Introduction
-
I attended site today to conduct a site survey to ascertain dimensions and interface detail for the proposed patent glazing system to the roof of:
Site conditions
-
Is the structural opening ready to be surveyed
-
Is there safe access and egress to and from site
-
Is there a 110v power supply available
-
Are adequate welfare facilities available
-
Is task lighting required
-
Delivery vehicle most suited for this site
-
Storage solutions available on site
Technical
Site dimensions
-
I was able to identify the sizes required for our drawing office to issue a drawing for your approval
-
I wasn't able to take site dimensions today because:
-
The structure wasn't fully formed
-
It was unsafe to do so due to inadequate scaffolding arrangements
-
Upon site investigation we feel our system isn't suitable for this application
-
Roof plan
-
Section through glazing
-
Interface details
-
Other
-
Site photographs
-
Survey notes
Specification
-
Glazing system
- Rafter line
- Skyline
- Skyline Box
- Traditional
- Heritage
- Skylight
-
Glazing bar
- SPG1
- SPG2
- SPG3
- SPG4
- SPG5
- SPG7
- SPG10
- SPG15
- BL4
- BL6
- BL7
- Lead covered No.5
- Lead covered No.7
-
Cap
- PC1&2
- PC1
- w1
- C4
- C6
- SC1&3
- N/A
-
Finish
-
Colour and texture reference if specified
-
Flashing specification
-
Infill type
-
Infill specification if known
-
Vent type
-
Vent gearing
Site access
Existing scaffolding arrangements
-
The existing scaffolding arrangements on site are adequate and will enable a successful installation
-
The existing scaffolding arrangements are not adequate and must be changed to suit our requirements. Failure to amend the scaffolding arrangements prior to our site installation visit could result in programme delays and cost implications.
-
The Standard Patent Glazing Co.Ltd. are supplying scaffolding
Scaffolding requirements
-
We require a fixed scaffold to the perimeter and underside of the structural opening to enable our installation team to fix the proposed glazing system. The height of the scaffold should be around 300mm below the bottom curb. Scaffolding structures must not protrude the glazing line.
-
We require mobile aluminium tower scaffolds to the perimeter and underside of the structural opening to enable our installation team to fix the proposed glazing system. The height of the scaffold should be around 300mm below the bottom curb. Scaffolding structures must not protrude the glazing line.
-
We require a fixed scaffold to the underside of the structural opening to enable our installation team to fix the proposed glazing system. The height of the scaffold should be around 300mm below the bottom curb. Scaffolding structures must not protrude the glazing line.
-
We require mobile aluminium tower scaffolds to the underside of the structural opening to enable our installation team to fix the proposed glazing system. The height of the scaffold should be around 300mm below the bottom curb. Scaffolding structures must not protrude the glazing line.
-
N/A
-
Other scaffolding requirements
Hoisting requirements
-
Hoisting solution
- Mechanical goods hoist
- scissor lift
- tele-handler
- manual lift
- Telescopic boom
Programme
Lead-in times
-
Drawings - Our current lead-in time for completion of approval drawings is
- 1 week
- 2 weeks
- 3 weeks
- 4 weeks
- 5 weeks
- 6 weeks
- 7 weeks
- 8 weeks
- 9 weeks
- 10 weeks
- 11 weeks
- 12 weeks
- 1 day
- 2 days
- 3 days
-
Manufacture(approval of drawings is required prior to the commencement of manufacture) - Our current lead-time for the manufacture of the proposed glazing system is
- 1 week
- 2 weeks
- 3 weeks
- 4 weeks
- 5 weeks
- 6 weeks
- 7 weeks
- 8 weeks
- 9 weeks
- 10 weeks
- 11 weeks
- 12 weeks
- 1 day
- 2 days
- 3 days
-
Installation - Weather permitting, installation will take upto
- 1 week
- 2 weeks
- 3 weeks
- 4 weeks
- 5 weeks
- 6 weeks
- 7 weeks
- 8 weeks
- 9 weeks
- 10 weeks
- 11 weeks
- 12 weeks
- 1 day
- 2 days
- 3 days
Payment
Payment type
-
A Pro-forma invoice was dispatched to your Company along with our order confirmation pack. The pro-forma invoice must be paid prior to our installation team attending site.
-
We have sufficient cover on your Company to enable payment upon completion of our installation. Payment specifications will be detailed in our invoice.
Conclusion
-
Conclusion
-
I agree that the information recorded here is accurate representation of the site listed above.
-
Client signature
-
On behalf of The Standard Patent Glazing Co.Ltd.