Title Page

  • Contract Name:

  • Area Ref:

  • System:

  • Drawing No:

Inspection Details

  • Ductwork thermal insulation type as per specification

  • Ductwork thermal insulation thickness adequate

  • Ductwork thermal insulation finish correct

  • Ductwork thermal insulation metal cladding complete and satisfactory

  • Ductwork thermal insulation joints sound

  • Ductwork thermal insulation identification correct

  • Fresh air intake thermal insulation correct

  • FCU Plenum thermal insulation correct

  • Piped service, thermal insulation type correct

  • Piped service, thermal insulation thickness correct

  • Piped service, thermal insulation finish

  • Piped service, thermal insulation metal clad

  • Piped service, thermal insulation joints complete

  • Piped service, thermal insulation identification correct

  • Chilled water & mains cold water valve thermal insulation fitted

  • Kitchen ext. ductwork fire rating insulation type correct

  • Kitchen ext. ductwork fire rating insulation thickness correct

  • Kitchen ext. ductwork fire rating insulation finish

  • Kitchen ext. ductwork fire rating insulation joints sound

  • Kitchen ext. ductwork fire rating insulation identification correct

  • Kitchen ext. ductwork supports fire rating insulation

  • Kitchen ext. ductwork access door fire rating insulation

Inspection by:

  • Operative/Sub-Contractor Signature:

  • Vital Energi Supervisor/Manager Signature:

  • Date and Time of Insoection:

Page 1 of 1

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.