Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
Select date
-
Add location
-
Reserve Name
-
APZ name
-
Inspected by
-
Previous works carried out?
-
Slope (Vertical distance/horizontal distance x 100= slope. Can use contours and map scale to do this)
-
Aspect (Stand at highest point and look down to lowest point, compass direction is the aspect)
-
ICL distance
-
INNER ZONE distance
-
OUTER ZONE distance
-
ICL no tree canopy
-
ICL no elevated/shrub fuel
-
ICL no ground covers to 10cm
-
ICL leaf litter 1.5-3cm
-
ICL no logs or branches under 8cm
-
ICL comments
-
ICL photos
-
INNER ZONE tree canopy with crowns separated by 5m or more
-
INNER ZONE elevated fuels and shrubs in small clumps
-
INNER ZONE ground covers to 10cm
-
INNER ZONE leaf litter to 7.5cm, 1.5-3 preferred
-
INNER ZONE no logs or branches under 8cm
-
INNER ZONE no tree branches within 3m of the ground
-
INNER ZONE no rough bark trees with shrubs abutting
-
INNER ZONE comments
-
INNER ZONE photos
-
OUTER ZONE tree canopy discontinuous with 2-5m crown separation
-
OUTER ZONE shrub layer in clumps 4m2, with 2-5m separation
-
OUTER ZONE ground covers to 30cm
-
OUTER ZONE leaf litter to 7.5cm, 1.5-3 CM preferred
-
OUTER ZONE no logs and branches under 8cm
-
OUTER ZONE no branches within 3m of ground
-
OUTER ZONE no rough bark trees with shrubs abutting
-
OUTER ZONE comments
-
OUTER ZONE photos
-
TARGET works
-
CREEK/STREAM name
-
CREEK/STREAM distance of creek from back of property.
-
CREEK/STREAM order using Strahler method
-
VEGETATION community
-
THREATENED flora
-
THREATENED fauna
-
WEEDS
-
ISSUES (eg dumping, encroachments, illegal works)
-
ISSUES photos
-
WORKS to be tasked to
-
Audit to be done using APZ cheat sheet (available on ECM). This document will heal guide your answers