Information

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

Inspections

  • Electrical inspections completed

  • Plumbing inspections completed

  • Framing inspections completed

  • Exterior insulation inspected

E2468 Conference

  • LCD monitor blocking completed

  • SF blocking completed plumb and fastened tight to stud.

  • Wall bumper blocking completed

  • Shade pocket blocking completed

  • Switches are located correctly per 12/I401

  • Window mullion cap is in place and sealed

  • Sill stool trim is level and completed

E2466 Office

  • Shade pocket blocking completed

  • SF blocking completed plumb and fastened tight to stud.

  • Wall bumper blocking completed

  • Switches are located correctly (out of door swing). No back to back wall boxes within same stud space.

  • Sill stool trim is level and completed

E2456 Office

  • SF blocking completed plumb and fastened tight to stud.

  • Wall bumper blocking completed

  • Switches are located correctly (out of door swing). No back to back wall boxes within same stud space.

E2454 Office

  • SF blocking completed plumb and fastened tight to stud.

  • Wall bumper blocking completed

  • Switches are located correctly (out of door swing). No back to back wall boxes within same stud space.

E2452 Office

  • SF blocking completed plumb and fastened tight to stud.

  • Wall bumper blocking completed

  • Switches are located correctly (out of door swing). No back to back wall boxes within same stud space.

E2450 Office

  • SF blocking completed plumb and fastened tight to stud.

  • Wall bumper blocking completed

  • Switches are located correctly (out of door swing). No back to back wall boxes within same stud space.

E2458 Office

  • SF blocking completed plumb and fastened tight to stud.

  • Wall bumper blocking completed

  • Switches are located correctly (out of door swing). No back to back wall boxes within same stud space.

E2460 Office

  • SF blocking completed plumb and fastened tight to stud.

  • Wall bumper blocking completed

  • Switches are located correctly (out of door swing). No back to back wall boxes within same stud space.

E2462 Office

  • SF blocking completed plumb and fastened tight to stud.

  • Wall bumper blocking completed

  • Switches are located correctly (out of door swing). No back to back wall boxes within same stud space.

E2955 Storage

E2464 Teaming area

  • LCD monitor blocking completed

  • Shade pocket blocking completed

  • Sill stool trim is level and completed

E2400 Open Office

  • Shade pocket blocking completed

  • Sill stool trim is level and completed

  • Outlets under FEC are centered

E2446 Service Center

E2448 Enclave

  • SF blocking completed plumb and fastened tight to stud.

  • Switches are located correctly (out of door swing). No back to back wall boxes within same stud space.

E2942 Enclave

  • Wall bumper blocking completed

  • Switches are located correctly (out of door swing). No back to back wall boxes within same stud space.

E2300 Open Office

  • Shade pocket blocking completed

  • Sill stool trim is level and completed

  • Outlets under FEC are centered

E2940 Conference

  • SF blocking completed plumb and fastened tight to stud. In wall blocking at head & jambs.

  • Wall bumper blocking completed

  • TV mount blocking completed on East wall

  • Roughin boxes are located correctly per 14/I401

  • Wall mounted access panels in SE corner.

E2444 Office

  • SF blocking completed plumb and fastened tight to stud. In wall blocking at east jamb.

  • Wall bumper blocking completed

  • Wall mounted access panels in East wall.

  • Switches are located correctly (out of door swing). No back to back boxes within same wall cavity.

E2442 Office

  • SF blocking completed plumb and fastened tight to stud. In wall blocking at West jamb.

  • Confirm wall framing was revised to flush out at column enclosure.

  • Wall bumper blocking completed

  • Switches are located correctly (out of door swing). No back to back boxes within same wall cavity.

E2440 Office

  • SF blocking completed plumb and fastened tight to stud. In wall blocking at West jamb.

  • Confirm wall framing was revised to flush out at column enclosure.

  • Wall bumper blocking completed

  • Switches are located correctly (out of door swing). No back to back boxes within same wall cavity.

E2438 Office

  • SF blocking completed plumb and fastened tight to stud. In wall blocking at East jamb.

  • Wall bumper blocking completed

  • Switches are located correctly (out of door swing). No back to back boxes within same wall cavity.

E2426 Office

  • SF blocking completed plumb and fastened tight to stud.

  • Wall bumper blocking completed

  • Switches are located correctly (out of door swing). No back to back boxes within same wall cavity.

E2424 Office

  • SF blocking completed plumb and fastened tight to stud.

  • Wall bumper blocking completed

  • Switches are located correctly (out of door swing). No back to back boxes within same wall cavity.

E2422 Office

  • SF blocking completed plumb and fastened tight to stud.

  • Wall bumper blocking completed

  • Switches are located correctly (out of door swing). No back to back boxes within same wall cavity.

E2420 Enclave

  • SF blocking completed plumb and fastened tight to stud.

  • Wall bumper blocking completed

  • Switches are located correctly (out of door swing). No back to back boxes within same wall cavity.

E2418 Office

  • SF blocking completed plumb and fastened tight to stud.

  • Wall bumper blocking completed

  • Switches are located correctly (out of door swing). No back to back boxes within same wall cavity.

E2416 Office

  • SF blocking completed plumb and fastened tight to stud.

  • Wall bumper blocking completed

  • Switches are located correctly (out of door swing). No back to back boxes within same wall cavity.

E2414 Office

  • SF blocking completed plumb and fastened tight to stud.

  • Wall bumper blocking completed

  • Switches are located correctly (out of door swing). No back to back boxes within same wall cavity.

E2412 Office

  • SF blocking completed plumb and fastened tight to stud.

  • Wall bumper blocking completed

  • Switches are located correctly (out of door swing). No back to back boxes within same wall cavity.

E2410 Office

  • SF blocking completed plumb and fastened tight to stud.

  • Wall bumper blocking completed

  • Switches are located correctly (out of door swing). No back to back boxes within same wall cavity.

E2408 Closet

  • SF blocking completed plumb and fastened tight to stud.

  • Confirm framing at head is revised to match height of surrounding doors.

E2406 Interview

  • SF blocking completed plumb and fastened tight to stud.

  • Wall bumper blocking completed

  • Switches are located correctly (out of door swing). No back to back boxes within same wall cavity.

E2404 Interview

  • SF blocking completed plumb and fastened tight to stud.

  • Wall bumper blocking completed

  • Switches are located correctly (out of door swing). No back to back boxes within same wall cavity.

E2402 HR Entry

  • Confirm wall blocking above head screen wall

  • Outlets centered under FEC boxes (2)

E2430 Testing

  • SF blocking completed plumb and fastened tight to stud.

  • Wall bumper blocking completed

  • Switches are located correctly (out of door swing). No back to back boxes within same wall cavity.

E2432 Testing

  • SF blocking completed plumb and fastened tight to stud.

  • Wall bumper blocking completed

  • Switches are located correctly (out of door swing). No back to back boxes within same wall cavity.

E2434 Testing

  • SF blocking completed plumb and fastened tight to stud.

  • Wall bumper blocking completed

  • Switches are located correctly (out of door swing). No back to back boxes within same wall cavity.

E2436 Storage

  • Confirm sf head height matches surrounding heights

E2428 Video Conference

  • SF blocking completed plumb and fastened tight to stud.

  • TV mount blocking completed at South wall.

  • Wall bumper blocking completed

  • Roughin boxes are located correctly per 14/I401

E2920 Team Break

  • In wall Blocking completed at head and jamb of screen wall.

  • Wall blocking completed for millwork.

  • Confirm recessed PTC at millwork.

  • Confirm no roughin boxes along east GL wall.

  • If roughin completed to be in millwork confirm mud ring is adequate.

  • Confirm no outlet at GL wall above millwork

E2910 Project Room

  • Confirm plywood sheathing completed above partition wall.

  • Confirm additional steel support columns are installed at partition wall.

  • Confirm no roughin boxes along South GL wall.

  • Outlets centered under FEC box

E2230 Conference

  • SF blocking completed plumb and fastened tight to stud. In wall blocking at head.

  • Blocking completed along east wall for MBD-2 per 6/I400.

  • Switches are located correctly to fit between MB and door swing. See 5&6/I400.

E2860 Elec

  • Plywood sheathing completed along East wall.

E2865 Jan

  • Confirm blocking requirements.

E2870 IDF

E2835 Service Center

  • Outlets centered under FEC box (2)

E2840 Telepresence

  • SF blocking completed plumb and fastened tight to stud.

  • Wall bumper blocking completed

  • Switches are located correctly (out of door swing).

  • Wall mounted access panels roughin completed along west wall (2).

E2825 Enclave

  • SF blocking completed plumb and fastened tight to stud.

  • Wall bumper blocking completed

  • Switches are located correctly (out of door swing). No back to back boxes within same wall cavity.

E2820 Enclave

  • SF blocking completed plumb and fastened tight to stud.

  • Wall bumper blocking completed

  • Switches are located correctly (out of door swing). No back to back boxes within same wall cavity.

E2815 Recycle

  • Confirm change in door swing has been corrected.

E2805 Storage

  • Confirm HM frame change was completed.

E2704 Teaming Area

  • Added steel posts completed in partition wall.

  • No plywood sheathing at partition head.

E2692 Conference

  • Shade pocket blocking completed

  • SF blocking completed plumb and fastened tight to stud.

  • TV mount blocking completed at North wall per 4/I401

  • Wall bumper blocking completed

  • Switches are located correctly per 4/I401.

E2694 Office

  • Shade pocket blocking completed

  • SF blocking completed plumb and fastened tight to stud.

  • Furniture blocking completed at North wall per I600.

  • Switches are located correctly (out of door swing). No back to back boxes within same wall cavity.

  • Extension mullion completed with drywall cover and seal.

E2696 Office

  • Shade pocket blocking completed

  • SF blocking completed plumb and fastened tight to stud.

  • Furniture blocking completed at North wall per I600.

  • Switches are located correctly (out of door swing). No back to back boxes within same wall cavity.

E2702 Conference

  • Shade pocket blocking completed

  • SF blocking completed plumb and fastened tight to stud.

  • TV mount blocking completed at North wall per 2/I401

  • Wall bumper blocking completed

  • Switches are located correctly per 3/I401.

  • Extension mullion completed with drywall cover and seal.

E2700 Conference

  • Shade pocket blocking completed

  • SF blocking completed plumb and fastened tight to stud.

  • Wall bumper blocking completed

  • Switches are located correctly per 1/I401.

  • TV mount blocking completed at North wall per 2/I401

E2105 Conference

  • SF blocking completed plumb and fastened tight to stud.

  • MBD-2 blocking completed at North wall per 9/I400

  • Switches are located correctly per 9/I400

E2110 Enclave

  • SF blocking completed plumb and fastened tight to stud.

  • Wall bumper blocking completed

  • TV mount blocking completed at North wall per 5/I401

  • Switches are located correctly per 5/I401.

  • East wall roughin boxes 1 5/8" - 1 7/8" mud rings to accommodate wd panels.

E2100 Open Office

  • Shade pocket blocking completed

  • Outlets centered under FEC box

E2600 Open Office

  • Shade pocket blocking completed

  • Outlets centered under FEC box

E2850 Women's

  • Toilet partition blocking completed

  • Grab bar blocking complete at hc stall

  • Full height mirror blocking completed

  • Steel tubes at counters completed.

  • Recessed TSC completed.

  • Recessed PTC completed (2).

  • Recessed SNC completed

  • AOD roughin completed.

E2845 Men's

  • Toilet partition blocking completed

  • Grab bar blocking complete at hc stall

  • Full height mirror blocking completed

  • Steel tubes at counters completed.

  • Recessed TSC completed.

  • Recessed PTC completed (2).

  • AOD roughin completed.

E2856 Alcove

  • Fountain blocking completed.

E2810 Service Elevator

E2900 Elevator Lobby

  • Glazing head completed (blocking may be required).

  • MAG holder blocking and roughin completed.

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.