Title Page

  • Conducted on

  • Park Manager (Full Name)

  • Add signature

  • Engineer (Full Name)

  • Add signature

  • Address/Plot Details

Home Details & Personnel

  • S/o Number

  • Add drawing

  • Make/Model of Home

  • Size of Home

  • Collection Date

  • Address/Plot details

  • Delivery Date

  • Engineer 1

  • Engineer 2

  • Engineer 3

  • Engineer 4

Checklist

  • Site Survey Complete

  • Manufacturers Pre-Collection Checks Complete

  • Signed in at Park Office on arrival (where applicable)

  • All relevant PPE available and used

  • Job level and watertight

  • All interior walls line up (cracks)

  • Floor level throughout & free from creaks and movement

  • All exterior doors shut and locked (no damages)

  • External joining strips complete to good standards

  • Ridge tiles fitter to good standard

  • Fascia's line up and kites fitted (no damages)

  • All materials required supplied - no shortages

  • No damage to outside of home including windows

  • All carpets/Vinyl left in good condition

  • Check furniture

  • Please Note: Check sheet to be forwarded to Tingdene Parks Limited ASAP containing as much information as possible regarding damages caused when the home has been transported and sited.

Engineers Sheet (Comments and Information of any pictures taken)

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.