Information
-
Audit Title
-
Document No.
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
Toolbox Talk Subject Matters discussed (and any commitments by management to investigate/follow-up on) • Correct work clothing – high vis, work boots, gloves, sunscreen/sunhat and sunglasses • Correct PPE use – gloves when accessing pits, hearing protection and safety glasses when drilling and operating the trencher • Work area tidy and delineated by barricades/witches hats/ bunting/signage • Pedestrians/road users have safe 1.2m wide access around site. Pedestrians not ‘pushed off established path’ and onto road to bypass work area unless speed <60km/h, signage and barricades in place • Maintain safe distances when operating EZ trencher. Ensuring equipment is well maintained. • Fall protection (if working greater than 1.2m above ground) • Buried/Overhead services identified and avoided • Asbestos controls/PPE in place. Waste disposed of as per asbestos training • First aid equipment shown to workers and made sure that it is readily accessible • Are trailers tidy, Tools/equipment being looked after. Trailer wheels must be chocked if not attached to a secured vehicle. • Ground being re-instated once work completed. This includes removing all waste and compacting the ground to minimise the potential for water/soil erosion • SWMS is accessible via the IPAD. dial before you dig is also available for each area on your iPad. • In an emergency, suspend work. Evacuate the area if the risk to life exists. • Discuss workers impressions of the workplace and take-on board suggestion for review.
Employee sign off.
-
Name of employee
-
Name of employee
-
Name of employee
-
Name of employee
-
Name of employee
-
Name of employee
-
Name of employee
-
Name of employee
Management sign off.
-
Managers signature.
-
Safety trainers signature.