Flight and Observation Info
-
Flight Number
-
TRMC
-
Stand
-
Conducted on
-
TSM
Flight Preperation
Flight Preperation
-
Aircraft chocked and coned in accordance with SOP
-
FOD cleared from stand and Jetty?
-
Jetty and PIDS screens correct
-
Ground time app used
-
Contact details entered
-
7 point check completed accurately and signed on provisional loadsheet
-
Contact number and name displayed on provisional loadsheet
-
LIRF and NOTOC printed and available for use, cross reference LIRF edition number
-
Has the fuel figure been finalised
-
PPE
-
Uniform stands
-
TRMC Hat Worn<br>
-
Relevant equipment (IPad & Phone)<br>
Section Overview
Briefings
PSU Briefing
-
Confirm TOBT
-
Confirm expected boarding time
-
Confirm specials
-
Confirm hand baggage scrutiny
-
Confirm with node RTAD items and expectation
Flight crew Briefing
-
Confirm TOBT
-
Confirm fuel figure
-
Confirm slot
-
Confirm de-icing details
-
Confirm EZFW
-
Holds Checked and secured (Verbally communicated)
Cabin Crew Briefing
-
Confirm TOBT
-
Confirm passenger load
-
Confirm specials accurately
-
Confirm catering figure (short haul only)
-
Confirm curtain row divider (short haul only)
-
Confirm expected boarding time
-
Confirm fuelling in progress and secondary egress
-
Confirm OPDEF's
-
Confirm crew config
-
Was contact number given?
Loading Briefing
-
Confirm TOBT and expected doors closure
-
Confirm LIR edition
-
Confirm dead load positions and potential obstacles
-
Confirm OPDEF's
Baggage Briefing
-
Confirm TOBT
-
Confirm HOS closure and expected delivery time to A/C
-
Confirm any expected gate baggage
-
Confirm red bags
Section Overview
Departure
Expectations during departure
-
Confirm fuel figure with re-fueller and radio number
-
Board on time?
-
Area's Visited
- Gate Team
- Node
- Ramp
-
Partial's sent
-
Monitored boarding status and make informed decisions in line with CGOT processes
-
Was BPC Called
-
Was there a baggage offload
-
Was loading and baggage informed in timely manner
Safety
-
Ensured cones were not removed before holds were closed
-
Ensured Correct PPE worn by all ramp teams.
-
Ensured all safety rails were engaged on loading equipment
Section Overview
Post Departure
Finalisation Process
-
TOB confirmed with gate team
-
TOB confirmed with Cabin Crew
-
PCA disconnected in accordance with process<br>
-
Jetty removed in a timely manner (Dual Jetty Boarding Only)
-
Final stand checks ( Holds closed, ACM tug on stand, No volcan dollies behind aircraft.)
-
Confirm final load with Loading Team Leader
-
Cross check LIR details against CLC instruction and ensure AAA requirements are met.
-
NOTOC signed
-
AAA form signed before pushback
-
iLoad sent within agreed target<br>
-
DVR delivered in contingency
-
Firearm / Fuel signal sent
Delay allocation
-
TOBT kept up to date
-
Was the departure delayed?
-
Delay passed to Airport Centre?
-
Delay passed to owning department?
-
Delay information clearly and accurately reflected on Ground time app and FIco
Section Overview
Behaviours / PM
Professional
-
Acts as a role model?
-
Accountable?
Leadership
-
Decision making?
-
Resilience?
-
Motivator?
-
Challenges effectively?
Planning & Operations
-
Time management / departure and punctuality protection?
-
Anticipation / Thinking ahead / Adapting to change
Relationship Building and Communications
-
Effective communicator at all levels?
-
Team player?
Overview
Conclusions
-
RTG Achieved
-
On time departure achieved
-
Within 15mins Achieved
-
TRM
-
TSM