Information
-
Project Name
-
Project Manager
-
Construction Manager
-
Project Superintendent
-
Conducted on
-
Prepared by:
- Scott Pipicelli
- Justin Miller
- Peter Shackford
-
Scope of Work:
Hazard Assessment
-
Crane / Hoisting Operations
-
Third Party Inspection on file?
-
Is Lift Plan available?
-
Unauthorized personnel removed from hoisting radius?
-
Scaffolding
-
Daily Inspection Documented?
-
Scaffold Design Meets OSHA Criteria (access, fully decked, fall protection, toe boards)
-
Scaffold Free of Accumulated Debris
-
Permit Required Confined Spaces
-
Permit Completed and Visible
-
Fresh Air Ventilation
-
UCONN Fire Department Notified of PRCS Entry Location.
-
Working from Heights
-
Perimeter Edge Protection
-
Holes / Openings / Skylight Protection
-
Personal Fall Arrest / Restraint Systems
-
Hot Work
-
Hot Work Permit Posted
-
Fire Extinguishers Available?
-
Flammable / Combustible Material Storage
-
Environmental Abatement
-
Asbestos
-
Lead
-
PCB's
-
Mold
Safe Work Practices
-
Unsafe Conditions and/or Behaviors
Observation & Corrective Action
-
Positive Findings
Note / Observation
-
Student / Faculty Protection
Notes / Observationa
Signatures
-
HC&A Representative
Pictures
-
Add media
-
Add media
-
Add media