Information
-
Job number
-
Cabinet ID
-
Location
-
Conducted on
-
All underground plans available?
-
Emap for whole FFP?
On-field Scoping
-
Type of deployment?
-
Use of existing duct?
-
Existing fibre?
-
Vacant subduct?
-
Asbestos duct?
-
Steel duct?
-
Tree roots?
-
Storm water in road?
-
Transformers?
-
Survey marks?
-
Power pillars?
-
Pylons?
-
Power cables down poles?
-
Manholes? Types?
-
Cell towers?
-
Hazards - environmental hazards etc.?
-
Gas markers?
-
Nova gas markers?
-
Decorative pavings?
-
Historic markers/statues?
-
Priority customers - schools, MDU's, medical centres, retirement villages etc.?
-
Bridges?
-
Mobility scooters?
-
Cycle ways?
-
Bus ways?
-
Anti-skid surfaces?
-
NBAP's - telephones, bus stops etc.?
-
Network on private property?
-
Reinstatment quality?
-
Surface conditions of the road - footpath types, condition, reseal markings etc.?
-
Rock indicators - house built on flat surface, old rock walls etc.?
-
Road crossings required?
-
Other construction sites - clash of work, working corridor etc.?
Chorus Network
-
Roadway manholes?
-
Advise Deployment Manager for contractor allocation to raise manholes.
- $4,000 budget
- Prove duct to the next manhole
- create DRF -
Check manholes - lid position against underground plans
-
Open manholes - confirm usability and record hazards e.g. oil slick, extra depth etc.
Office Work
-
Mark-up high level design and save PDF
-
Liaise with designer
-
Report preparation - include link to photos and videos