Title Page
-
Cell ID
-
Site Name
-
Conducted on
-
Prepared by
-
Location
-
CELL ID
-
SITE NAME
-
DRAWING NO
-
REVISION NO
-
TOWER TYPE
-
INSPECTED BY
-
DATE
-
WEATHER (Raining, Sunny, Frost etc.)
-
CLIENT
-
PROJECT (TNA, NTQ etc.)
PRE-POUR CHECKS REQUIRED (PHOTOS MUST INPUTTED INTO THIS FORM)
-
EXCAVATION IS TO CORRECT DIMENSIONS AS PER DETAILED DESIGN DRAWING?
-
Insert Photo
-
EXCAVATION IS TO CORRECT DEPTH AS PER DETAILED DESIGN DRAWING?
-
Insert Photo
-
TOWER TEMPLATE INSTALLED IN CORRECT ORIENTATION?
-
Insert Photo
-
CONCRETE BLINDING TO BASE?
-
Instert Photo
-
TOWER TEMPLATE INSTALLED LEVEL?
-
Insert Photo
-
ALL REINFORCING STEELWORK INSTALLED AS PER DETAILED DESIGN DRAWING?
-
Insert Photo
-
EARTH MATS & LP INSTALLED AS REQUIRED?
-
Insert Photo
-
SHUTTERING SQUARE AND CHAMFER INSTALLED?
-
Insert Photo
I CONFIRM THAT ALL CHECKS HAVE BEEN COMPLETED AND CONCRETE CAN BE POURED
-
NAME
-
COMPANY
-
SIGNATURE
-
DATE