Information
-
Document No.
-
Sudent Name
-
Client / Site
-
Conducted on
-
Prepared by
PPE
-
Does the student choose the correct PPE
-
Can the student put the PPE on correctly
-
Can the student decontaminate the PPE correctly
-
Can the student remove PPE correctly
-
Does the student dispose of PPE correctly
Tools and Equipment
-
Chooses the correct tool for removal
-
Identifies isolation procedures
-
checks tools for defects
-
Shows correct use of equipment
-
Uses plastic correctly for debris collection
Sampling
-
Sample method is double wrapped and made ready for transport
-
Sample documentation signed and dispatched
Decontamination
-
Student decontaminates work area
-
all dust and debris is removed
Cleanup
-
Work area is made safe of any fibres
-
Decontamination area is cleaned and removed
Documentation
-
Student demonstrates doing a risk assessment
-
Student demonstrates adjusting an Asbestos Register
-
Student demonstrates application and knowledge of the ARCP
-
Student demonstrates chain of custody procedures
-
Student demonstrates unique identifiers for samples taken
Declaration
-
I declare that the information included in this report is true and I have witnessed the student participate in the process of removing asbestos in accordance with the ARCP