Information
-
Document No.
-
Audit Title
-
Client
-
Conducted on
-
Prepared by
-
Site Personnel
1 - Previous inspection
-
1.1 - Has the last inspection been reviewed?
-
1.2 - Are there anyoutstanding actions?
2 - Fire Life & Safety
-
2.1 - Evacuation plan displayed and understood by all employees?
-
2.2 - Evacuation procedures and training regularly through FSA?
-
2.3 - Extinguishers in place, clearly marked for type of fire?
-
2.4 - Extinguishers recently serviced? (Check 6 monthly punch mark on tabs.)
-
2.5 - Extinguishers clear of obstructions?
-
2.6 - Extinguisher no more than 1200 mm max height & base not lower that 100 mm?
-
2.7 - Indicator signs 2.1 m above floor level?
-
2.8 - Adequate direction notices for fire exits?
-
2.9 - Exit doors easily opened from inside?
-
2.10 - Exits clear of obstructions?
-
2.11 - FIP have no unauthorised isolations or alarms?
-
2.12 - Are all fire hose reel cupboards from from rubbish and adequate signage displayed in doors?
-
2.13 - Is the sprinkler and hydrant pump room clean and in good order?
-
2.14 - No signs of diesel leaks? Diesel tank has fuel?
-
2.15 - Diesel tank and electric booster pumps are ready and fault free?
-
2.16 - Pump/Valves sets maintaining pressure?
-
2.17 - Have all the hose reels been serviced in the last 6 months?
-
2.18 - Are there any damaged or missing fire penetrations?
-
2.19 - Are all fire doors free from damage and close properly?
-
2.20 - Fire tank has no leaks?
-
2.21 - Are the log book maintenance books available and current?
-
2.22 - Main water meter:
3 - General Lighting
-
3.1 - Good natural lighting?
-
3.2 - All common area lighting in good order?
-
3.3 - Light fittings clean and in good condition?
-
3.4 - Emergency exit lighting operable?
4 - Building Safety
-
4.1 - Floor surfaces even and uncluttered?
-
4.2 - Entry and walkways kept clear?
-
4.3 - Walkways adequately and clearly marked?
-
4.4 - Intersections kept clear of boxes etc?
-
4.5 - Are liquid spills removed quickly?
-
4.6 - Are footpaths in good condition?
-
4.7 - Are all fire escape clearly marked?
5 - Building Exterior
-
5.1 - is the front of the building free of rubbish?
-
5.2 - Is there any graffiti on exterior walls or doors?
-
5.3 - Is the garden and landscaping in good condition?
-
5.4 - Is there appropriate smoking bins and signage in place?
-
5.5 - Bollards in good condition?
-
5.6 - Are the facade and glazing in good condition?
-
5.7 - Fencing and gates in working order and in good condition?
-
5.8 - Is the roller shutter in good working order and free from damage?
-
5.9 - Is the hard stand in good condition?
6 - Rubbish Removal
-
6.1 - Bins located at suitable points around site?
-
6.2 - Bins emptied regularly?
-
6.3 - Is there appropriate signage on display to ensure waste streams are placed in appropriate bins?
7 - Chemical Storage
-
7.1 - Materials stored in racks and bins wherever possible?
-
7.2 - Floors around racking clear of rubbish?
8 - Electrical Safety
-
8.1 - Have all the base build Safety switches been tested to current Australian Standards and tests recorded?
-
8.2 - Has electrical equipment been tested and tagged?
-
8.3 - No broken plugs, sockets or switches?
-
8.4 - No power leads across walkways?
-
8.5. - No frayed or damaged leads?
9 - Roof Access Ladder
-
9.1 - Are all ladders Industrial strength? (Non Household rated, check label.)
-
9.2 - Are ladders in good condition and comply with the current Australian Standard?
-
9.3 - Used according to instructions?
10 - First Aid Facilities
-
10.1 - Are cabinets and contents clean and orderly?
-
10.2 - Are contents regularly checked?
-
10.3 - No contents past their expiry date?
-
10.4 - Cabinets clearly labelled?
-
10.5 - Is there easy access to cabinets?
-
10.6 - Employees aware of location of first aid cabinet?
-
10.7 - Are first aid officers accessible?
11 - Car Parks
-
11.1 - Carpark, line markings and road surface in good condition?
-
11.2 - Is lighting adequate?
-
11.3 - Is the concrete stops in good order?
-
11.4 - Is the storage areas clean, secure and tidy?
12 - Cleaning
-
12.1 - Are all toilets adequately stocked?
-
12.2 - Entry mats clean and in good order?
-
12.3 - Is the front entry glass doors clean and free from smears and finger marks?
-
12.4 - Are the mirrors in all toilets clean and free from smears?
-
12.5 - Is the refuse area clean?
-
12.6 - Are common area tea points clean and free from rubbish?
13 - General overall conditions
-
14.1 - Are there any other areas / equipment that requires attention / repair?
14 - Pest Control
-
14.1 - Is current specification adequate for the site?
-
14.2 - Are the current level of rat boxes adequate for the site?
-
14.3 - Is there any signs of pest activity?
-
14.4 - Is there any sign of bird droppings?
15 - Preventative Maintenance
-
15.1 - Sprinklers, Pumps and FIP Tested Monthly
- Completed
- In Progress
- Not Completed
-
Comments (Date completed/when it will be completed/why is it not completed?):
-
15.2 - Fire Emergency & Exit Lighting
- Completed
- In Progress
- Not Completed
-
Comments (Date completed/when it will be completed/why is it not completed?):
-
15.3 - HVAC Preventative Maintenance
-
Comments (Date completed/when it will be completed/why is it not completed?):
-
15.4 - Roller Doors & Dock leveller:
-
Comments (Date completed/when it will be completed/why is it not completed?):
-
15.5 - Backflow/RPZ'd inspected and certified:
-
Comments (Date completed/when it will be completed/why is it not completed?):
-
15.6 - Thermal Mixing valves inspected and certified:
-
Comments (Date completed/when it will be completed/why is it not completed?):
-
15.7: Rainwater pumps and controls:
- Completed
- In Progress
- Not Completed
-
Comments (Date completed/when it will be completed/why is it not completed?):
-
15.8 - RCD tested:
- Completed
- In Progress
- Not Completed
-
Comments (Date completed/when it will be completed/why is it not completed?):
-
15.9 - Roof safety system certified:
- Completed
- In Progress
- Not Completed
-
Comments (Date completed/when it will be completed/why is it not completed?):
16 - Items requiring quoting?
17 - Items to consider for Capital Works
18 - Signoff
-
CBRE Representative:
-
Site Manager:
-
Select date