Information

  • Audit Title

  • Client / Site

  • Location
  • Prepared by

  • Contact phone number

  • Conducted on

  • Other staff

  • Development Application Number

  • Complying Development Number

  • Construction Certificate Number

Inspection items

  • Trenches are free of water

  • Notes

  • Trenches are free of debris and excess spoil

  • Notes

  • Horizontal penetrations through trench system is sleeved appropriately

  • Notes

  • Trench system is on even bearing

  • Notes

  • Trench system is at correct widths and depths as per engineers details

  • Notes

  • Trench system and steel are located as per engineers details

  • Notes

  • Reinforcing steel is as per engineers details

  • Notes

  • Reinforcing steel is correctly place, lapped, tied and with the required cover

  • Notes

  • No excess steel, debris or spoil within trench system

  • Notes

  • Adequate chairs provided for cover

  • Notes

  • Formwork correctly installed and appropriate for concert placement

  • Notes

  • Development as per the Development Consent

  • Noted unauthorised development

  • Site notes

  • Photograph

Required information

  • Required information to be submitted to Council

Inspection result

  • Result of the inspection

  • Should you have any enquiries regarding this inspection report please contact Auburn City Council on 9735 1222 or via email council@auburn.nsw.gov.au or in person at the customer service centre located at 1Susan Street, Auburn.

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.