Lighting Equipment and Controls
-
All Lighting control equipment installed terminated and labelled to the correct standard.
-
Lighting Control Equipment programmed in accordance to supplied strategy schedule by INTO Lighting.
-
All Lighting keypads checked for functionality throughout the apartment.
-
All Lighting control information available from the Crestron Touch panel interfaces.
Audio Visual Equipment and controls
-
All Audio Visual Equipment installed, terminated and tested in accordance to CPD.
-
All Audio visual equipment powered and tested
-
All Audio Visual Equipment programmed in to the Crestron interface and control functionality confirmed.
HVAC Interface
-
HVAC matrix supplied by BMS Contractor
-
HVAC Interface programmed into Crestron platform
-
HVAC Tested to confirm functionality is present and controllable.
Fire Alarm Interface
-
Fire Alarm Interface terminated and tested for functionality confirmation
Blind Control Interface
-
All Blind Control interfaces programmed by Lutron Programmers, with integration ID's supplied to the Crestron interface.
-
Blind Functionality confirmed to Blind Control Cable termination point.
ICT/AV Infrastructure
-
All Cabling installed and terminated with the exception of future provision cabling within the apartments.
-
All terminated cabling tested using calibrated test equipment with test results submitted to manufacturer for acceptance into the 25 year warranty scheme
Witnessing Sign Off
-
Apartment verification taken place for client sign off.
-
Outstanding works exemption list, due to Shell & Core not being ready for integration.
-