Information
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
CDM Arrangements
-
Is a suitable Construction Phase Plan available on site?
-
Is an F10 Notification clearly displayed in the site office?
-
Is a valid in date insurance certificate on display?
General
-
Number of Workers on site at time of inspection
-
Select site weather conditions at time of this inspection (select all that apply)
- Clear Sky
- Cloudy
- Raining
- Windy
- Hazy
- Snow / Hail
- OTHER
-
Current activities being undertaken on site (select all that apply)
- General
- Abatement
- Demolition
- Pile Driving
- Formwork
- Reinforce Steel
- Steel Erection
- Mechanical
- Electrical
- Plumbing
- Glazing
- Roofing
- Drywall
- Painting
- Sitework
- Excavation
- Underground Work
- Stair Installation
- Cleanup
- OTHER
Site Safety Inspection
First Aid Facilities
-
Are first aid facilities to be inspected in this audit?
-
Are first aid cabinets and contents clean and orderly?
-
Is a defibrillator located on site?
Fire Prevention & Emergency
-
Are fire and emergency procedures to be inspected in this audit?
-
Fire evacuation within the last six months? (record the date)
-
Extinguishers in place, clearly marked for type of fire?
-
Extinguishers recently serviced? (check punch mark on tabs)
-
Fire alarm system functioning correctly?
Site Security
-
Is site security to be inspected in this audit?
-
Is site perimeter fenced off appropriately with required site public signage posted?
-
Are all entries and exits closed when not in use and locked at night and during weekends?
Personal Protective Equipment (PPE)
-
Is Personal Protective Equipment to be inspected in this audit?
-
Is head protection worn correctly and where required?
-
Is eye protection worn where required?
-
Is hearing protection worn in designated areas?
-
Are the correct forms of hand protection worn for manual tasks
-
Is respiratory protection worn where dust, mist or fumes are present?
-
Is footwear in good condition and of correct type?<br>
-
Are high-vis vests or clothing worn at all times outside the office?
-
Are safety harnesses appropriately worn at height?<br>
Housekeeping
-
Is site housekeeping to be inspected in this audit?
Work Areas
-
Work areas to be inspected in this audit?
-
Work areas are clear of rubbish and debris?
-
Are tools not in use put away?
-
There are no damaged power tools in use?
-
Work height and positioning correct for the type of work and the employee?
-
Do work areas have adequate task lighting?
Storage Design and Use
-
Site storage to be inspected in this audit?
-
Are materials stored in racks and bins wherever possible?
-
Are Trusses stored correctly? (Truss racks etc.)
-
Are racks and pallets in good condition generally?
Waste & Rubbish
-
Waste and rubbish to be inspected in this audit?
-
Are bins located at suitable points around site?
-
Is site generally orderly, with rubbish or waste materials disposed of correctly?
-
Are walkways and circulation routes clear of waste and debris
-
Do waste shutes lower sufficiently into Tipping Skips?
Trip and Fall Safety
-
Trip and fall safety to be inspected in this audit?
-
Are floor surfaces even and uncluttered?
-
Are walkways segregated with clipped barriers?
-
Are footpaths in good condition?
-
Is there proper scaffolding in place?
Scaffolding
-
Scaffolds to be inspected in this audit?
-
Are scaffolds constructed and erected only by qualified and trained personnel?
-
Have all scaffold plans been submitted and approved?
-
Are scaffolds accessible and clear of unstable objects and trip hazards?
-
Are guard rails installed on all scaffolds to correct spacing (n/e 470)?
-
Toe Boards fitted and secured
-
Are scaffold footings stable, secure and free of unstable propping objects (barrels, boxes, loose brick or concrete blocks etc)?
-
Are scaffolds generally safe and orderly?
-
Has a Hand Over Certificate / Alteration Certificate been issued
-
Are scaffolds being regularly inspected?
Hand and Power Tools
-
Hand and power tools to be inspected in this audit?
-
Are all tool guards in place and operable?
-
Are power cords in good condition?
-
Are all power tools in good condition?
-
Are tools stored correctly and in the right place when not in use?
-
Are hand tools manufactured to standard and in good condition?
-
Are dust collectors and exhausts provided on tools that produce large amounts of dust?
General Machinery, Plants and Equipment
-
General Machinery, Plants and Equipment to be inspected in this audit?
-
Are Thorough Examination records held on site where required?
-
If required, are relevant pre-start inspections being completed on machinery, equipment and plants?
-
Are machines kept clean?
-
Is there sufficient room to use all machines safely?
-
Are exclusion zones being implemented and managed correctly?
Ladders
-
Ladders to be inspected in this audit?
-
Are all ladders Industrial strength? (Non Household rated, check label.)
-
Are ladders in good condition?
-
If used for electrical work are ladders non conductive? (wood or fibre glass.)
-
Are ladders being used according to instructions?
Chemical Safety
-
Chemical safety to be inspected this audit?
-
Are COSHH Assessments held on site?
-
If applicable are special storage conditions followed?
-
Is fuel mixing undertaken in a designated refuelling area?
-
Are spill kits or other clean up arrangements available?
Confined Spaces
-
Confined spaces safety to be inspected this audit?
-
Do all applicable confined space works have adequate permits granted and documented?
-
Is a confined space emergency plan in place?
-
Are all workers undertaking confined space works trained in confined space entry and activities?
Incident, Injury & Accident Procedures
-
Incident, Injury & Accident Procedures to be inspected this audit?
-
Are Incident, Accident, Near Miss and Injury procedures in place?
-
Are adequate reporting forms for for these events in place?
-
Are all incidents investigated?
-
Are Corrective Actions then implemented?
General Comments
-
Any further comments or recommendations arising from this inspection?
-
Add any additional relevant photos
-
Please add any corrective actions to the appropriate questions above before completing this report
Sign Off
-
Name & Signature of Inspector
-
Name & Signature of Site Supervisor / Foreman