Information
-
Audit Title
-
Document No.
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Management Controls
-
Check that a signed copy of Form 10 has been sent to the local HSE office and that a copy is displayed on site.
-
Has a construction phase health and safety plan been produced and approved by the CDMC
-
Check employers and public liability insurance certificates are valid and on display.
-
Have appropriate signs/notices been erected around the site i.e. mandatory use of PPE, Incomplete Scaffolds, No Smoking, Traffic Management, Fire assembly, Fist Aid Points etc.
-
Ensure a new style Accident Book (which complies with the Data Protection Act) is provided on site and is available to all personnel
-
Ensure that all persons have received a site induction
-
Ensure all operatives have been provided with information relating to Health & Safety for the work they are undertaking.
-
Ensure adequate supervision is provided for all activities on the site paying particular attention to work activities as undertaken by young persons and/or those which are high risk activities.
-
Ensure site safety rules are displayed in a prominent position e.g. reception, canteen, site office etc.
-
Ensure all subcontractors have been assessed and are adequately resourced and competent for the work they are undertaking.
-
Management controls compliant?
Access and Egress
-
Is there safe access and egress to all working areas of the site?
-
Are walkways free from obstructions and stored materials?
-
Ensure all public access routes are kept clean and clear at all times.
-
Ensure there are suitable barriers and warning notices to keep members of the public separated from the site works and site traffic.
-
Ensure the site is secure at all times to prevent unauthorised access.
-
Access and egress Compliant?
Asbestos Management
-
Has an asbestos survey been carried out in accordance with HSG264?
-
Has the presence of asbestos been detected ?
-
If asbestos is present has it been removed, or encapsulated by a licence asbestos removal contractor ?
-
Can the asbestos be removed as non licensed removal ?
-
Have suitable and sufficient RAMS been produced for this work ?
-
Are certificates of re-occupancy in place?
-
Are waste consignment notes in place?
-
Asbestos Management Compliant?
Compressed Gasses (e.g. LPG, Acetylene)
-
Are they kept away from flammable liquids?
-
Are the properly stored in a purpose made cage?
-
Is the equipment in good working condition ?
-
Compressed gasses compliant?
Confined Spaces
-
Only appropriately trained and qualified persons who have undergone an accredited confined spaces entry course shall be permitted to enter a confined space, and only then if the correct checks have been made and the correct safety equipment (breathing apparatus, gas detection equipment, emergency escape equipment etc) are used.
-
Is there a risk assessment for the confined spaces work?
-
Controls should include atmospheric monitoring, emergency escape arrangements, adequate supervision (i.e.: a top man outside of the confined space), method of raising the alarm and safe access/egress etc.
-
Ensure all confined space permits have been checked, are valid and being strictly enforced.
-
Confined Spaces compliant?
Consultation
-
Has a system been established for employees to comment and be consulted on health, safety and welfare issues.
-
Ensure appropriate Tool Box Talks are given to all employees and that the Tool Box Talks are appropriate and relevant to the work being undertaken.
-
Ensure that an attendance register has been maintained and signed by all persons present at each Tool Box Talk.
-
Consultation compliant?
Control of Substances Hazardous to Health (COSHH)
-
Have COSSH Assessments been carried out for all potentially hazardous materials and substances being used on the site. And are accompanied by the MSDS ?
-
Have the hazards associated with the use of such materials been properly communicated to those affected.
-
Ensure all dangerous/hazardous materials/Substances are clearly marked/identified and stored in a secure location appropriate to the substance.
-
COSHH Compliant?
Portable Electrical Equipment
-
Check that only 110v CTE hand tool etc are in use.
-
Check that tools and equipment are visually checked and regularly inspected/tested by a competent person. (PAT)
-
Ensure that cables and trailing leads are not trip hazards.
-
Electrical Equipment compliant?
Environmental Management
-
Site wide issues
-
Is there any evidence of invasive plants, if so are precautions adiquate?
-
Note - it is an offence to propagate or cause to spread Japanese Knotweed, Giant Hogweed, Ragwort and Himalayan Balsam.
-
Is the site free from trees that have a tree protection order (TPO)?
-
Energy efficiency
-
Have all practical measures been implemented to increase the energy efficiency of the site.
-
Environmental Emergency
-
Is an Emergency Plan in place?
-
General Environmental Management
-
Are environmental guidance notes available on site?
-
Are any concrete washout facilities suitable?
-
Are any noise/dust issues present and are they being suitably controlled?
-
Are environmental checks taking place?
-
Environmental Registers
-
Is the environmental register up to date and relevant?
-
Is the site registered under the hazardous waste regulations?
-
Is an Aspects & Impacts register in place - risk prevention measures identified etc.?
-
Spill Response
-
Are spill kits available?
-
Located in the correct areas?
-
Staff and operatives aware of their location?
-
Have emergency drills taken place?
-
Is their location communicated via induction?
-
Are the contents regulary checked?
-
Working on or near water
-
Are appropriate pollution prevention measures in place and adequate?
-
Are soil heaps located away from rivers/streams?
-
Environmental Management compliant?
Excavations/Earthworks
-
Ensure that checks are made to determine the presence of any buried services before and during all excavation works.
-
All excavations should be carried out in accordance with RAMS and permit to dig.
-
Check that there is adequate support and propping for the excavation, or whether it has been sloped or battered back to a safe angle.
-
Check that there is safe access into the excavation and barriers are in place
-
Does the excavation affect the stability of neighbouring structures or services.
-
Ensure that materials, spoil and plant is stored away from the edge of the excavation to reduce the chance of collapse.
-
Ensure that the excavation is regularly inspected by a competent person and that a record of such inspections is maintained.
-
Excavations/Earthwork compliant?
Fire Risks and Management
-
Ensure there are emergency procedures for evacuating the site in case of a fire. And all persons know them
-
Check that there is an adequate means of raising the alarm, and that it is regularly tested.
-
Ensure that there are adequate escape routes and that these are kept clear of obstructions.
-
Check that suitable fire extinguishers are provided and that they are maintained and in a good condition.
-
Fire Risk and Management compliant?
First Aid
-
Are the names of all first aiders detailed on the site notice board, and the location of the first aid box ?
Housekeeping
-
Ensure all debris and waste is removed from the work area upon completion of the work or on a regular basis
-
Ensure Debris is not be allowed to collect around the site.
-
Housekeeping compliant?
Induction
-
Ensure all staff and visitors receive a site specific safety induction before starting work.
-
Are site safety inductions being adequately carried out both for staff and visitors?
Lifting Operations/Equipment
-
Ensure a (competent) Appointed Person co-ordinates all lifting operations.
-
Have all lifting operation got a valid lifting plan?
-
Check that the operators are trained and competent.
-
All lifting equipment should have a thorough examination every 6 months.
-
Lifting Operations/Equipment compliant?
Lone Working / Out of hours working
-
Is there a risk assessment for lone working?
-
Is access to first aid, welfare facilities and emergency services available to the worker/s?
-
Lone Working compliant?
Low Level Access Including Steps, Podiums and Push around Verticals
-
Are podiums / PAV 's used before steps are allowed?
-
Are podiums / PAV's maintained and inspected regularly?
-
Are steps class 1 as defined in EN131?
-
Is a permit system in place for step ladders ?
-
Is there a risk assessment in place for low level access?
-
Low level access compliant?
Manual Handling
-
Ensure that a manual handling risk assessment has been completed wherever regular lifting of heavy loads is required.
-
Check the suitability of using wheelbarrows, hoists, telehandlers and other plant or machinery so that manual handling of heavy objects is kept to a minimum.
-
Ensure all staff have received manual handling training.
-
Manual Handling compliant?
Mobile Scaffold Towers
-
Are mobile towers being erected and dismantled by trained competent operatives
-
Are they tagged safe for use?
-
Mobile Towers compliant?
HAV'S, Noise and Associated Health Risks
-
Check that workers have had information and training so that they know what the risks are from HAV and noise
-
Check that exposure to HAV and noise has been reduced as much as possible by selecting suitable work methods and Plant.
-
HAV'S, Noise and associated risks compliant?
Permits to Work
-
Is the permit to work system being operated by the client
-
Is the permit to work system being operated by Trustland
-
Ensure all Permits have been checked and reviewed and are valid for the work conditions.
-
Ensure old permits have been cancelled and closed.
-
Permits compliant?
Personal Protective Equipment (PPE)
-
Ensure that it is suitable for the type of work being undertaken.
-
Check that it is kept in good condition.
-
Eye Protection
-
Ensure that it is of a suitable grade for the type of work being undertaken. I.e. light protection or full goggle etc.
-
Foot Protection
-
Ensure that footwear is fitted with steel toecaps and steel sole plates.
-
Hand Protection - Ensure that where damaged to the hands may occur through activities such as handling, or when using hazardous substances/chemicals that all persons affected wear the appropriate class of safety glove.
-
Ensure gloves are correct for their application and the activity being undertaken.
-
Hearing Protection
-
Ensure the correct type of protection is in use for the task.
-
Safety Helmets
-
Ensure all staff and visitors are wearing safety helmets correctly
-
PPE requirements compliant?
Plant & Equipment
-
Ensure that tools and equipments are stored correctly to avoid damage to the equipment and persons.
-
Hand tools
-
Ensure that the right tools and equipment are being used for the right job.
-
Power Tools
-
Check that all dangerous parts are guarded e.g. gears, chain, drives, projecting engine shafts etc.
-
Check that tools are 110 v or battery operated
-
Check the supply cable for cuts, splits or other damage. All all cables free from damage?
-
Plant
-
Ensure all Plant and Machinery is inspected on a weekly basis by a competent person and recorded in a Plant Inspection Register.
-
Are all plant operators trained and hold a valid plant operators card for the categories being operated?
-
Is Plant Used Correctly.
-
Plant and Equipment compliant?
Registers and Records
-
Check the site Inspection Registers for items such as scaffolding, excavations, plant and other equipment have been completed in a timely fashion.
-
Registers and Records compliant?
Risk Assessments and Method Statements (RAMS)
-
Ensure all RAMS have been prepared by a competent person and have been checked, reviewed and signed.
-
Are RAMS adequate and suitable for the task?
-
Have the operatives signed each RAMS to confirm that they have read and understood and will work in accordance with the contents ?
-
Risk Assessments and Method Statements compliant?
Scaffolding/Working platforms
-
Check that any scaffold erection, alteration or dismantling is carried out by a competent qualified person.
-
Check that the scaffold is strong enough to carry the weight of materials stored on it and that they are evenly distributed.
-
Ensure that a competent person inspects the scaffold regularly, at least once a week; and always after it has been altered, damaged and following extreme weather.
-
Are scaffold tags in date ?
Security
-
Are the public fenced off or otherwise protected from the work?
-
Is the perimeter fence secure and un-damaged?
-
Are site security arrangements adequate?
Site Set up
-
Does the site have the standard Trustland Health And Safety notice board
-
Is the board complete and up to date?
-
Is the site set up in accordance with CDM and Company requirements?
Storage of Substances, Chemicals and Oils.
-
Are Substances, Chemicals and Oils stored in the correct manner?
-
Is there double bundled storage with at least 110%?
-
Is static plant fitted with drip trays?
-
Storage of Substances, Chemicals And Oils compliant?
Temporary Works
-
Is there a temporary works register and is it maintained?
-
Are competences available for all appointees?
-
Design
-
Identify the categories found on site in accordance with 5975' - 0, 1, 2, 3.
-
Is there a process in place for the site to communicate any changes etc back to designers?
-
Works
-
Have full working method statements and risk assessments been received and approved?
-
Are checks organised for critical stages?
-
Has the TW been inspected on completion and is there a record of the inspection?
-
Has permission been given to dismantle the works?
Traffic Management
-
Has a traffic management plan been prepared?
-
Are pedestrians segregated from moving vehicles and plant?
-
Are traffic management arrangement sutable?
Training and Skill Cards
-
Are all persons trained for their respective tasks?
-
Are Skill Cards available for inspection?
Waste Management
-
Is a waste management plan in place and sutable?
-
Is it being reviewed on a regular basis?
-
Are all waste carriers and transfer stations records available?
-
Are waste transfare notes available and correctly filled in?
-
Waste management requirements compliant?
Welfare Facilities
-
Ensure a facility is provided to change, dry and store clothing.
-
Mess facilities should include a place where workers can sit, make hot drinks and prepare food.
-
Mess facilities shall be of sufficient size for the number of employees on site and are provided with heating.
-
Ensure a supply of wholesome drinking water and cups are provided.
-
Ensure sufficient toilets are readily available, maintained, kept clean & are properly lit.
-
Ensure there are washbasins, hot and cold running water, soap and towels.<br>
-
Are welfare facilities compliant?
Working at Height
-
Check that access equipment is erected by competent persons and checked before use.
-
Ensure safe access and egress have been provided to areas.
-
Roof Work
-
Ensure that edge protection is provided to stop people or materials falling.
-
Ensure that precautions have been taken to stop people falling through fragile materials when working on roofs, e.g.: by providing barriers, covers or working platforms.
-
Ensure that people are kept away from areas below the roof work.
-
Ladders - Ladders should be used at an angle of 1:4 (75 degrees).
-
Ensure that ladders are in good condition, are not split, warped or have damaged rungs etc.
-
Check whether ladders are suitable for the purpose - only for short term work or for gaining access to another area.
-
Check that ladders rest against a solid level surface and that this is not a fragile or insecure material.
-
Check that ladders are secured to prevent them slipping sideways or backwards.
-
Check that ladders rise a sufficient height above their landing place (approx. 1m or 5 rungs).
-
Are work at height operation in accordance with the W@H Regulations?
Previous Audit Report
-
Has the previous audit report been closed out?
Other
Summary
Audit Risk Level
-
Risk rating for this Audit.
Corrective Actions
Sign off
-
I confirm I have had the contents of this audit report explained to me.
-
Project Manager
-
Person conducting this Audit.
-
Audit concluded at:
Closure
-
All actions on this report have been completed on: