Title Page
-
Site Name
-
Conducted on
-
Prepared by
-
R.E.C Number 28287
-
Location
-
Description of container location
-
AUDIT SUMMARY / RECOMMENDATION :
-
Photo of proposed Container Location
-
Power Connection Point
-
Quantity of Poles on Circuit
-
LED or Metal Halide
-
Power Supply Size at Pylon Sign (Amps)
-
Power Supply Size (Amps)
-
Suggested Connection Description
-
Detailed Photos of Connection Point
-
Connection Type
-
Conductor Size (mm sq)
-
Is a Hard Active Available
-
Distance from Container to Connection Point (TOTAL meters)
-
Surface Type
- Concrete
- Bitumen
- Garden
-
Cable Reticulation Method
- Open Trench
- Underground Bore
- Surface Conduit
-
How many meters & description
-
How many meters & description
-
How many meters & description
-
Will traffic management required ?
Switchboard Details
-
Switchboard location on site
-
Switchboard Identification Label
-
Switchboard brand
-
Switchboard condition
-
Is switchboard compliant?
-
Switchboard photos (detailed photo with and without escutcheon)
-
Switchboard schedule photo
-
Cable Pathway (switchboard to external of building)
-
Switchboard contactors, timers or controls (photo close up)
-
Are lights PE Cell or Timer ?
-
If timer what time set on/off
-
How many spare poles
-
Is there room for a time clock (1 pole)
-
Tong test load (Amps)
-
Existing as builts or as installed drawings