Title Page
-
Customer Name
-
Client address
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Questions
-
Is the insulation material suitable for use with the property’s exposure level to wind driven rain?
-
Does the form of the construction of the property suggest that it was suitable for the material that has been installed
-
Does the current condition of the property suggest that it was suitable for the material that has been installed?
-
Does the drill pattern conform to the appropriate material compliance certificate?
-
Have all injection holes been filled & been finished to an acceptable aesthetic standard?
-
Are all airbricks and eves vents clear of insulation?
-
Are combustion vents/flues/chimneys clear of insulation and in compliance with HSE/CIGA guidance?
-
Have combustion air core vents been fitted where required?
-
Is there any evidence of the escape of insulation?
-
Are there any signs of damp or condensation?
-
Where a 'virgin' cavity has been claimed is there any evidence of CWI extraction?
-
Have cavity brushes been fitted where required?
Party wall insulation
-
Does the drill pattern confirm to the appropriate material compliance certificate?
-
Does the lancing pattern conform to the appropriate material compliance certificate?
-
Have all party cavity walls been insulated?
-
Have all injection holes been filled?
Scoring questions
-
Does the heating system installed match the notified measure type?
-
Does the property type match the notified property type?
-
Does the number of bedrooms match the notified number of bedrooms?
-
Is the notified percentage of the property treated a reasonable reflection of the actual percentage of the property treated when rounded to the nearest multiple of 10%?
-
Does the type of boiler installed match the type of boiler notified?
-
Do the heating controls installed,thermostat and TRVs to all radiators except those in the room with the thermostat?
-
Does the wall construction type notified match at least 50% of the total external wall area of the property? You
Customer care
-
Was identification provided by installation team?
-
Did we provide all tools and dust sheets where necessary?
-
Did we clean up satisfactory?
-
Has any damage occurred?
-
If damage occurred-has it been repaired satisfactory?
-
Inspector name and signature
-
Date of inspection
-
Customer name and signature
-
Date of inspection