Information

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

1.0 - Previous inspection

  • 1.1 - Has the last inspection been reviewed?

  • 1.2 - Are there no outstanding actions?

2.0 - Fire Prevention

  • 2.1 - Evacuation plan displayed and understood by all employees?

  • 2.2 - Evacuation procedures discussed regularly? (3 to 4 times a year)

  • 2.3 - Extinguishers in place, clearly marked for type of fire?

  • 2.4 - Extinguishers recently serviced? (Check 6 monthly punch mark on tabs.)

  • 2.5 - Extinguishers clear of obstructions?

  • 2.6 - Extinguisher no more than 1200 mm max height & base not lower that 100 mm?

  • 2.7 - Indicator signs 2.1 m above floor level?

  • 2.8 - Adequate direction notices for fire exits?

  • 2.9 - Exit doors easily opened from inside?

  • 2.10 - Exits clear of obstructions?

  • 2.11 - Fire alarm system functioning correctly?

3.0 - General Lighting

  • 3.1 - Good natural lighting?

  • 3.2 - Reflected light from walls & ceilings not causing glare to employees?

  • 3.3 - Light fittings clean and in good condition?

  • 3.4 - Emergency exit lighting operable ?

4.0 - Building Safety

  • 4.1 - Floor surfaces even and uncluttered?

  • 4.2 - Entry and walkways kept clear?

  • 4.3 - Walkways adequately and clearly marked?

  • 4.4 - Intersections kept clear of boxes etc?

  • 4.5 - Stair and risers kept clear?

  • 4.6 - Are liquid spills removed quickly?

  • 4.7 - Are railings in good condition?

  • 4.8 - Are fall preventive measures in place and used where gaps occur in railings?

  • 4.9 - Workshop footpaths in good condition?

  • 4.10 - Office and training room Furniture in sound condition?

  • 4.11 - Loading area clean and tidy?

5.0 - Work Benches Workshop

  • 5.1 - Clear of rubbish?

  • 5.2 - Tools not in use kept in place?

  • 5.3 - No damaged hand tools in use?

  • 5.4 - No damaged power tools in use?

  • 5.5 - Work height correct for the type of work and the employee?

  • 5.6 - No sharp edges?

  • 5.7 - All damaged equipment or tools are tagged out correctly?

6.0 - Rubbish Removal

  • 6.1 - Bins located at suitable points around site?

  • 6.2 - Bins emptied regularly?

  • 6.3 - Oily rags and combustible refuse in covered metal containers?

7.0 - Storage Design and Use: Workshop Area

  • 7.1 - Materials stored in racks and bins wherever possible?

  • 7.2 - Storage designed to minimise lifting problems?

  • 7.3 - Floors around racking clear of rubbish?

  • 7.4 - Racks and pallets in good condition?

8.0 - Workshop area

  • 8.1 - Overall workshop area is kept clean?

  • 8.2 - Are the floors around the machines kept clean?

  • 8.3 - Plant and equipment safety Guards in good condition?

  • 8.4 - Starting and stopping devices within easy reach of operator?

  • 8.5 - Waste/off cuts removed and stored safely?

  • 8.6 - Drip pans on floor to prevent spillage?

  • 8.7 - Adequate work space?

  • 8.8 - Is lighting adequate?

  • 8.9 - Noise levels controlled?

  • 8.10 - No bending or stooping for extended period of time required?

  • 8.11 - Are gas bottles secured?

  • 8.12 - Operators trained/inducted into the operation of the machines?

  • 8.13 - JSA &SWP available for all the tasks?

  • 8.14 - All workshop staff/workers signed off on JSA/SWP?

  • 8.15 -Do operators comply with the training?

  • 8.16 - P.P.E required to perform job safely is identified?

  • 8.17 - P.P.E storage area/container Clearly marked? Is it easily accessible?

  • 8.18 - Employees trained on how to use PPE correctly?

  • 8.19 - Are lockout procedures implemented and followed?

9.0 - Electrical Safety

  • 9.1 - Safety circuit breaker at the main board installed?

  • 9.2 - Safety switches tested every 6 months and tests recorded?

  • 9.3 - No double adapters in use?

  • 9.4 - Portable equipment tested and tagged?

  • 9.5 - No broken plugs, sockets or switches?

  • 9.6 - No power leads across walkways?

  • 9.7 - No frayed or damaged leads?

  • 9.8 - No strained leads?

  • 9.9 - Portable power tools in good condition?

  • 9.10 - Where required are emergency shut-down procedures in place?

10.0 - Chemical Safety

  • 10.1 - Hazardous Substance Register complete and available?

  • 10.2 - Material Safety Data Sheets available for all chemicals?

  • 10.3 - Risk assessments completed for hazardous substances?

  • 10.4 - All containers labelled correctly?

  • 10.5 - Unused substances disposed of?

  • 10.6 - Do special storage conditions apply?(flammable liquid and hazardous chemical are stored as legislation)

  • 10.7 - If applicable are special storage conditions followed?

  • 10.8 - Workers trained in the use of hazardous substances?

  • 10.9 - If required is PPE available?

  • 10.10 - Is adequate ventilation provided?

  • 10.11 - Are eye washes easily accessible in all areas?

13.0 - Office Hazards

  • 13.1 - Filing cabinets in good condition?

  • 13.2 - Chairs in good condition?

  • 13.3 - Desks in good condition? (No damage.)

  • 13.4 - Screen Based Equipment positioned to reduce glare from windows etc?

  • 13.5 - Photocopiers positioned at a safe distance?

  • 13.6 - Tasks designed to prevent ergonomical hazards?

  • 13.7 - Air conditioning systems regularly maintained?

  • 13.8 - Stable non-slip floor coverings in good condition?

  • 13.9 - First aid kit stocked and items within date?

Sign Off

  • On site representative

  • Auditor's signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.