Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Environment
-
Erosion and sediment controls in place, catch pits protected, stockpiles protected (eliminate where possible, secured with plastic)
-
Have Fuels/Oils/Chemicals been removed from site?
-
Is a monitoring/inspection program in place for active/secured sites? Is there a review in place to be carried out at least every 3 days?
-
Site access and security arrangements including fencing/hoarding in place for Christmas period, if required?
-
Contact person(s) agreed and communicated to relevant stakeholders (eg: Regulator/Client)
-
Has site equipment and machinery been removed from site watercourses and drainage lines?
Safety
-
All bins and skips on site removed
-
Are All work areas are clear from debris and equipment removed off site? eg: fencing, barriers.
-
Are safety barriers secure (tied/fixed in place)
-
Where practicable, have all excavation been back filled? If not why, and explain how they have protected them. E.g. Plate, safety fences
-
Where excavation are unable to be filled. Are the excavation sites secure? (Barricades have been put in place). Is all temporary reinstatements compliant? E.g. Cold mix
-
Have all trip hazards been eliminated?
-
Are all signs removed from site? (Except sites with open/secured excavations).
Completed audit
-
Other Comments
-
Signature of Site Manager Representative
-
Date
-
Completed checklists should be emailed to SEQ mailbox (vplseqnz@visionstream.co.nz) for entry into Cintellate.