Description
What was done and why was done.
-
Concern Received ?
-
Please attach consent form
-
Attach before task picture
-
Attached during work picture with the label ( Eg: Blockage, cut concrete, re-position of drop off, blew fibre etc)
-
After finished work Picture ( Eg: Reinstatement )
-
-
Payment Code
- N-552 SDU connection off an MDU Build Existing Drop Network
- N-554 SDU Connection off an MDU Build Existing Pathway
- N-701 Scope NGA Install- Full Scope
- N-702 Scope NGA Install - Half Scope
- N-790 Installation of ONT & Network Connection
- N-B10 Install Small pit and Lid less than dimension of 1200MM
- N-B19 Install Hand Hole
- N-B22 L2 Traffic Management ( Berm)
- N-B23 L2 Traffic Management (Road)
- N-C04 Duct in grass - Outside Boundary
- N-C04A- Duct in footpath ( Seal)- Outside Boundary
- N-C04B Duct in roadway - Outside Boundary
- N-C04C- Duct Thrusting - Outside Boundary
- N-733 Install surface mounted service conduit
- N-734 Connect microduct and install fibre ETP
- N-735 Extend communal pole infrastructure (ABF)
- N-703 Install Aerial Lead in ( 1 Span)
- N-705 Span rate for aerial provisioning (>1 Span)
- N-706 Blow fibre through 5mm tube from FFP or ABfat to fibre ETP
- N-707 Install fixed fibre or ruggedised through communal network to Boundary
- N-741Install service lead from end of communal network to fibre ETP location
- N-C12 Haul through existing empty ducts
- N-C12A Overhaul through ducts containing existing network
- N-C12B Haul subduct through existing ducts
- N-C12C Haul extra subduct through existing ducts
- N-C12D Fibre loops in manroles
- N-C12G Blow air blown fibre cable through microducts
- N-C12H Air blown fibre loops in manholes
- N-C12M Joint Single - way microduct
- N-C12I Joint 2-4 Way Microduct
- N-C12J Joint 5-7 Way microduct
- N-D01, N-D02, N-D03 Inside boundary trenching - base rate
- N-G01 - N-G06 Inside Boundary reinstatement & Extra/ Over
- N-MC21 Inside boundary locate, dig & repair blocked or damaged duct
- N-760 Standard Lateral
- N-761 Stabdard Lateral extra rate for additional tubes
-