Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
SITE ACCESS AREA
-
Is an authorised Access Point being Used and as defined in the WPP ?
-
Is there sufficient site access Parking ?
-
If Required is there adequate Trackwork Site Access signage present identifying a minimum of site information / hazards / dangers, mandatory PPE requirements ?
-
Is site security adequate ( any evidence of vandalism etc )?
-
Are vehicle and pedestrian movements segregated, vehicle routes, speed limits etc ?
-
Have All Staff Been Inducted Via Site Liason?
-
Is the site access point and site lighting and sufficient ?
STAFF
-
Is there a site register for staff/visitors? Are entries correct?
-
If there is a COSS on site has everyone been Briefed ? ( If a non PTS site has everyone had a Task brief )
-
Is there Adequate supervision on site ?
-
Check on Staff / Supervisors Competence. ( add photos )
-
Are All Staff Carrying their correct competence cards?
-
Has the COSS carried out a briefing,Has everyone signed the RT9909?
-
Is the COSS, Lookout,Site Warden,Engineering Supervisor Identifiable via their respective armlets?
-
Has the COSS signed the ES Certificate? the RT3199
-
Are there enough COSS's appointed to cover the different tasks on site?
-
Is POS applicable for this worksite?
-
Add media
SITE DOCUMENTATION
-
Is the Work Package Plan ( WPP ) available on site and is it signed ? <br>If not stop works until resolved !
-
Are the Task Briefs available / adequate / and signed daily ?<br>If not stop works until resolved !
-
Are accident / incident forms available on the site ? ( QF177,287,292)
-
Where required, are the mandatory notices displayed on site ? ( F10 )
-
Is a copy of the Refusal to Work Policy available? ( SP07 )
-
Is a Permit to Dig available and is it valid? Is the mileage on the Permit correct with the Work site?<br>Is the CAT Scanner number identifiable?
-
Are Plant Certificates In date ? in the Machine ? And Daily Plant Checks complete ?
-
Is there a Loler and Puwer Register on Site and Up to date ?
-
Are Lift Plans Required ? and up to date ? ( Evidence )
-
Is a hot works Permit Required ? <br>And in place ? ( photo )
-
Is there an Electrical Isolation Permit (Form C or D) in Place? Is the COSS and or Machine Controller in possession of this?
-
Is there a SSOW pack available?
-
Is there an Inspection Test Plan (ITP) Document for the Works?
-
Is a COSHH register on Site?
-
Is there a Toolbox Talk register on Site?
-
Is a daily site report sheet and has it been filled in?
WELFARE
-
Is there adequate welfare and mess Facilities ?
-
Are toilets available ( reasonable distance, sufficient in numbers, male/female where required ) with adequate supplies ?
-
Is there adequate drinking water available ?
-
Is there means of heating water and food ?
-
Are there washing / drying facilities available ?
FIRST AID
-
Is there a nominated first aider on site ?
-
Is the First Aider in Possession of the necessary Certification
-
Has the first aider been identified to staff
-
Has the nominated first aider access to details of the nearest hospital and relevant telephone numbers ?
-
Is the first aider available at all times ?
-
Is the First Aid Kit Present / Adequate and Correct for the Number of people on site ?
FIRE PRECAUTIONS
-
Are staff aware of fire safety arrangements ?
-
Is a Fire assembly Point Defined ?
-
Are Fire extinguishes appropriate for the type of materials available for use on site
-
Are separate fire extinguishers in date ?
PLANT AND OPERATORS
-
Are all small Plant and Tools within service dates and in good condition ?
-
Are All Large Plant and Lifting Certificates in Date ? and check sheets complete ?
-
Do all Operators hold Valid Certificates for the type of Plant Being used ?
-
Are Machine Controllers Check Sheets being completed ?
-
Are all Staff Wearing the Required PPE
-
Are all Road/Rail Machines equipped with emergency equipment?<br>a) 10 detonators in a container?<br>b) 2 Track circuit operating clips?<br>c) 2 Red Flags<br>d) 1 handlamp capable of displaying a red aspect?
TOOLS AND EQUIPMENT
-
Is all equipment used for testing and measurement Calibrated and within Date ?
-
Are tools and equipment in an acceptable condition ?
-
Are All calibrated Tools and Equipment Stored Safely Overnight ?
ENVIRONMENTAL
-
Are Spill Kits available on site and in Plant ?
-
Have all environmental control measures highlighted in WPP been Implemented on site ?
-
Is there any suitable storage (bunded stores, double skinned bowsers) for oils and other potentially polluting substances?
-
Is waste correctly segregated and being disposed of in accordance with the WPP ?
-
Are materials/scrap stored in an area that does not impede on operations and stacked correctly ?
-
Have Hazardous substances been identified ?
-
Are COSHH assessments / processes available for all substances on site ?
-
Are Hazardous substances being stored correctly on site ?
-
Are Spill Kits being used and Available on site ?
-
Have any Members of Staff Raised and concerns over Environmental Issues ?
GENERAL
-
Any issues with PPE ?
-
Are there any good practices, innovations or opportunities noted?
-
Name of Personnel Spoken to on site and any issues raised
-
Are there any Subcontractors on Site ?
-
Any Non Conformances to be Raised ?
-
Signed by Author
Protection Arrangements
-
Has the COSS/ES been supplied with the SSOW Pack?
-
Have the Protection arrangements been set up in accordance with the SSOW?<br>
-
If the works are classed as a construction site, are the risk control measures sufficient to provide a safe system of work?
-
Has equipment warning (Open Line) been implemented? Have sufficient Lookouts been appointed?<br>Has this method been approved by a Director.
-
Are Lookouts/ Site Wardens in possession of the correct Kits?
-
Has a Possession of Sidings form been completed?
-
Are protecting points clamped,scotched,and locked? Does the COSS possess the key for the padlock?