Information
-
TOW number
-
Date and time
-
Contractor name
-
Company name
-
Customer address
LIC DATA
-
LIC Present?
-
If YES LIC diameter
-
If YES LIC material
-
Telstra LIC used
-
Other LIC used
-
Reason for not using Telstra LIC
- Unable to locate LIC
- LIC not accessible
- Jiggle test failed, rod ding failed
- Unable to use HSE reason
- Jiggle test pass, rodding failed
- Potential excessive property damage
- Existing network Aerial
New NARA to FSD ($500 limit)
-
02-02-02-01-NA: Supply and install 1 x P50 (63 OD) pipe using boring techniques in OTR (other than rock) less than 250m
-
Add media
-
02-02-02-02-NA: Supply and install 1 x p100 (110 OD) pipe using boring techniques in OTR (other than rock) less than 250m
-
Add media
-
02-02-02-03-NA: Supply and install 2 x p100 (110 OD) pipes using boring techniques in OTR (other than rock) less than 250m
-
Add media
-
02-02-02-05-NA: Supply and install 1 x P50 (63OD) pipe using boring techniques in rock less than 250m
-
Add media
-
02-02-02-06-NA: Supply and install 1 x P100 (110OD) pipe using boring techniques in rock less than 250m
-
Add media
-
02-03-01-01-NA: Installation only of small pits at new locations in OTR (other than rock)
-
Add media
-
02-03-01-02-NA: Installation only of medium pits at new locations in OTR (other than rock)
-
Add media
-
02-03-02-01-NA: Extra over for excavation in rock for pit and manhole installations
-
Add media
-
02-03-04-01-NA: Installation only of small pits over existing infrastructure in OTR (other than rock)
-
Add media
-
02-04-01-01-NA: Core bore concrete - 50mm diameter hole
-
Add media
-
02-04-01-02-NA: Core bore concrete - 100mm diameter hole
-
Add media
-
02-06-01-02-NA: Breakout surface material, concrete (reinforced or Unreinforced) up to 150mm thick
-
Add media
-
02-06-01-03-NA: Breakout surface material, bitumen or asphalt pavement up to 100mm thick
-
Add media
-
02-06-01-04-NA Breakout surface material, bricks or pavers on compacted sand or base course layer
-
Add media
-
02-06-02-01-NA: Reinstatement of surface materials in turfed, grassed or soft landscape areas
-
Add media
-
02-06-02-02-NA: Reinstatement of surface materials in concrete (reinforced or Unreinforced) up to 150mm thick
-
Add media
-
02-06-02-03-NA: Reinstatement of surface materials in bitumen or asphalt pavement up to 100mm thick
-
Add media
-
02-06-02-04-NA: Reinstatement of surface materials in brick and pavers on compacted sand or base course layer
-
Add media
-
03-02-01-06-NA Identify and repair a single pipe at a single blockage location using non excavation technique (e.g. vac unit)
-
Add media
-
Grundomat set up and under bore all inclusive
-
Add media
-
Concrete core bore (premises apron)
-
Add media
FSD to NARA Quote
-
02-02-01-01-NA: Supply and install 1 x p50 PVC pipe in open trench in OTR (other than rock)
-
Add media
-
02-03-04-02-NA Installation only of medium pits over existing infrastructure in OTR (other than rock)
-
Add media
-
09-01-07-01-NA Single-axle tipper truck 5 tonne load
-
Add media
-
45-01-01-05-NA Supply only P5 plastic pit (710x455x635)
-
Add media
-
10-01-01-10-NA Other Third party mandatory requirements
-
Add media
-
10-01-01-06-NA Traffic control works
-
Add media
-
09-01-01-03-NA Plant operator - per hour
-
Add media
-
09-01-06-01-NA Excavators up to 10 tonne load
-
Add media
-
45-01-01-02-NA Supply only P2 plastic pit (655x290x635)
-
Add media
-
51-02-02-04-NA Supply and installation of P20 PVC lead in pipe from the street network access point to the property entry point
-
Add media
-
51-02-02-01-NA Supply and installation of P20 lead in pipe from the property entry point to the premises up to 15 meters
-
Add media
-
51-02-02-02-NA Supply and installation of P20 PVC lead in pipe from the proper entry point to the premises greater then 15 meters ie extra over 15 meters
-
Add media
-
Description and Material List Of NARA Works Required not listed above from common used codes
-
Photo 1
-
Photo 2
-
2nd Mud Map if required