Information
-
Touchwood Shop Fit Inspection
-
Unit
-
Tenant
-
Principle Contractor
-
Conducted on
-
Inspector
GENERAL H&S
-
Suitable H&S signage displayed on rear door advising of dangers?
-
Form F10 displayed on rear door of unit?
-
H&S File On Site?
-
Accident book available?
-
Contractors working in accordance with Touchwood site rules?
-
Noise levels suitable for time of day?
-
Housekeeping standards are good?
-
If hazardous substances onsite, are COSHH Risk Assessments and Material Safety Data Sheets available?
ACCESS/EGRESS
-
Escape Routes free from obstruction?
-
Service Corridor free from obstruction?
-
Correct use of goods lifts?
FIRE SAFETY
-
Fire Alarm isolated?
-
Sprinkler system isolated?
-
Impairment notice Issued to Insurer by PM?
-
Suitable extinguishers available, free from obstruction and tested within last 12 months?
-
Is there an adequate means of raising an alarm?
-
Fire Doors closed or held open by appropriate device?
-
Hoarding & fire fly installed in line with Touchwood requirements?
ELECTRICAL SAFETY
-
All portable electrical items PAT tested?
-
All tools and equipment are 110v?
-
Cables & leads in good condition
WORKING AT HEIGHT
Powered Access Equipment
-
Operators trained and competent? IPAF licence should be viewed.
-
Thorough inspection completed within last 6 months? Certificate of Inspection available?
-
Being used on firm & level ground?
-
Tyres properly inflated?
-
Safety harness being worn?
-
Are tools tethered?
-
Suitable exclusion zone created?
Scaffold Tower
-
Erected by a competent person? PASMA Licence should be checked.
-
Daily checks being completed? Scafftag or equivalent.
-
Being used on firm & level ground?
-
Suitable guard rails and toe boards?
-
Wheels locked while work in progress?
-
Are tools tethered?
-
Suitable exclusion zone created?
Ladders
-
Ladders used correctly?
Work Near Ledges
-
Suitable controls in place (e.g edge protection or fall arrest system)?
-
Suitable exclusion zone created below?
PPE
-
Suitable PPE being worn?
Waste Management
-
Are all waste streams being segregated correctly?
CONTRACTOR REPRESENTATIVE SIGNATURE
-
Add signature