Title Page

  • Address of premises

  • Date of audit

  • Prepared by

Inspection details -

Measure Inspected

  • Fuel Type?

  • Boiler Manufacturer

  • Model

  • Boiler/Burner Condition

  • Boiler/Burner Location

  • Flue type

  • Flue Condition

  • Boiler flue properly clipped and Tapping screws fitted

  • Gas pipework condition

  • Boiler pipework inspected - Condensate Terminated correctly

  • Boiler pipework inspected - PRV

  • Magnetic filter fitted

  • MagnaClean Condition

  • Manufacturer

  • Model

  • Cylinder present?

  • Cylinder Condition?

  • Room stat condition

  • Timeclock condition

  • Visual inspection of existing plumbing, any leaks identified?

  • Condition of pipework

  • Condition of Radiatiors

  • Size of Radiator(s) to be replaced?

  • Number of TRVs

  • Condition of TRVs

  • Any TRVs missing?

  • Condition of MRVs

  • Any MRVs missing?

  • Oil tank present?

  • Oil tank condition

  • Oil tank location

  • Oil pipeline condition

  • CO Alarms in Date?

  • Number of CO Alarms

  • CO Alarm/s condition

  • Gas Cooker present?

  • Gas Cooker condition?

Audit Summary

  • Please provide details of any remedial action required:

  • Audit undertaken by (Print name)

  • Audit undertaken by (Signature)

  • Date

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.