply⤵️__________℃. Return⤴️__________℃. H2O Inlet➡️__________. H2O Outlet➡️__________. △T__________.🔥__________. Status. ON - Stand by🔄 - OFF. SGT inlet_______________℃. RGT outlet_______________℃

Disclaimer

  • Disclaimer The assessors believe the information contained within this risk assessment report to be correct at the time of printing. The assessors do not accept responsibility for any consequences arising from the use of the information herein. The report is based on matters which were observed or came to the attention of the assessors during the day of the assessment and should not be relied upon as an exhaustive record of all possible risks or hazards that may exist or potential improvements that can be made.

4-(Mechanical) CRU’s

  • Mechanical

    IMG_2057.jpeg.jpg
  • Monday. CRU’1️⃣__________℃. CRU’2️⃣__________℃. CRU’3️⃣__________℃. CRU’4️⃣__________℉ __________℉. CRU’5️⃣__________℃. Comms__________℃

  • Tuesday. CRU’1️⃣__________℃. CRU’2️⃣__________℃. CRU’3️⃣__________℃. CRU’4️⃣__________℉__________℉. CRU’5️⃣__________℃. Comms__________℃

  • Wednesday. CRU’1️⃣__________℃. CRU’2️⃣__________℃. CRU’3️⃣__________℃. CRU’4️⃣__________℉__________℉. CRU’5️⃣__________℃. Comms__________℃

  • Thursday. CRU’1️⃣__________℃. CRU’2️⃣__________℃. CRU’3️⃣__________℃. CRU’4️⃣__________℉__________℉. CRU’5️⃣__________℃. Comms__________℃

  • Friday. CRU’1️⃣__________℃. CRU’2️⃣__________℃. CRU’3️⃣__________℃. CRU’4️⃣__________℉__________℉. CRU’5️⃣__________℃. Comms__________℃

  • Disclaimer The assessors believe the information contained within this risk assessment report to be correct at the time of printing. The assessors do not accept responsibility for any consequences arising from the use of the information herein. The report is based on matters which were observed or came to the attention of the assessors during the day of the assessment and should not be relied upon as an exhaustive record of all possible risks or hazards that may exist or potential improvements that can be made.

P_2 water testing, meter meter 650.041

  • Monday: P_2 water testing🔬

  • Tuesday: P_2 water testing🔬

  • Wednesday: P_2 water testing🔬

  • Thursday: P_2 water testing🔬

  • Friday: P_2 water testing🔬

  • Disclaimer The assessors believe the information contained within this risk assessment report to be correct at the time of printing. The assessors do not accept responsibility for any consequences arising from the use of the information herein. The report is based on matters which were observed or came to the attention of the assessors during the day of the assessment and should not be relied upon as an exhaustive record of all possible risks or hazards that may exist or potential improvements that can be made.

45_ L water testing

  • Monday: 45_L water testing🔬

  • Tuesday: 45_L water testing🔬

  • Wednesday: 45_L water testing🔬

  • Thursday: 45_L water testing🔬

  • Friday: 45_L water testing🔬

  • Disclaimer The assessors believe the information contained within this risk assessment report to be correct at the time of printing. The assessors do not accept responsibility for any consequences arising from the use of the information herein. The report is based on matters which were observed or came to the attention of the assessors during the day of the assessment and should not be relied upon as an exhaustive record of all possible risks or hazards that may exist or potential improvements that can be made.

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.