Information
-
TNZ 1 Ship discharge Wharf End
-
Conducted on
-
Prepared by
-
Does this audit include all controls from the most recent hazard and risk register?
-
Are all wharf hoses tested (and tagged) every6 months ?
-
Add media
-
Are tanks dipped prior to discharge and verification of volume to be received completed?is there an inspection of the hoses and camlocks prior to each discharge?
-
Add media
-
Is the maximum operating pressure set at 7 bar?
-
Add media
-
Are hoses and camlocks inspected prior to use?
-
Add media
-
Prior to and during discharge are scuppers and drains blocked ?
-
Add media
-
Are hoses placed on trolled to prevent damage and make movement simple?
-
Add media
-
Is ship to shore communication in place and does it confirm product being discharged?
-
Add media
-
Are wharf staff competent ?
-
Add media
-
Are staff wearing appropriate PPE? Neck to toe flame resistant overalls chemical resistant gloves and safety glassy
-
Add media
-
Is there a spill plan in place ?
-
Add media
-
Are spill kits available at the wharf?
-
Add media
-
Is there an ignition free zone set ?
-
Add media
-
Is there a preventative maintenance program in place ?
-
Add media
-
Add other comments
-
Add other photos
-
List all corrective actions from this audit