Title Page

  • Cell ID

  • Site Name

  • Conducted on

  • Prepared by

  • Location
  • CELL ID

  • SITE NAME

  • DRAWING NO

  • REVISION NO

  • TOWER TYPE

  • INSPECTED BY

  • DATE

  • WEATHER (Raining, Sunny, Frost etc.)

  • CLIENT

  • PROJECT (TNA, NTQ etc.)

PRE-POUR CHECKS REQUIRED (PHOTOS MUST INPUTTED INTO THIS FORM)

  • EXCAVATION IS TO CORRECT DIMENSIONS AS PER DETAILED DESIGN DRAWING?

  • Insert Photo

  • EXCAVATION IS TO CORRECT DEPTH AS PER DETAILED DESIGN DRAWING?

  • Insert Photo

  • TOWER TEMPLATE INSTALLED IN CORRECT ORIENTATION?

  • Insert Photo

  • CONCRETE BLINDING TO BASE?

  • Instert Photo

  • TOWER TEMPLATE INSTALLED LEVEL?

  • Insert Photo

  • ALL REINFORCING STEELWORK INSTALLED AS PER DETAILED DESIGN DRAWING?

  • Insert Photo

  • EARTH MATS & LP INSTALLED AS REQUIRED?

  • Insert Photo

  • SHUTTERING SQUARE AND CHAMFER INSTALLED?

  • Insert Photo

I CONFIRM THAT ALL CHECKS HAVE BEEN COMPLETED AND CONCRETE CAN BE POURED

  • NAME

  • COMPANY

  • SIGNATURE

  • DATE

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.