Title Page
-
Store
-
Franchisee
-
Conducted on
-
Report prepared by
-
DPG present
Handover Checks
Frontage
-
Door/Disabled Access
-
Signage
-
Windows
-
Laminates
-
Outside areas
Customer Area
-
Ceiling
-
Sneeze guard
-
Laminates
-
Lighting
-
Walls/tables/chairs eto
-
Trims
-
Panelling
-
Beech door
-
Locks
-
Door closers
-
Flooring
Driver's Door
-
Closing mechanism
-
Maglock
Front Counter
-
Trim
-
Woodwork
-
Computers with PULSE working
-
Till (if needed)
-
Shelving
-
Telephone lines
-
Panic alarms
Steelwork
-
Stretch
-
Cut table
-
Hot rack
-
Routing keyboard
-
Makeline keyboard
-
Computer monitors
-
Level surfaces throughout
Kitchen
-
Tiling
-
Grouting
-
Hand sink
-
Hand towels dispenser
-
Soap dispenser
-
Electrics
-
Ice cream freezer
-
Coke fridge
-
-
Hot rack
-
Map
-
Frames/job aids
-
Safe (if needed)
Equipment
-
Makeline
-
Oven
-
Slap table
-
Hot bag racking
-
CCTV
-
Alarm
-
Computers
-
Freezer
-
Fridge
-
Phone system
-
Air con unit
Washing Up Area
-
3 Bay sink
-
Drying racks
-
Washing machine fittings
Dry Store
-
Racks
-
Flooring
-
Wall
-
Door
-
Office
-
Telephone lines
-
Desk
-
Computer cabling
-
Sealant
-
Appropriate shelving
-
CCTV
-
Panic Alarm
Chiller
-
Racking
-
Flooring
-
Seals
-
Cleanliness
Rear Door
-
Locks
-
Door closer
-
Peep hole
Rear Area
-
Surface
-
Ash tray
-
Bin Area
-
Lighting
Toilets
-
Working
-
Locks
-
Toilet roll holder
-
Soap dispenser
-
Paper towel holder
-
Signage
Commissary Route
-
Sufficient cladding
-
Alarm Access - at front
-
Ramps
-
Door secure