Information

  • TNZ 8 Bulk fuel pipeline between wharf and TNZ

  • Conducted on

  • Does this audit include all controls from the most recent hazard and risk register?

  • Pipe inspection and maintenance programme?

  • Add media

  • Is there a preventative maintenance program in place?

  • Add media

  • Are excavtors procedures examined and reviewed prior to excavating

  • Add media

  • Design of pipeline is the thickness of 25mm ?

  • Add media

  • Cathodic protection?

  • Add media

  • Pipeline inspected during product discharge ?

  • Add media

  • Is signage displayed in the area of the pipeline with the correct contact numbers ?

  • Add media

  • Add other comments

  • Add other photos

  • List all corrective actions from this audit

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.