Flight and Observation Info

  • Flight Number

  • TRMC

  • Stand

  • Conducted on

  • TSM

Flight Preperation

Flight Preperation

  • Aircraft chocked and coned in accordance with SOP

  • FOD cleared from stand and Jetty?

  • Jetty and PIDS screens correct

  • Ground time app used

  • Contact details entered

  • 7 point check completed accurately and signed on provisional loadsheet

  • Contact number and name displayed on provisional loadsheet

  • LIRF and NOTOC printed and available for use, cross reference LIRF edition number

  • Has the fuel figure been finalised

  • PPE

  • Uniform stands

  • TRMC Hat Worn<br>

  • Relevant equipment (IPad & Phone)<br>

Section Overview

Briefings

PSU Briefing

  • Confirm TOBT

  • Confirm expected boarding time

  • Confirm specials

  • Confirm hand baggage scrutiny

  • Confirm with node RTAD items and expectation

Flight crew Briefing

  • Confirm TOBT

  • Confirm fuel figure

  • Confirm slot

  • Confirm de-icing details

  • Confirm EZFW

  • Holds Checked and secured (Verbally communicated)

Cabin Crew Briefing

  • Confirm TOBT

  • Confirm passenger load

  • Confirm specials accurately

  • Confirm catering figure (short haul only)

  • Confirm curtain row divider (short haul only)

  • Confirm expected boarding time

  • Confirm fuelling in progress and secondary egress

  • Confirm OPDEF's

  • Confirm crew config

  • Was contact number given?

Loading Briefing

  • Confirm TOBT and expected doors closure

  • Confirm LIR edition

  • Confirm dead load positions and potential obstacles

  • Confirm OPDEF's

Baggage Briefing

  • Confirm TOBT

  • Confirm HOS closure and expected delivery time to A/C

  • Confirm any expected gate baggage

  • Confirm red bags

Section Overview

Departure

Expectations during departure

  • Confirm fuel figure with re-fueller and radio number

  • Board on time?

  • Area's Visited

  • Partial's sent

  • Monitored boarding status and make informed decisions in line with CGOT processes

  • Was BPC Called

  • Was there a baggage offload

  • Was loading and baggage informed in timely manner

Safety

  • Ensured cones were not removed before holds were closed

  • Ensured Correct PPE worn by all ramp teams.

  • Ensured all safety rails were engaged on loading equipment

Section Overview

Post Departure

Finalisation Process

  • TOB confirmed with gate team

  • TOB confirmed with Cabin Crew

  • PCA disconnected in accordance with process<br>

  • Jetty removed in a timely manner (Dual Jetty Boarding Only)

  • Final stand checks ( Holds closed, ACM tug on stand, No volcan dollies behind aircraft.)

  • Confirm final load with Loading Team Leader

  • Cross check LIR details against CLC instruction and ensure AAA requirements are met.

  • NOTOC signed

  • AAA form signed before pushback

  • iLoad sent within agreed target<br>

  • DVR delivered in contingency

  • Firearm / Fuel signal sent

Delay allocation

  • TOBT kept up to date

  • Was the departure delayed?

  • Delay passed to Airport Centre?

  • Delay passed to owning department?

  • Delay information clearly and accurately reflected on Ground time app and FIco

Section Overview

Behaviours / PM

Professional

  • Acts as a role model?

  • Accountable?

Leadership

  • Decision making?

  • Resilience?

  • Motivator?

  • Challenges effectively?

Planning & Operations

  • Time management / departure and punctuality protection?

  • Anticipation / Thinking ahead / Adapting to change

Relationship Building and Communications

  • Effective communicator at all levels?

  • Team player?

Overview

Conclusions

  • RTG Achieved

  • On time departure achieved

  • Within 15mins Achieved

  • TRM

  • TSM

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.