Information
-
TNZ 8 Bulk fuel pipeline between wharf and TNZ
-
Conducted on
-
Does this audit include all controls from the most recent hazard and risk register?
-
Pipe inspection and maintenance programme?
-
Add media
-
Is there a preventative maintenance program in place?
-
Add media
-
Are excavtors procedures examined and reviewed prior to excavating
-
Add media
-
Design of pipeline is the thickness of 25mm ?
-
Add media
-
Cathodic protection?
-
Add media
-
Pipeline inspected during product discharge ?
-
Add media
-
Is signage displayed in the area of the pipeline with the correct contact numbers ?
-
Add media
-
Add other comments
-
Add other photos
-
List all corrective actions from this audit