Information
-
Service Order Number/Site Name
-
Address
-
Conducted on
-
Prepared by
-
Tech/Company
-
Please confirm which area type the FNT is identified?
-
Faulty Network Category
- OSB Hard Surface Reinstatement
- Blocked Duct (Fixed Fibre) 4.2.1
- Blocked Microduct issues 4.2.2
- Re-position / Create Lateral (Drop off / Duct Tee) 4.2.4
- Repair Damaged FAT 4.2.3
- UFB network fibre - Locate / Repair feeder fibre issues 4.2.5
- UFB Splitter - Replace Splitter 4.2.6
- PON issue - Inside plant to investigate / repair / reseet and correct PON Connection 4.2.7
-
Please select Surface Type
-
Panel dimensions of area reinstated e.g. 2.0m x 3.5m = 7msq
-
Evidence Cam images before reinstatement
-
Evidence Cam Images of Permanent Reinstatement
-
Area of reinstatement p/msq e.g. 2.0m x 3.5m = 7msq
-
Evidence Cam images before reinstatement
-
Evidence Cam Images of Permanent Reinstatement
-
Notes:
-
Notes:
-
Terminal ID / Service enclosure ID where Faulty Network claim has originated from
-
Has the Field Manger given permission to excavate
-
Why have you not obtained FM approval?
-
Has all trouble shooting been completed as per ND0563 v2.4 before excavating?
-
Why hasn't trouble shooting been completed before excavating?
-
Please Select where Fault is located on the Network
-
Please select Network Fault?
- 50/100mm MH to boundary
- 50/100mm MH to BDD
- 50/100mm MH to HH
- 50/100mm BDD to BDD
- 50/100mm MH to Pedestal
- Duct blocked at Lateral
- Duct blocked at Manhole
- Duct Blocked at POE
-
Detailed description of the blockage cause
-
Evidence Cam Image of location before excavation to give perspective of where fault was,
-
Evidence Cam Image of network fault (What have you found)
-
Evidence Cam Image of network repair (What did you repair)
-
Where is fault located on Network?
-
Detailed description of the blockage cause
-
Evidence Cam Image of location before excavation to give perspective of where fault was,
-
Evidence Cam Image of network fault (What have you found)
-
Evidence Cam Image of network repair (What did you repair)
-
Detailed description of the blockage cause
-
Evidence Cam Image of location before excavation to give perspective of where fault was,
-
Detailed description of the issue
-
Evidence Cam Image of network fault (What have you found)
-
Evidence Cam Image of network repair (What did you repair)
-
Please Select where Fault is located on the Network
-
Detailed description of the blockage cause
-
Evidence Cam Image of location before excavation to give perspective of where fault was,
-
Evidence Cam Image of network fault (What have you found)
-
Evidence Cam Image of network repair (What did you repair)
-
Detailed description of the need for duct access
-
Evidence Cam Image of location before excavation to give perspective of where fault was,
-
Evidence Cam Image of network fault (What have you found)
-
Evidence Cam Image of network repair (What did you repair)
-
Detailed description of the blockage cause
-
Evidence Cam Image of location before excavation to give perspective of where fault was,
-
Evidence Cam Image of network fault (What have you found)
-
Evidence Cam Image of network repair (What did you repair)
-
Dig and fix at straight joint
- Sediment build up
- Dig and fix of kinked tube
- Unseated connector.
- Tubes jointed incorrectly
-
Detailed description of the blockage cause
-
Evidence Cam Image of location before excavation to give perspective of where fault was,
-
Evidence Cam Image of network fault (What have you found)
-
Evidence Cam Image of network repair (What did you repair)
-
Dig and fix at clamshell
- • Sediment build up
- • Kinked or crushed tube
- • Unseated connector.
-
Evidence Cam Image of location before excavation to give perspective of where fault was,
-
Detailed description of the blockage cause
-
Evidence Cam Image of network fault (What have you found)
-
Evidence Cam Image of network repair (What did you repair)
-
Please Select what plant was damaged / Repaired
-
Damaged IFDB
-
Evidence Cam Image of location before excavation to give perspective of where fault was,
-
Evidence Cam Image of network fault (What have you found)
-
Evidence Cam Image of network repair (What did you repair)
-
Damaged ABFAT
-
Evidence Cam Image of location before excavation to give perspective of where fault was,
-
Evidence Cam Image of network fault (What have you found)
-
Evidence Cam Image of network repair (What did you repair)
-
Damaged FAT
-
Evidence Cam Image of location before excavation to give perspective of where fault was,
-
Evidence Cam Image of network fault (What have you found)
-
Evidence Cam Image of network repair (What did you repair)
-
Damaged Aerial FAT
-
Evidence Cam Image of location before excavation to give perspective of where fault was,
-
Evidence Cam Image of network fault (What have you found)
-
Evidence Cam Image of network repair (What did you repair)
-
Re-position lateral / drop off / Install duct tee or install new lateral / Network Extension
-
Detailed description of why works are required
-
Evidence Cam Image of location before excavation to give perspective of location of works
-
Evidence Cam Image of excavation
-
Evidence Cam Image of network extension (Works undertaken)
-
Creating new Ribbonet Drop off
-
Detailed description of why works are required
-
Evidence Cam Image of location before excavation to give perspective of location of works
-
Evidence Cam Image of excavation
-
Evidence Cam Image of network extension (Works undertaken)
-
Installation of New Lateral
- Network extension from Pole to boundary
- Network extension from BDD to boundary
- Network extension from MH to boundary
- Network extension from FAT to Pole
- Network extension from Pole to BDD
- Other
-
Detailed description of why works are required
-
Evidence Cam Image of location before excavation to give perspective of location of works
-
Evidence Cam Image of excavation
-
Evidence Cam Image of network extension (Works undertaken)
-
UFB Network fibre - locate, repair feeder fibre issues
-
Fibre fault found between OFDC and
-
Evidence Cam Image of location before excavation to give perspective of where fault was,
-
Evidence Cam Image of network fault (What have you found)
-
Evidence Cam Image of network repair (What did you repair)
-
Fibre fault found between FAT and
-
Evidence Cam Image of location before excavation to give perspective of where fault was,
-
Evidence Cam Image of network fault (What have you found)
-
Evidence Cam Image of network repair (What did you repair)
-
Fibre fault found between FFP and
-
Evidence Cam Image of location before excavation to give perspective of where fault was,
-
Evidence Cam Image of network fault (What have you found)
-
Evidence Cam Image of network repair (What did you repair)
-
Fibre fault found between Cabinet and
-
Evidence Cam Image of location before excavation to give perspective of where fault was,
-
Evidence Cam Image of network fault (What have you found)
-
Evidence Cam Image of network repair (What did you repair)
-
Fibre fault found between Exchange and
-
Evidence Cam Image of location before excavation to give perspective of where fault was,
-
Evidence Cam Image of network fault (What have you found)
-
Evidence Cam Image of network repair (What did you repair)
-
4.2.6 - UFB Splitter - replace splitter
-
Evidence Cam Image of location before excavation to give perspective of where fault was,
-
Evidence Cam Image of network fault (What have you found)
-
Evidence Cam Image of network repair (What did you repair)
-
4.2.7 - PON Issue - inside plant to investigate, repair, reset and correct PON connection
-
Evidence Cam Image of location before excavation to give perspective of where fault was,
-
Evidence Cam Image of network fault (What have you found)
-
Evidence Cam Image of network repair (What did you repair)
-
Did you have network plans on site before excavating?
-
Please upload Netmap and UFB Asbuilds used
-
Why have you worked without network plans?
-
Faulty Network Code
-
Evidence Cam Image of Permanent reinstatement
-
Evidence Cam Image of reinstatement showing site left in a temporary safe state
-
Faulty Network Code
Breakdown of Time 'in hours' & Materials
-
Number of Technicians on site
-
Total time for testing, locating, excavation & repair per technician in hours
-
Total time for closure of excavations, & soft / temp reinstatement per technician in hours
-
Total time for quality control, iAuditor, FPA, RONS, Asbuilts, CNA & HSE per technician in hours
-
Total time on site claimed per technician in hours
-
Total hours to be invoiced in hours
-
Breakdown of materials used, e.g. 100m ruggedize, 2x bags top soil
-
Total cost of materials used
-
Sub Contractor/Equipment Hire invoice if applicable
-
Please provide cost (mark-up incl.)
-
Please upload copy of Invoice