Title Page

  • Conducted on

  • Prepared by

  • Location
  • Photo of open Flash-9 pit with dome down - showing correct labeling of dome, joint bundle wrapped and no slumping or subsidence around pit

  • 2x Photos of inside of Flash-9 pit with dome upright - showing bedding in base of pit, ribbonet routing around the pit, and ducts entering either side of pit

  • Photo of Flash-9 dome upright with lid removed - showing 5mm tubes trimmed and end capped, spare O-Ring and sticky dot label sheets in place

  • Side view photo/s of Flash-9 dome upright with lid removed - showing 12mm tubes with gas seal, critchley labeling, working fibre tubes spiral wrapped

  • 5x Photos of trays inside Flash-9 - Side A tray 1, tray 2 with lid on, tray 2 with lid off showing spliced splitters, tray 3 and tray 4

  • Photo of UMS tray with cover off - showing fibre routing behind the yellow foam dividers

  • Photo of Flash-9 with lid in place, bolts in place and lifter-bung in place

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.