Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
1. Safety Administration
-
A) Any injuries or near misses to report? If yes, explain.
-
B) Any incidents to be reported?
-
C) First Aid Kit Supplied-Stocked
-
D) Fire Extinguishers in place / Current Inspection
-
E) Job Hazard Analysis Form Complete<br>
-
F) Other
2) Housekeeping / Site Hazards
-
A) Work Areas Clean and Free of Excess Trash and Debris
-
B) Adequate Lighting
-
C) Passageways & Walkways Clear
-
D) Terrain / Leading Edges / Excavations Identified
3) Personal Protective Equipment / Stocked
-
A) Hard Hat, Safety Glasses, Steel/Metatarsal Boots
-
B) Hearing Protection
-
C) FR Clothing / Chemical Suits
-
D) Other
4) Lockout / Tagout
-
A) Lockout/Tagout Program in Place
-
B) Proper Paperwork Completed and Filed
5) Hand Tools, Power Tools and Power Equipment
-
A) All Mechanical Safeguards in Place / Ladders Inspected
-
B) Cords in Good Condition, Elevated, or Protected
-
D) Non-Functioning tools tagged properly to be sent for repairs
-
E) Calibration Records up to date
6) Storage Area
-
A) Stock Organized and Marked
-
B) Hardware Stocked
-
C) Overstocked / Understocked
-
D) Materials Protected from Damage/Weather
-
E) Adequate Lighting
-
F) Passageways & Walkways Clear
7) Office Area
-
A) Clean / Organized
8) Materials
-
A) Requisitions filled out properly with Account Numbers
-
B) Packing slips signed and turned in
9) Project Status
-
A) Is project progressing according to schedule? If no, explain.
-
B) Are there areas where we are being held up by others? If yes, explain including pictures.
-
C) Are there any issues that will impact schedule. If so, what are they?
-
D) Description of work being performed?
-
Tasks in Progress:
-
E) Manpower loading adequate? List total on site.
-
F) Major Equipment on site.
-
List Equipment:
10) Work Plans / Project Schedule
-
A) Project Schedule - All trades
-
B) Work Journals completed to date
-
C) Manpower is productive
-
D) items needed from drawings, information, or others? If yes, explain.
11) Change Vouchers
-
A) Vouchers completed properly
-
B) Vouchers up-to-date
12) Timesheets
-
A) Completed and filed properly
-
B) Employee numbers on sheet / Labor Account Codes
13) Disciplinary Action Documentation
-
A) Disciplinary Action book on site
-
B) Book in use and filled out properly
14) Drawings
-
A) As-Builts up-to-date
-
B) Dimensions on As-Builts for locations and routings
-
C) Initialed by Inspector for changes
Job Photos
-
Add Job Photos
Additional Comments/Communications
-
Signature From Evaluator: